Back to kitchen remodel contractors
Padraig Devlin Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Sep 2026
- Last 24 months
- 8 permits filed
38 permits since 2000: 28 completed, 6 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
7 kitchen remodel permits: 2 completed, 5 in progress. Typically 0 days from filing to permit and 45 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2026 | In progress issued Aug 2026 | 236 Moulton St | kitchen remodel in kind - replace cabinets, new outlet, replace faucet, and replace sink all in kind. no change to floor layout. no change to wall layout. no structural work.Details
kitchen remodel in kind - replace cabinets, new outlet, replace faucet, and replace sink all in kind. no change to floor layout. no change to wall layout. no structural work. | $15,000 |
| Jul 30, 2026 | In progress issued Sep 2026 | 819 Lyon St | demo of (e) chimneys at 1st, 2nd & 3rd fl. remodel (e) kitchen at 1st fl. relocate (e) furnace at garage. remove two (e) windows at (e) garage & add a door. remodel (e) kitchen & add a new bathroom, washer and dryer and closets at 2nd fl. ref bpa#202606183562.Details
demo of (e) chimneys at 1st, 2nd & 3rd fl. remodel (e) kitchen at 1st fl. relocate (e) furnace at garage. remove two (e) windows at (e) garage & add a door. remodel (e) kitchen & add a new bathroom, washer and dryer and closets at 2nd fl. ref bpa#202606183562. | $90,000 |
| Jun 18, 2026 | In progress issued Jun 2026 | 819 Lyon St | first floor unit: demo kitchen, install new cabinets and counter tops, new electrical plugs, new sink in kitchen. update plumbing and electrical.Details
first floor unit: demo kitchen, install new cabinets and counter tops, new electrical plugs, new sink in kitchen. update plumbing and electrical. | $30,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 395 Euclid Av | unit 305 : nov# 202428003 cosmetic remodel of bathroom kitchen and laudnry and repair and replace all fixtures as needed.Details
unit 305 : nov# 202428003 cosmetic remodel of bathroom kitchen and laudnry and repair and replace all fixtures as needed. | $7,000 |
| Dec 6, 2023 | In progress issued Dec 2023 | 321 Langton St | demo existing kitchen and install new kitchen.replace cabinets,sink, countertopDetails
demo existing kitchen and install new kitchen.replace cabinets,sink, countertop | $5,000 |
| Mar 24, 2021 | Completed final sign-off Apr 2021 | 640 De Haro St | kitchen remodel. no alteration of wall, window and doors.Details
kitchen remodel. no alteration of wall, window and doors. | $4,000 |
| Jul 30, 2014 | Completed final sign-off Sep 2014 | 536 Leavenworth St | repairing kitchen fittini cabinets & counter top. tile bathroom tub paint. replace bathroom window not visable from street. u-factor 0.32 max. maher- compliance with ordinance no. 155-13. not required.Details
repairing kitchen fittini cabinets & counter top. tile bathroom tub paint. replace bathroom window not visable from street. u-factor 0.32 max. maher- compliance with ordinance no. 155-13. not required. | $9,000 |