Back to bathroom remodel contractors
Padraig Devlin Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Nov 2026
- Last 24 months
- 11 permits filed
41 permits since 2000: 28 completed, 9 in progress, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 5
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
6 bathroom remodel permits: 2 completed, 4 in progress. Typically 17 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 18, 2026 | In progress filed Nov 2026, not yet issued | 1211 Guerrero St | to comply with nov 202664087 - moved the kitchen to new location and added 2 new bathrooms. downstairs: kitchen remodel and added 1 bathroom.Details
to comply with nov 202664087 - moved the kitchen to new location and added 2 new bathrooms. downstairs: kitchen remodel and added 1 bathroom. | $100,000 |
| Jul 30, 2026 | In progress issued Sep 2026 | 819 Lyon St | demo of (e) chimneys at 1st, 2nd & 3rd fl. remodel (e) kitchen at 1st fl. relocate (e) furnace at garage. remove two (e) windows at (e) garage & add a door. remodel (e) kitchen & add a new bathroom, washer and dryer and closets at 2nd fl. ref bpa#202606183562.Details
demo of (e) chimneys at 1st, 2nd & 3rd fl. remodel (e) kitchen at 1st fl. relocate (e) furnace at garage. remove two (e) windows at (e) garage & add a door. remodel (e) kitchen & add a new bathroom, washer and dryer and closets at 2nd fl. ref bpa#202606183562. | $90,000 |
| Jan 17, 2026 | In progress issued Nov 2026 | 572 San Jose Av | rear addition to an existing 2 story, 2 family dwelling. interior renovations including new kitchen and bathrooms.Details
rear addition to an existing 2 story, 2 family dwelling. interior renovations including new kitchen and bathrooms. | $100,000 |
| Sep 5, 2024 | In progress issued Sep 2024 | 395 Euclid Av | unit 305 : nov# 202428003 cosmetic remodel of bathroom kitchen and laudnry and repair and replace all fixtures as needed.Details
unit 305 : nov# 202428003 cosmetic remodel of bathroom kitchen and laudnry and repair and replace all fixtures as needed. | $7,000 |
| Apr 18, 2023 | Completed final sign-off Jun 2023 | 4450 24th St | comply with nov# 202305710. to comply with notice of violation-window replacement and remodel of existing basement bathroom.Details
comply with nov# 202305710. to comply with notice of violation-window replacement and remodel of existing basement bathroom. | $20,000 |
| Jul 30, 2014 | Completed final sign-off Sep 2014 | 536 Leavenworth St | repairing kitchen fittini cabinets & counter top. tile bathroom tub paint. replace bathroom window not visable from street. u-factor 0.32 max. maher- compliance with ordinance no. 155-13. not required.Details
repairing kitchen fittini cabinets & counter top. tile bathroom tub paint. replace bathroom window not visable from street. u-factor 0.32 max. maher- compliance with ordinance no. 155-13. not required. | $9,000 |