Pacific Contracting
- Based in
- Rodeo
- On San Francisco permits
- Jan 2016 to Aug 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 0 days from filing to permit and 622 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2022 | Completed final sign-off May 2024 | 1230 Sacramento St | dryrot repairs, in-kind deck repair. all work in-kind,without alterations. in kind stair replacement w/ new p.t. stringers and framing members. replace some decking on second floor roof deck. replace 2 sets of french door in kind; replace 2 sets of swinging windows in kind. same sizeDetails
dryrot repairs, in-kind deck repair. all work in-kind,without alterations. in kind stair replacement w/ new p.t. stringers and framing members. replace some decking on second floor roof deck. replace 2 sets of french door in kind; replace 2 sets of swinging windows in kind. same size | $47,025 |