Pacific Contracting
- Based in
- Rodeo
- On San Francisco permits
- Jan 2016 to Aug 2023
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 27 days from filing to permit and 315 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2023 | Completed final sign-off Jul 2024 | 1230 Sacramento St | revision to pa# 202209071980. remove all (e) deck framing at 3 locations along with non-compliant hand rail. provide new deck framing along with new handrail system as show on drawing. waterproof (e) roof under same 3 roofs are to be removed and waterproofed.Details
revision to pa# 202209071980. remove all (e) deck framing at 3 locations along with non-compliant hand rail. provide new deck framing along with new handrail system as show on drawing. waterproof (e) roof under same 3 roofs are to be removed and waterproofed. | $40,000 |