Back to kitchen remodel contractors
Oudi Construction Dba Audi Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jul 2026
- Last 24 months
- 10 permits filed
26 permits since 2000: 13 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
9 kitchen remodel permits: 4 completed, 4 in progress, 1 never finaled. Typically 10 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 1, 2026 | In progress issued Jul 2026 | 3895 Clay St | total kitchen remodeling and total bathroom remodeling in kind. new cabinets, new counter tops & new flooring. for the bathroom new flooring, new fixturesDetails
total kitchen remodeling and total bathroom remodeling in kind. new cabinets, new counter tops & new flooring. for the bathroom new flooring, new fixtures | $25,000 |
| Dec 1, 2025 | Completed final sign-off Jun 2026 | 163 Moffitt St | legalize 1st fl office to be converted to master bed. install new master closet & master bath at 1st fl. remove (e) wall between kitchen & living room. rehabilitate existing kitchen.Details
legalize 1st fl office to be converted to master bed. install new master closet & master bath at 1st fl. remove (e) wall between kitchen & living room. rehabilitate existing kitchen. | $60,000 |
| Sep 22, 2025 | In progress issued Mar 2026 | 555 Fulton St | prop h: ti into a coffee cafe w/ front seating area. demo portions of concrete slab to provide under-slab plumbing. new work consist interior walls to build commercial kitchen, storage area, & accessible customer restroom. (n) ceiling soffit service counter area & drop ceiling @ rear kitchen/storageDetails
prop h: ti into a coffee cafe w/ front seating area. demo portions of concrete slab to provide under-slab plumbing. new work consist interior walls to build commercial kitchen, storage area, & accessible customer restroom. (n) ceiling soffit service counter area & drop ceiling @ rear kitchen/storage | $480,000 |
| Apr 18, 2025 | In progress issued Apr 2025 | 781 11th Av | revision to permit 202503101937 to include patch sheet rpck & tile to hallway, living room, dining room, bedrooms. perform drywall patch & replace throughout hallway, kitchen, bathrooms, living room, dining room, bedrooms. complete remodel of bathrooms and kitchen countertops, cabinets, appliances.Details
revision to permit 202503101937 to include patch sheet rpck & tile to hallway, living room, dining room, bedrooms. perform drywall patch & replace throughout hallway, kitchen, bathrooms, living room, dining room, bedrooms. complete remodel of bathrooms and kitchen countertops, cabinets, appliances. | $10,000 |
| Mar 10, 2025 | In progress issued Mar 2025 | 781 11th Av | patch, sheetrock, and retile: bathroom and kitchen.Details
patch, sheetrock, and retile: bathroom and kitchen. | $19,000 |
| Feb 18, 2025 | Completed final sign-off Oct 2025 | 101 Otsego Av | 1)comply w/ enf2024-005956enf: removal of shed excess.2)remove existing unpermitted kitchen at 1st floor filed under seperate permit. 3) remove two sheds in the back to comply w/ allowance 100 sq ft of rear yard shed.Details
1)comply w/ enf2024-005956enf: removal of shed excess.2)remove existing unpermitted kitchen at 1st floor filed under seperate permit. 3) remove two sheds in the back to comply w/ allowance 100 sq ft of rear yard shed. | $7,000 |
| Feb 28, 2019 | Never finaled issued Jul 2019, no final | 658 06th Av | unit a. kitchen and bathroom remodel. updating drywall, electrical and painting.Details
unit a. kitchen and bathroom remodel. updating drywall, electrical and painting. | $55,000 |
| Jun 7, 2017 | Completed final sign-off Jul 2018 | 658 06th Av | unit #a: (front building only) remodel 1 kitchens, 2 bathrooms upgrade ele. patch walls & paintDetails
unit #a: (front building only) remodel 1 kitchens, 2 bathrooms upgrade ele. patch walls & paint | $60,000 |
| Sep 25, 2009 | Completed final sign-off Dec 2009 | 25 Kiska Rd | changing kitchen cabinets, installing new kitchen lights, painting, texture & taping. install closet doorsDetails
changing kitchen cabinets, installing new kitchen lights, painting, texture & taping. install closet doors | $2,000 |