Back to kitchen remodel contractors
Ortizlaw Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Apr 2026
- Last 24 months
- 6 permits filed
57 permits since 2000: 49 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 in progress. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 17, 2025 | In progress issued Apr 2026 | 1625 Mcallister St | revision 2025-10-27-8199. removal of wall between kitchen and dining room. removal of brick fire place add new skylight. new window and install new lvl ceiling joist per plansDetails
revision 2025-10-27-8199. removal of wall between kitchen and dining room. removal of brick fire place add new skylight. new window and install new lvl ceiling joist per plans | $20,000 |
| Oct 27, 2025 | In progress issued Oct 2025 | 1625 Mcallister St | remodel of one kitchen and 1 full bathroom. remodel powder room. new electrical, new paint and refinish floor. all work inkind and on the 2nd floor.Details
remodel of one kitchen and 1 full bathroom. remodel powder room. new electrical, new paint and refinish floor. all work inkind and on the 2nd floor. | $120,000 |
| May 17, 2024 | Completed final sign-off Aug 2024 | 969 Lombard St | one kitchen remodel in kind. non structuralDetails
one kitchen remodel in kind. non structural | $15,000 |
| Sep 8, 2022 | In progress issued Sep 2026 | 135 Hearst Av | convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater.Details
convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater. | $25,000 |
| Mar 24, 2021 | Completed final sign-off May 2021 | 2077 Jackson St | unit 14: remodel (e) kitchenDetails
unit 14: remodel (e) kitchen | $15,000 |
| Nov 13, 2020 | Completed final sign-off Jul 2021 | 2077 Jackson St | remodel existing kitchen in kind. no change for layout of walls and openings.Details
remodel existing kitchen in kind. no change for layout of walls and openings. | $15,000 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 517 08th Av | remodel bathroom in kind next to kitchen at 2nd fl. remodel bathroom in kind on 3rd fl. replace hand railing at 3rd fl balcony in kind.Details
remodel bathroom in kind next to kitchen at 2nd fl. remodel bathroom in kind on 3rd fl. replace hand railing at 3rd fl balcony in kind. | $15,000 |
| Sep 19, 2017 | Completed final sign-off May 2018 | 1580 Great Hy | unit#1 - replace kitchen cabinets counter top , upgrade elect. & move gas lineDetails
unit#1 - replace kitchen cabinets counter top , upgrade elect. & move gas line | $7,000 |
| Nov 29, 2016 | Completed final sign-off May 2017 | 150 Page St | remodel kitchen in kind. update electrical and plumbing.Details
remodel kitchen in kind. update electrical and plumbing. | $15,000 |
| Sep 22, 2016 | Completed final sign-off Jan 2017 | 100 Parker Av | remodel (e) kitchen in kind, replace cabinets, electric , plumbing & tileDetails
remodel (e) kitchen in kind, replace cabinets, electric , plumbing & tile | $7,000 |