Ortizlaw Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2014 to Apr 2026
- Last 24 months
- 6 permits filed
57 permits since 2000: 49 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 in progress. Typically 0 days from filing to permit and 117 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2025 | In progress issued Oct 2025 | 1625 Mcallister St | remodel of one kitchen and 1 full bathroom. remodel powder room. new electrical, new paint and refinish floor. all work inkind and on the 2nd floor.Details
remodel of one kitchen and 1 full bathroom. remodel powder room. new electrical, new paint and refinish floor. all work inkind and on the 2nd floor. | $120,000 |
| Dec 1, 2022 | Completed final sign-off Nov 2023 | 100 27th Av | remodel powder room in-kind at 1st floor and 2nd floor bathroom.Details
remodel powder room in-kind at 1st floor and 2nd floor bathroom. | $10,000 |
| Sep 8, 2022 | In progress issued Sep 2026 | 135 Hearst Av | convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater.Details
convert (e) 1st (garage level to new adu 620 sf) with 2 bedroom, 1 bathroom & kitchen. relocate garage door create adu street entry / access. new mini-split heat pump, new water heater. | $25,000 |
| Aug 5, 2022 | Completed final sign-off Apr 2023 | 4035 18th St | revision to permit 202206166454. remove non bearing wall at bathroom to comply with ada and to correct wall dimension at rear hallway.Details
revision to permit 202206166454. remove non bearing wall at bathroom to comply with ada and to correct wall dimension at rear hallway. | $5,000 |
| Mar 3, 2021 | Completed final sign-off Jul 2021 | 2077 Jackson St | remodel 2 bathrooms in kind. front bathroom shower and floor only. rear bathroom tub. toilet laundry hookupDetails
remodel 2 bathrooms in kind. front bathroom shower and floor only. rear bathroom tub. toilet laundry hookup | $20,000 |
| Sep 22, 2020 | Completed final sign-off Dec 2020 | 154 Duncan St | remodel existing bathroom in-kindDetails
remodel existing bathroom in-kind | $13,000 |
| Sep 10, 2019 | Completed final sign-off Nov 2019 | 250 Los Palmos Dr | remodel 2nd fl bathroom in-kind 5'x 8'Details
remodel 2nd fl bathroom in-kind 5'x 8' | $10,000 |
| Aug 28, 2019 | Completed final sign-off Dec 2019 | 517 08th Av | remodel bathroom in kind next to kitchen at 2nd fl. remodel bathroom in kind on 3rd fl. replace hand railing at 3rd fl balcony in kind.Details
remodel bathroom in kind next to kitchen at 2nd fl. remodel bathroom in kind on 3rd fl. replace hand railing at 3rd fl balcony in kind. | $15,000 |
| Mar 24, 2017 | Completed final sign-off Oct 2017 | 601 Van Ness Av | unit 726: bathroom remodel in kind. replace tub shower valve sink and toilet. repalce fan (1) gfi on switch.Details
unit 726: bathroom remodel in kind. replace tub shower valve sink and toilet. repalce fan (1) gfi on switch. | $12,000 |
| Feb 9, 2017 | Completed final sign-off Jun 2017 | 2686 44th Av | remodel area at ground floor to include family room, bathroom and closet. relocate water heater.Details
remodel area at ground floor to include family room, bathroom and closet. relocate water heater. | $42,000 |
| Nov 18, 2016 | Completed final sign-off May 2017 | 150 Page St | demo non bearing interior partition walls. remodel bathroom.Details
demo non bearing interior partition walls. remodel bathroom. | $18,000 |
| Aug 25, 2015 | Completed final sign-off Oct 2015 | 3882 23rd St | convert hallway closet into half bathroom, add washer/dryer in garage.Details
convert hallway closet into half bathroom, add washer/dryer in garage. | $10,000 |
| Jan 26, 2015 | Completed final sign-off Mar 2015 | 152 Avila St | remodel bathroom in-kind on upper level; replace tub, shower, sink, replace 1 switch, 1 plug & 1 can light; high efficacy lighting or controlled by manual on-sensor; 1 main light efficacy. compliance with maher ordinance 155-13 not required.Details
remodel bathroom in-kind on upper level; replace tub, shower, sink, replace 1 switch, 1 plug & 1 can light; high efficacy lighting or controlled by manual on-sensor; 1 main light efficacy. compliance with maher ordinance 155-13 not required. | $7,000 |
| Jun 17, 2014 | Completed final sign-off Nov 2014 | 1845 Palou Av | convert portion of (e) basement into (n) home office, install new 1/2 bathroom.Details
convert portion of (e) basement into (n) home office, install new 1/2 bathroom. | $15,000 |