Back to kitchen remodel contractors
Orford Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Nov 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 30 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 5 completed, 1 never finaled. Typically 4 days from filing to permit and 261 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 25, 2018 | Completed final sign-off Dec 2018 | 324 Texas St | remodel kitchen on 1st floor and bathroom on 2nd floor. upgrade electrical on 1st floor and sheetrock.Details
remodel kitchen on 1st floor and bathroom on 2nd floor. upgrade electrical on 1st floor and sheetrock. | $45,000 |
| May 3, 2017 | Never finaled issued May 2017, no final | 170 Westmoorland Dr | remodel (e) laundry & storage on lower level & existing kitchen on 2nd level. legalize bathroom on 1st floorDetails
remodel (e) laundry & storage on lower level & existing kitchen on 2nd level. legalize bathroom on 1st floor | $30,000 |
| Mar 17, 2016 | Completed final sign-off Apr 2017 | 78 Ney St | remodel existing kitchen & bathroom, replace cabinets & fixtures, no structural work. replace wall finishes on 2nd floor , install (n) sheetrock.Details
remodel existing kitchen & bathroom, replace cabinets & fixtures, no structural work. replace wall finishes on 2nd floor , install (n) sheetrock. | $5,000 |
| Mar 1, 2016 | Completed final sign-off Apr 2017 | 78 Ney St | legalize 2nd unit, interior remodel per ord. #43-14. bathroom & kitchen remodels.Details
legalize 2nd unit, interior remodel per ord. #43-14. bathroom & kitchen remodels. | $20,000 |
| Jun 15, 2015 | Completed final sign-off Sep 2015 | 2187 44th Av | remodel (e) kitchen with new cabinets & countertops & new appliances. replce 4 (e) windwos, no structural work to be done. no walls moved, removed, added or in-fill. all (e) layouts to remain unchanged.Details
remodel (e) kitchen with new cabinets & countertops & new appliances. replce 4 (e) windwos, no structural work to be done. no walls moved, removed, added or in-fill. all (e) layouts to remain unchanged. | $50,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2016 | 1734 22nd Av | interior remodel. add full bath and family room at 1st floor. add stair well 1st to 2nd floor. remodel kitchen and add full bath at 2nd fl. repair mech, elect, & plmbg system(seperate prmit). all work not visible from street.Details
interior remodel. add full bath and family room at 1st floor. add stair well 1st to 2nd floor. remodel kitchen and add full bath at 2nd fl. repair mech, elect, & plmbg system(seperate prmit). all work not visible from street. | $75,000 |