Back to bathroom remodel contractors
Orford Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2012 to Nov 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 30 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 16, 2019 | Completed final sign-off Jan 2020 | 4135 Moraga St | remodel 2 bathrooms on main fl and bathroom and family room in basement due to fire damage. no structural work required.Details
remodel 2 bathrooms on main fl and bathroom and family room in basement due to fire damage. no structural work required. | $50,000 |
| Feb 12, 2019 | Completed final sign-off Mar 2019 | 368 Magellan Av | bath remodel. change bath tub to shower and replace tilesDetails
bath remodel. change bath tub to shower and replace tiles | $20,000 |
| Jul 25, 2018 | Completed final sign-off Dec 2018 | 324 Texas St | remodel kitchen on 1st floor and bathroom on 2nd floor. upgrade electrical on 1st floor and sheetrock.Details
remodel kitchen on 1st floor and bathroom on 2nd floor. upgrade electrical on 1st floor and sheetrock. | $45,000 |
| Mar 23, 2018 | Expired or cancelled cancelled Jul 2018 | 154 Sproule Ln | remodel existing bathroom, new fixtures sheetrock and fileDetails
remodel existing bathroom, new fixtures sheetrock and file | $15,000 |
| Jun 15, 2017 | Completed final sign-off Oct 2017 | 170 Westmoorland Dr | revision to 201705035592, change storage rom on 1st fl to bedroom, add (e) door back into new bedroom, legalize 1/2 bath (1/2 bath approved under pa#201705035592)Details
revision to 201705035592, change storage rom on 1st fl to bedroom, add (e) door back into new bedroom, legalize 1/2 bath (1/2 bath approved under pa#201705035592) | $5,000 |
| May 3, 2017 | Never finaled issued May 2017, no final | 170 Westmoorland Dr | remodel (e) laundry & storage on lower level & existing kitchen on 2nd level. legalize bathroom on 1st floorDetails
remodel (e) laundry & storage on lower level & existing kitchen on 2nd level. legalize bathroom on 1st floor | $30,000 |
| Apr 18, 2016 | Completed final sign-off Jun 2016 | 154 Sproule Ln | remodel (e) bathroomDetails
remodel (e) bathroom | $12,000 |
| Mar 17, 2016 | Completed final sign-off Apr 2017 | 78 Ney St | remodel existing kitchen & bathroom, replace cabinets & fixtures, no structural work. replace wall finishes on 2nd floor , install (n) sheetrock.Details
remodel existing kitchen & bathroom, replace cabinets & fixtures, no structural work. replace wall finishes on 2nd floor , install (n) sheetrock. | $5,000 |
| Mar 1, 2016 | Completed final sign-off Apr 2017 | 78 Ney St | legalize 2nd unit, interior remodel per ord. #43-14. bathroom & kitchen remodels.Details
legalize 2nd unit, interior remodel per ord. #43-14. bathroom & kitchen remodels. | $20,000 |
| Feb 11, 2015 | Completed final sign-off Feb 2016 | 1734 22nd Av | interior remodel. add full bath and family room at 1st floor. add stair well 1st to 2nd floor. remodel kitchen and add full bath at 2nd fl. repair mech, elect, & plmbg system(seperate prmit). all work not visible from street.Details
interior remodel. add full bath and family room at 1st floor. add stair well 1st to 2nd floor. remodel kitchen and add full bath at 2nd fl. repair mech, elect, & plmbg system(seperate prmit). all work not visible from street. | $75,000 |
| Mar 27, 2012 | Completed final sign-off Aug 2012 | 2307 17th Av | 1st fl: relocate (e) bathroom, modify (e) family room. 2nd fl: reduce size of (e) wood deck, add skylight over main stair.Details
1st fl: relocate (e) bathroom, modify (e) family room. 2nd fl: reduce size of (e) wood deck, add skylight over main stair. | $30,000 |