Back to kitchen remodel contractors
Olmec Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Jul 2026
- Last 24 months
- 8 permits filed
84 permits since 2000: 68 completed, 7 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 20 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2026 | In progress issued Jul 2026 | 57 Carmelita St | revision 202510157468 to still lower courtyard at rear of building with stepped planters and stair to garden. expand basement rear area to wide propsed garden room, kitchen on first floor for bedroom 1Details
revision 202510157468 to still lower courtyard at rear of building with stepped planters and stair to garden. expand basement rear area to wide propsed garden room, kitchen on first floor for bedroom 1 | $60,000 |
| May 14, 2026 | Completed final sign-off Oct 2026 | 1739 40th Av | replace counters reface doors, new sink in the kitchen, replace remaining knob & tub wiring increase the number of circuts in the kitchen to number required by code. install grounded and gfci outlets where necessary. re plumb the kitchen sink. no change to kitchen layout (e) cabinets to remain.Details
replace counters reface doors, new sink in the kitchen, replace remaining knob & tub wiring increase the number of circuts in the kitchen to number required by code. install grounded and gfci outlets where necessary. re plumb the kitchen sink. no change to kitchen layout (e) cabinets to remain. | $9,000 |
| Dec 1, 2025 | In progress issued Mar 2026 | 57 Carmelita St | lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath.Details
lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath. | $545,379 |
| Oct 3, 2025 | In progress issued Oct 2025 | 1428 Shrader St | replace kitchen cabinets, counters, sink, appliances, flooring, in kind. no structural work. remove and replace remaining galvanized pipe water lines with copper. replace all remaining knob and tube wires. install new panel. all work is in unit 1428Details
replace kitchen cabinets, counters, sink, appliances, flooring, in kind. no structural work. remove and replace remaining galvanized pipe water lines with copper. replace all remaining knob and tube wires. install new panel. all work is in unit 1428 | $25,000 |
| Jan 25, 2023 | Never finaled issued Jan 2023, no final | 1209 York St | partial remodel (e) (1) kitchen: relace cabinets and counters in place. there will be no changes to the layout. replace tank water heater with tankless one.Details
partial remodel (e) (1) kitchen: relace cabinets and counters in place. there will be no changes to the layout. replace tank water heater with tankless one. | $24,000 |
| Nov 1, 2022 | Expired or cancelled expired Mar 2026 | 2850 25th St | remodel of lower unit: convert front double parlon into master bed _ bathroom + closet. adjust adjacent 2 bedroom sizes, open rear area as kitchen, dining, living space. remove rear wall windows and doors and repalce with new ones. new folding door at lower level, new french and regular door @ upperDetails
remodel of lower unit: convert front double parlon into master bed _ bathroom + closet. adjust adjacent 2 bedroom sizes, open rear area as kitchen, dining, living space. remove rear wall windows and doors and repalce with new ones. new folding door at lower level, new french and regular door @ upper | $80,000 |
| Aug 31, 2022 | Completed final sign-off May 2024 | 1607 30th Av | renovate e kitchen, removing partition, new beam and cabinets fixtures n finishes. 2 add habitable areawith bedrooms and bahrs at garage level, 3 add minisplit ht pump. front entry recess. add front csmt window.Details
renovate e kitchen, removing partition, new beam and cabinets fixtures n finishes. 2 add habitable areawith bedrooms and bahrs at garage level, 3 add minisplit ht pump. front entry recess. add front csmt window. | $120,000 |
| Jul 25, 2022 | Completed final sign-off May 2024 | 1607 30th Av | remodel kitchen and bathroom in kind. no layout or structural changes.Details
remodel kitchen and bathroom in kind. no layout or structural changes. | $30,000 |
| Jul 6, 2022 | Completed final sign-off Jul 2022 | 166 Valparaiso St | modify kitchen on 3rd floor: remove cabinets along the eastern wall of the kitchen, install two new cabinets on each side of the stove. no wall & structure alteration.Details
modify kitchen on 3rd floor: remove cabinets along the eastern wall of the kitchen, install two new cabinets on each side of the stove. no wall & structure alteration. | $1,000 |
| Jun 28, 2022 | Completed final sign-off Jul 2024 | 1267 Green St | 1st fl kitchen remodel. replace kitchen cabinet, fixtures, finishes. modify partition at kitchen & master closet. relocate laundry. replace (e) windows & doors at rear.Details
1st fl kitchen remodel. replace kitchen cabinet, fixtures, finishes. modify partition at kitchen & master closet. relocate laundry. replace (e) windows & doors at rear. | $40,000 |
| Jun 6, 2022 | Completed final sign-off Aug 2022 | 48 Caselli Av | update one kitchen and one bath in place, no structural changes replace counter and backsplash, relocate dishwasher in the kitchen, new vanity and tub in the bathDetails
update one kitchen and one bath in place, no structural changes replace counter and backsplash, relocate dishwasher in the kitchen, new vanity and tub in the bath | $15,000 |
| Mar 11, 2022 | Completed final sign-off Feb 2023 | 426 Holloway Av | replace cabinets and counters in a kitchen, in kind, no layout changes. keep (e) sink, fixtures, and (e) appliances.Details
replace cabinets and counters in a kitchen, in kind, no layout changes. keep (e) sink, fixtures, and (e) appliances. | $6,000 |
| Oct 29, 2021 | Completed final sign-off Mar 2022 | 28 Pond St | remodel kitchen in kind. new appliances in kind. no change to layout.Details
remodel kitchen in kind. new appliances in kind. no change to layout. | $30,000 |
| Jul 6, 2021 | Completed final sign-off Oct 2021 | 1839 15th St | unit 252: remodel kitchen, update bathroom in kind. no structural work, new flooring in living room and bedroom.Details
unit 252: remodel kitchen, update bathroom in kind. no structural work, new flooring in living room and bedroom. | $40,000 |
| Jul 6, 2021 | Completed final sign-off Jan 2022 | 1001 Pine St | replace kitchen cabinets and counter in-kind. update electrical panelDetails
replace kitchen cabinets and counter in-kind. update electrical panel | $25,000 |
| May 14, 2021 | Completed final sign-off Mar 2022 | 30 Pond St | limited to scope of work as below: replace tub with shower pan, new tile surround in both baths. rpelace kitchen counter. no new appliancess, no new walls and no (e) wall relocation. no new lighting.Details
limited to scope of work as below: replace tub with shower pan, new tile surround in both baths. rpelace kitchen counter. no new appliancess, no new walls and no (e) wall relocation. no new lighting. | $12,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2022 | 166 Valparaiso St | remodel 2 kitchens on floor 1& 2, remodel 3 bathrooms on floorrs 1, 2, & 3. kitchen on floor 3 remains unchanged. all remodeling in place. no structural changesDetails
remodel 2 kitchens on floor 1& 2, remodel 3 bathrooms on floorrs 1, 2, & 3. kitchen on floor 3 remains unchanged. all remodeling in place. no structural changes | $100,000 |
| Dec 15, 2020 | Completed final sign-off Mar 2022 | 57 Russell St | revision to pa 2020-0929-5421 revise kitchen layout by flipping all cabinets & fixtures to other side of roomDetails
revision to pa 2020-0929-5421 revise kitchen layout by flipping all cabinets & fixtures to other side of room | |
| Oct 19, 2020 | Completed final sign-off Jun 2021 | 1042 Pine St | remodel kitchen in-kind, open doorway to kitchen, rmeodel 1.5 bathroom in-kind. replace electrical pan, open doorway to closet.Details
remodel kitchen in-kind, open doorway to kitchen, rmeodel 1.5 bathroom in-kind. replace electrical pan, open doorway to closet. | $40,000 |
| Sep 29, 2020 | Completed final sign-off Mar 2022 | 57 Russell St | interior renovation, add/remove partitions, fixtures & finishes. kitchen cabinet, new appliances, replace rear windowsDetails
interior renovation, add/remove partitions, fixtures & finishes. kitchen cabinet, new appliances, replace rear windows | $193,000 |
| Jun 26, 2020 | Completed final sign-off Aug 2020 | 2872 Jackson St | update 135 sq ft kitchen in place: install new cabinets and fixtures, new floor, replace window (in kind not vidsible from street). update wiring & plumbing connections as needed. paint. no structural work.Details
update 135 sq ft kitchen in place: install new cabinets and fixtures, new floor, replace window (in kind not vidsible from street). update wiring & plumbing connections as needed. paint. no structural work. | $30,000 |
| Jun 12, 2020 | Completed final sign-off Sep 2020 | 3310 California St | replace knob and tube wiring in front room, bedroom and storage space on ground floor, provide grounded outlets, replace electrical panel. replace bathroom window not visible from street. repair non conforming kitchen sink plumbing in kind. repair plaster and sheetrock disturbed by electrical workDetails
replace knob and tube wiring in front room, bedroom and storage space on ground floor, provide grounded outlets, replace electrical panel. replace bathroom window not visible from street. repair non conforming kitchen sink plumbing in kind. repair plaster and sheetrock disturbed by electrical work | $10,000 |
| Jun 8, 2020 | Completed final sign-off Mar 2021 | 1263 Green St | all within the envelope of an existing full-floor condo in a three-unit building, the following scope of work: (1) remodelling existing kitchen and bathroom, (2) adding one full bath (3) relocating existing laundry, and (4) adding and infilling openings in existing walls.Details
all within the envelope of an existing full-floor condo in a three-unit building, the following scope of work: (1) remodelling existing kitchen and bathroom, (2) adding one full bath (3) relocating existing laundry, and (4) adding and infilling openings in existing walls. | $97,500 |
| Oct 22, 2019 | Completed final sign-off Jun 2020 | 1492 Dolores St | replace cabinets and counters, fixtures in the kitchen tiles and fixtuers in bathroom. update electrical wiring in necessary. all is update in place. no structural work. no change to walls.Details
replace cabinets and counters, fixtures in the kitchen tiles and fixtuers in bathroom. update electrical wiring in necessary. all is update in place. no structural work. no change to walls. | $30,000 |
| Oct 16, 2019 | Completed final sign-off Jun 2020 | 65 Cresta Vista Dr | remodel 2 bathrooms: update in place. kitchen: replace cabinets and counter and fixtures. no structural changes. replace 2 patio doors in kind. not visible from street. all remodel in kindDetails
remodel 2 bathrooms: update in place. kitchen: replace cabinets and counter and fixtures. no structural changes. replace 2 patio doors in kind. not visible from street. all remodel in kind | $60,000 |