Back to bathroom remodel contractors
Olmec Builders Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2019 to Jul 2026
- Last 24 months
- 8 permits filed
84 permits since 2000: 68 completed, 7 in progress, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 20 completed, 1 in progress, 1 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 245 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 1, 2025 | In progress issued Mar 2026 | 57 Carmelita St | lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath.Details
lower slab at ground level for new garage and additional dwelling, storage and mechanical space. install front yard garage ramp and planters. remodel main level (level 1) new kitchen and garden room. remove (e) garden room. remodel upper level (level 2) new primary bath. | $545,379 |
| Oct 17, 2025 | Completed final sign-off Apr 2026 | 426 Holloway Av | notice of violation 2024-18795 for compliance. demolish existing bathroom. new storage room at demolished bathroom. no work at 2nd fl level.Details
notice of violation 2024-18795 for compliance. demolish existing bathroom. new storage room at demolished bathroom. no work at 2nd fl level. | $2,000 |
| May 7, 2024 | Completed final sign-off Sep 2024 | 28 05th Av | work on first floor. remodel bath and adjacent powder room. move tub, vanity and toilet, infill door from hallway. replace toilet with code conforming one in powder room. replace bathroom door with pocket door.Details
work on first floor. remodel bath and adjacent powder room. move tub, vanity and toilet, infill door from hallway. replace toilet with code conforming one in powder room. replace bathroom door with pocket door. | $25,000 |
| Jun 20, 2023 | Completed final sign-off Jun 2024 | 1299 Fitzgerald Av | revision to pa# 2023-0222-2388: replace damaged floor joists, walls and roof framing located at 1299 fitzgerald ave. (e) baths on 2nd fl. replace in-kind ht = 7'min remodel (e) bathroom on ground fl.Details
revision to pa# 2023-0222-2388: replace damaged floor joists, walls and roof framing located at 1299 fitzgerald ave. (e) baths on 2nd fl. replace in-kind ht = 7'min remodel (e) bathroom on ground fl. | |
| Jun 8, 2023 | Completed final sign-off Feb 2025 | 3349 Jackson St | remodel bathroom remove (e) shower, open wall to closets and add space to bathroom or (n) bath tub, niche, replace floor and wall tiles, & vanity new lights and clg. fanDetails
remodel bathroom remove (e) shower, open wall to closets and add space to bathroom or (n) bath tub, niche, replace floor and wall tiles, & vanity new lights and clg. fan | $25,000 |
| Apr 28, 2023 | Expired or cancelled expired Mar 2026 | 2850 25th St | rev to pa #202301130182 & 202211015676, adjustment & wall locations on lvl 2 (l2)- adjusted structural drawings accordingly, exstg bldg length shortened by 4 5/8", change proposed frnech door at bedroom #2 on lvl 2 to door & window, straighten master bath wall, remove proposed window over bed (rev1)Details
rev to pa #202301130182 & 202211015676, adjustment & wall locations on lvl 2 (l2)- adjusted structural drawings accordingly, exstg bldg length shortened by 4 5/8", change proposed frnech door at bedroom #2 on lvl 2 to door & window, straighten master bath wall, remove proposed window over bed (rev1) | |
| Feb 22, 2023 | Completed final sign-off Jun 2024 | 1299 Fitzgerald Av | comply w/nov #202302261 fire damage bldg repair/rebuilt fire and water damage walls, floor and roof on units of building as needed per plans interior remodeling replace windows to aluminum clad wood windows in same opening and (e) vinyl siding to be replce w/smooth stucco. legalize (e) bathroom 2-fDetails
comply w/nov #202302261 fire damage bldg repair/rebuilt fire and water damage walls, floor and roof on units of building as needed per plans interior remodeling replace windows to aluminum clad wood windows in same opening and (e) vinyl siding to be replce w/smooth stucco. legalize (e) bathroom 2-f | $250,000 |
| Jan 20, 2023 | Completed final sign-off Apr 2023 | 15 Bradford St | remodel bathroom on ground floor (in place, no fixture moves). replace sliding closet door in bedroom with a pocket door. no wall alteration.Details
remodel bathroom on ground floor (in place, no fixture moves). replace sliding closet door in bedroom with a pocket door. no wall alteration. | $25,000 |
| Jan 13, 2023 | Expired or cancelled expired Mar 2026 | 2850 25th St | modification of permit #202211015676: additional detail for condition of foundation discovered after demolition. minor changes to bathroom on 2nd floor. move vality in bathroom, enlarge closet and move shower stall in abthroom #2Details
modification of permit #202211015676: additional detail for condition of foundation discovered after demolition. minor changes to bathroom on 2nd floor. move vality in bathroom, enlarge closet and move shower stall in abthroom #2 | $30,000 |
| Nov 1, 2022 | Expired or cancelled expired Mar 2026 | 2850 25th St | remodel of lower unit: convert front double parlon into master bed _ bathroom + closet. adjust adjacent 2 bedroom sizes, open rear area as kitchen, dining, living space. remove rear wall windows and doors and repalce with new ones. new folding door at lower level, new french and regular door @ upperDetails
remodel of lower unit: convert front double parlon into master bed _ bathroom + closet. adjust adjacent 2 bedroom sizes, open rear area as kitchen, dining, living space. remove rear wall windows and doors and repalce with new ones. new folding door at lower level, new french and regular door @ upper | $80,000 |
| Jul 25, 2022 | Completed final sign-off May 2024 | 1607 30th Av | remodel kitchen and bathroom in kind. no layout or structural changes.Details
remodel kitchen and bathroom in kind. no layout or structural changes. | $30,000 |
| Jun 29, 2022 | Completed final sign-off Sep 2023 | 3012 Steiner St | revision to permit 202012231647. resize bathroom, ladder and hatch to roof, field conditions. roof hatch for maintaince purpose only. roof to be unoccupy.Details
revision to permit 202012231647. resize bathroom, ladder and hatch to roof, field conditions. roof hatch for maintaince purpose only. roof to be unoccupy. | $2,000 |
| Jun 6, 2022 | Completed final sign-off Aug 2022 | 48 Caselli Av | update one kitchen and one bath in place, no structural changes replace counter and backsplash, relocate dishwasher in the kitchen, new vanity and tub in the bathDetails
update one kitchen and one bath in place, no structural changes replace counter and backsplash, relocate dishwasher in the kitchen, new vanity and tub in the bath | $15,000 |
| Oct 28, 2021 | Never finaled issued Oct 2021, no final | 75 Cresta Vista Dr | one bathroom remodel in kind. new light, new vent fan, new vanity, shower pan, new toilet, new shower valves. non structural.Details
one bathroom remodel in kind. new light, new vent fan, new vanity, shower pan, new toilet, new shower valves. non structural. | $15,000 |
| Jul 6, 2021 | Completed final sign-off Oct 2021 | 1839 15th St | unit 252: remodel kitchen, update bathroom in kind. no structural work, new flooring in living room and bedroom.Details
unit 252: remodel kitchen, update bathroom in kind. no structural work, new flooring in living room and bedroom. | $40,000 |
| May 14, 2021 | Completed final sign-off Mar 2022 | 30 Pond St | limited to scope of work as below: replace tub with shower pan, new tile surround in both baths. rpelace kitchen counter. no new appliancess, no new walls and no (e) wall relocation. no new lighting.Details
limited to scope of work as below: replace tub with shower pan, new tile surround in both baths. rpelace kitchen counter. no new appliancess, no new walls and no (e) wall relocation. no new lighting. | $12,000 |
| Feb 18, 2021 | Completed final sign-off Jul 2022 | 166 Valparaiso St | remodel 2 kitchens on floor 1& 2, remodel 3 bathrooms on floorrs 1, 2, & 3. kitchen on floor 3 remains unchanged. all remodeling in place. no structural changesDetails
remodel 2 kitchens on floor 1& 2, remodel 3 bathrooms on floorrs 1, 2, & 3. kitchen on floor 3 remains unchanged. all remodeling in place. no structural changes | $100,000 |
| Oct 29, 2020 | Completed final sign-off Feb 2022 | 2318 44th Av | add a bedroom, laundry closet, full bathroom and hall in garage level. replace (e) furnace.Details
add a bedroom, laundry closet, full bathroom and hall in garage level. replace (e) furnace. | $75,000 |
| Oct 19, 2020 | Completed final sign-off Jun 2021 | 1042 Pine St | remodel kitchen in-kind, open doorway to kitchen, rmeodel 1.5 bathroom in-kind. replace electrical pan, open doorway to closet.Details
remodel kitchen in-kind, open doorway to kitchen, rmeodel 1.5 bathroom in-kind. replace electrical pan, open doorway to closet. | $40,000 |
| Jun 12, 2020 | Completed final sign-off Sep 2020 | 3310 California St | replace knob and tube wiring in front room, bedroom and storage space on ground floor, provide grounded outlets, replace electrical panel. replace bathroom window not visible from street. repair non conforming kitchen sink plumbing in kind. repair plaster and sheetrock disturbed by electrical workDetails
replace knob and tube wiring in front room, bedroom and storage space on ground floor, provide grounded outlets, replace electrical panel. replace bathroom window not visible from street. repair non conforming kitchen sink plumbing in kind. repair plaster and sheetrock disturbed by electrical work | $10,000 |
| Jun 8, 2020 | Completed final sign-off Mar 2021 | 1263 Green St | all within the envelope of an existing full-floor condo in a three-unit building, the following scope of work: (1) remodelling existing kitchen and bathroom, (2) adding one full bath (3) relocating existing laundry, and (4) adding and infilling openings in existing walls.Details
all within the envelope of an existing full-floor condo in a three-unit building, the following scope of work: (1) remodelling existing kitchen and bathroom, (2) adding one full bath (3) relocating existing laundry, and (4) adding and infilling openings in existing walls. | $97,500 |
| Jan 8, 2020 | Completed final sign-off Nov 2020 | 311 Banks St | add bathroom on garage level. add/ remove non-bearing walls to expand living area. move laundry to garage.Details
add bathroom on garage level. add/ remove non-bearing walls to expand living area. move laundry to garage. | $45,000 |
| Oct 22, 2019 | Completed final sign-off Jun 2020 | 1492 Dolores St | replace cabinets and counters, fixtures in the kitchen tiles and fixtuers in bathroom. update electrical wiring in necessary. all is update in place. no structural work. no change to walls.Details
replace cabinets and counters, fixtures in the kitchen tiles and fixtuers in bathroom. update electrical wiring in necessary. all is update in place. no structural work. no change to walls. | $30,000 |
| Oct 16, 2019 | Completed final sign-off Jun 2020 | 65 Cresta Vista Dr | remodel 2 bathrooms: update in place. kitchen: replace cabinets and counter and fixtures. no structural changes. replace 2 patio doors in kind. not visible from street. all remodel in kindDetails
remodel 2 bathrooms: update in place. kitchen: replace cabinets and counter and fixtures. no structural changes. replace 2 patio doors in kind. not visible from street. all remodel in kind | $60,000 |
| Jun 26, 2019 | Completed final sign-off Jan 2022 | 310 Campbell Av | (n) rear door, (e) stair to remain. add bedroom on 1/f, (n) entry porch, move (e) garage door; renovate/update (e) 1/f bathroom. add window. seismic upgrades. street facing windows shall be marvin intefrityDetails
(n) rear door, (e) stair to remain. add bedroom on 1/f, (n) entry porch, move (e) garage door; renovate/update (e) 1/f bathroom. add window. seismic upgrades. street facing windows shall be marvin intefrity | $35,000 |