Back to kitchen remodel contractors
Oliver Mackin Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Nov 2013
- Last 24 months
- 0 permits filed
34 permits since 2000: 33 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 11 completed. Typically 0 days from filing to permit and 111 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 29, 2013 | Completed final sign-off Sep 2013 | 33 Santa Monica Wy | remodel kitchen, remove cabinets, the sheetrock from the ceiling & walls. new 7/8 sheetrock. install new cabinets countertop & appliances. install new recessed lights in dining area. install 5/8 sheetrock on the ceiling in part of basement area. install new washer & dryer in basement (no habitableDetails
remodel kitchen, remove cabinets, the sheetrock from the ceiling & walls. new 7/8 sheetrock. install new cabinets countertop & appliances. install new recessed lights in dining area. install 5/8 sheetrock on the ceiling in part of basement area. install new washer & dryer in basement (no habitable | $40,000 |
| May 21, 2013 | Completed final sign-off Sep 2013 | 2400 Webster St | remodel the kitchen. remove cabinets and remove lath and plaster from the walls and ceiling. new electrical and plmg as per code. new 5/8" rack on the walls and ceiling. new cabinets and counter top. install 10 windows in kind.Details
remodel the kitchen. remove cabinets and remove lath and plaster from the walls and ceiling. new electrical and plmg as per code. new 5/8" rack on the walls and ceiling. new cabinets and counter top. install 10 windows in kind. | $35,000 |
| Sep 11, 2012 | Completed final sign-off Dec 2012 | 3872 21st St | remodel kitchen new cabinets & appliances, new electrical & plumbing as per code new sheetrock new counter top & tile on the floor.Details
remodel kitchen new cabinets & appliances, new electrical & plumbing as per code new sheetrock new counter top & tile on the floor. | $22,000 |
| Mar 22, 2012 | Completed final sign-off Aug 2012 | 2169 Folsom St | add new 105 sq ft mezzanine into extg artist studio. provide a small kitchenette to replace extg sink and counter.Details
add new 105 sq ft mezzanine into extg artist studio. provide a small kitchenette to replace extg sink and counter. | $15,000 |
| Mar 16, 2012 | Completed final sign-off Jul 2012 | 175 Red Rock Wy | remodel kitchen and bathroom: install (n) kitchen & bath cabinets. new bathroom & fixtures & (n) tiles on wall & floor at bathroom, new sheetrock. no wall relocation. provide (n) 5/8" type x gyp. board where n sheetrock is required.Details
remodel kitchen and bathroom: install (n) kitchen & bath cabinets. new bathroom & fixtures & (n) tiles on wall & floor at bathroom, new sheetrock. no wall relocation. provide (n) 5/8" type x gyp. board where n sheetrock is required. | $25,000 |
| Nov 8, 2011 | Completed final sign-off Mar 2012 | 1026 Wawona St | remodel kitchen and 2 baths. remove and install new cabinets and appliances, new elec and plumbing. sheetrock, 6 new windows, bath fixtures. no structural. new lighting comply with cec 150 k at 2nd fDetails
remodel kitchen and 2 baths. remove and install new cabinets and appliances, new elec and plumbing. sheetrock, 6 new windows, bath fixtures. no structural. new lighting comply with cec 150 k at 2nd f | $40,000 |
| Oct 11, 2011 | Completed final sign-off May 2012 | 399 Los Palmos Dr | remodel kitchen and 2 bathrooms. new windows in new downstairs family rm, new wet bar in fam. rm. new heater and water heaterDetails
remodel kitchen and 2 bathrooms. new windows in new downstairs family rm, new wet bar in fam. rm. new heater and water heater | $110,000 |
| Aug 11, 2009 | Completed final sign-off Nov 2009 | 2465 14th Av | remodel existing kitchen and 2 bathrooms on upper level incl. removal of non structural walls. replace 6 windows at north wall, not visible from street.Details
remodel existing kitchen and 2 bathrooms on upper level incl. removal of non structural walls. replace 6 windows at north wall, not visible from street. | $40,000 |
| Jul 1, 2008 | Completed final sign-off Nov 2008 | 6 Corwin St | remodel kitchen & two bathrooms new kitchen cabinets countertop & appliances electrical & plumbing as needed. remove & replace tub sink toilet shower in bathrooms.new sheetrock new tile in bathrooms. electrical & plumbing as needed.Details
remodel kitchen & two bathrooms new kitchen cabinets countertop & appliances electrical & plumbing as needed. remove & replace tub sink toilet shower in bathrooms.new sheetrock new tile in bathrooms. electrical & plumbing as needed. | $44,000 |
| Aug 17, 2006 | Completed final sign-off Oct 2006 | 22 Coleridge St | replacing cabinets in kitchen new appliances, new sink, garbage disposal new flooring.Details
replacing cabinets in kitchen new appliances, new sink, garbage disposal new flooring. | $4,000 |
| May 20, 2002 | Completed final sign-off Jun 2003 | 632 Prentiss St | remodel kitchen & bathroom on main flr/ replace windows;put new steel beams in basement and remove pDetails
remodel kitchen & bathroom on main flr/ replace windows;put new steel beams in basement and remove p | $25,000 |