Back to bathroom remodel contractors
Oliver Mackin Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2001 to Nov 2013
- Last 24 months
- 0 permits filed
34 permits since 2000: 33 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 119 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2013 | Completed final sign-off Apr 2013 | 666 Noe St | remodel bathroom, remove bathroom fixtures & sheetrock from walls & ceiling. new electrical & plumbing, insulate exterior & ceiling, install new sheetrock, install tile on walls & floor, install new bathroom fixtures.Details
remodel bathroom, remove bathroom fixtures & sheetrock from walls & ceiling. new electrical & plumbing, insulate exterior & ceiling, install new sheetrock, install tile on walls & floor, install new bathroom fixtures. | $18,000 |
| Mar 16, 2012 | Completed final sign-off Jul 2012 | 175 Red Rock Wy | remodel kitchen and bathroom: install (n) kitchen & bath cabinets. new bathroom & fixtures & (n) tiles on wall & floor at bathroom, new sheetrock. no wall relocation. provide (n) 5/8" type x gyp. board where n sheetrock is required.Details
remodel kitchen and bathroom: install (n) kitchen & bath cabinets. new bathroom & fixtures & (n) tiles on wall & floor at bathroom, new sheetrock. no wall relocation. provide (n) 5/8" type x gyp. board where n sheetrock is required. | $25,000 |
| Feb 24, 2012 | Completed final sign-off Jul 2012 | 42 Cragmont Av | remodel bathroom. remove & replace all plumbing fixts. new electrical & plumbing. new sheetrock & tile. new bath vanity. replace 2 windows. not visible from the street. all (n) lighting must comply w/ cec 150 (k).Details
remodel bathroom. remove & replace all plumbing fixts. new electrical & plumbing. new sheetrock & tile. new bath vanity. replace 2 windows. not visible from the street. all (n) lighting must comply w/ cec 150 (k). | $25,000 |
| Nov 8, 2011 | Completed final sign-off Mar 2012 | 1026 Wawona St | remodel kitchen and 2 baths. remove and install new cabinets and appliances, new elec and plumbing. sheetrock, 6 new windows, bath fixtures. no structural. new lighting comply with cec 150 k at 2nd fDetails
remodel kitchen and 2 baths. remove and install new cabinets and appliances, new elec and plumbing. sheetrock, 6 new windows, bath fixtures. no structural. new lighting comply with cec 150 k at 2nd f | $40,000 |
| Oct 11, 2011 | Completed final sign-off May 2012 | 399 Los Palmos Dr | remodel kitchen and 2 bathrooms. new windows in new downstairs family rm, new wet bar in fam. rm. new heater and water heaterDetails
remodel kitchen and 2 bathrooms. new windows in new downstairs family rm, new wet bar in fam. rm. new heater and water heater | $110,000 |
| Jun 8, 2011 | Completed final sign-off Jul 2011 | 343 15th Av | revision to pa# 2011-0503-5247-change location of the bathroomDetails
revision to pa# 2011-0503-5247-change location of the bathroom | |
| Nov 24, 2010 | Completed final sign-off Feb 2011 | 2559 14th Av | convert existing half bath to full bath, add master bedroom, closet to lower level of existing 2 story buildingDetails
convert existing half bath to full bath, add master bedroom, closet to lower level of existing 2 story building | $20,000 |
| Aug 11, 2009 | Completed final sign-off Nov 2009 | 2465 14th Av | remodel existing kitchen and 2 bathrooms on upper level incl. removal of non structural walls. replace 6 windows at north wall, not visible from street.Details
remodel existing kitchen and 2 bathrooms on upper level incl. removal of non structural walls. replace 6 windows at north wall, not visible from street. | $40,000 |
| Jul 1, 2008 | Completed final sign-off Nov 2008 | 6 Corwin St | remodel kitchen & two bathrooms new kitchen cabinets countertop & appliances electrical & plumbing as needed. remove & replace tub sink toilet shower in bathrooms.new sheetrock new tile in bathrooms. electrical & plumbing as needed.Details
remodel kitchen & two bathrooms new kitchen cabinets countertop & appliances electrical & plumbing as needed. remove & replace tub sink toilet shower in bathrooms.new sheetrock new tile in bathrooms. electrical & plumbing as needed. | $44,000 |
| May 20, 2002 | Completed final sign-off Jun 2003 | 632 Prentiss St | remodel kitchen & bathroom on main flr/ replace windows;put new steel beams in basement and remove pDetails
remodel kitchen & bathroom on main flr/ replace windows;put new steel beams in basement and remove p | $25,000 |