Back to kitchen remodel contractors
Odysseus Builders
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Jun 2026
- Last 24 months
- 12 permits filed
87 permits since 2000: 68 completed, 4 in progress, 13 never finaled, 2 expired or cancelled.
Of the 13 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 23 completed, 1 in progress, 5 never finaled. Typically 3 days from filing to permit and 280 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 22, 2025 | In progress issued Aug 2025 | 1443 12th Av | revision 202212309489- increase in scope : addition of kitchen cabinets bedroom cabinets led core lighting, egress door from adu bedroom breakfast bar, layout of non load bearing walls. location water heaters/electrical hvac reduction in scope . no fireplace installation no stairway rebuildDetails
revision 202212309489- increase in scope : addition of kitchen cabinets bedroom cabinets led core lighting, egress door from adu bedroom breakfast bar, layout of non load bearing walls. location water heaters/electrical hvac reduction in scope . no fireplace installation no stairway rebuild | |
| Aug 21, 2025 | Completed final sign-off Jul 2026 | 109 Lowell St | comply w/ nov# 202417817: upper floor- add one full bath and relocate kitchen. ground floor-convert part of garage into one full bath and one media room w/ wetbar (235 sq ft). install new ac split unit and relocate water heater.Details
comply w/ nov# 202417817: upper floor- add one full bath and relocate kitchen. ground floor-convert part of garage into one full bath and one media room w/ wetbar (235 sq ft). install new ac split unit and relocate water heater. | $130,000 |
| Aug 17, 2023 | Never finaled issued Sep 2023, no final | 386 30th Av | revision to pa 2022-1117-6704 relocate (n) powder room near (3) stair revise kitchen peninsula & cabinetry. remove folding door on 1st fl; change 1st fl beam to 8" depth extend slap replacement to garageDetails
revision to pa 2022-1117-6704 relocate (n) powder room near (3) stair revise kitchen peninsula & cabinetry. remove folding door on 1st fl; change 1st fl beam to 8" depth extend slap replacement to garage | |
| Nov 17, 2022 | Never finaled issued May 2023, no final | 386 30th Av | convert 478 sq ft of 1st fl garage level to habitable space. remodel kitchen and relocate powder rm main level. reconfigure e stair from 1st fl to 2nd fl. remodel e master bath.relocate laundry to hall closet.Details
convert 478 sq ft of 1st fl garage level to habitable space. remodel kitchen and relocate powder rm main level. reconfigure e stair from 1st fl to 2nd fl. remodel e master bath.relocate laundry to hall closet. | $110,000 |
| Oct 7, 2022 | Completed final sign-off May 2024 | 100 Delano Av | enlarge existing den and add kitchenette.Details
enlarge existing den and add kitchenette. | $20,000 |
| Jun 28, 2022 | Completed final sign-off Dec 2023 | 1887 48th Av | revision to 202206015339. include 2nd kitchen with 2 burner stove only at ground floor; change 2nd floor kitchen layout per planDetails
revision to 202206015339. include 2nd kitchen with 2 burner stove only at ground floor; change 2nd floor kitchen layout per plan | $5,000 |
| Jun 1, 2022 | Completed final sign-off Dec 2023 | 1887 48th Av | add 1 bedroom, 1 bath at ground floor. remodel kitchen & bath at 2nd fl. same to same.Details
add 1 bedroom, 1 bath at ground floor. remodel kitchen & bath at 2nd fl. same to same. | $35,000 |
| Jan 28, 2022 | Completed final sign-off Jan 2024 | 707 42nd Av | unit #707: remodel bedroom, relocate (e) kitchen, construct (n) full bath, install 2 (n) skylights on 2/f. unit #703: remodel 1/f, relocate (e) kitchen & (e)half bath. remodel g/f, relocate (e) bath, consruct (n) bedroom. relocate (e) furnace & convert 2 (e) tanked w.h. to (n) tankless w.h. no workDetails
unit #707: remodel bedroom, relocate (e) kitchen, construct (n) full bath, install 2 (n) skylights on 2/f. unit #703: remodel 1/f, relocate (e) kitchen & (e)half bath. remodel g/f, relocate (e) bath, consruct (n) bedroom. relocate (e) furnace & convert 2 (e) tanked w.h. to (n) tankless w.h. no work | $150,000 |
| Dec 7, 2021 | Completed final sign-off May 2022 | 1670 Geneva Av | remodel kitchen and bath like for like in same locationDetails
remodel kitchen and bath like for like in same location | $5,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2024 | 126 Rae Av | 1st floor - add new bedroom and kitchenette, reconfigure bathroom layout, replace plumbing fixtures.Details
1st floor - add new bedroom and kitchenette, reconfigure bathroom layout, replace plumbing fixtures. | $36,000 |
| Sep 13, 2021 | Completed final sign-off Sep 2022 | 26 Belle Av | remodel kitchen and 3 bathrooms (like for like) in same location.Details
remodel kitchen and 3 bathrooms (like for like) in same location. | $5,000 |
| Oct 30, 2020 | Completed final sign-off Sep 2022 | 1790 34th Av | remodel kitchen & bathroom. add skylight. add/change rear window & doors. infill lightwell, change front entry, rooms downDetails
remodel kitchen & bathroom. add skylight. add/change rear window & doors. infill lightwell, change front entry, rooms down | $40,000 |
| Oct 27, 2020 | Completed final sign-off Mar 2022 | 1842 42nd Av | remodle kitchen and 2 bath at 2nd floor. same to sameDetails
remodle kitchen and 2 bath at 2nd floor. same to same | $30,000 |
| Sep 25, 2020 | Never finaled issued May 2021, no final | 2235 Ocean Av | add 1 full bath at ground floor. add half bath , remodel kitchen on 2nd floor. add 1 full bath & top floor remodel bath. add rear deck at back of house.Details
add 1 full bath at ground floor. add half bath , remodel kitchen on 2nd floor. add 1 full bath & top floor remodel bath. add rear deck at back of house. | $50,888 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 2638 39th Av | remodel one bath & kitchen like to like @ 2nd floor. rewire 2nd floor wind sub electrical panel.Details
remodel one bath & kitchen like to like @ 2nd floor. rewire 2nd floor wind sub electrical panel. | $20,000 |
| Jan 10, 2019 | Completed final sign-off Apr 2021 | 1723 24th Av | comply w/ 2018-010406 prj. unit legalization ord# 43-14. legalize (e) kitchen bedrm, bathrm. all work at grd flr.Details
comply w/ 2018-010406 prj. unit legalization ord# 43-14. legalize (e) kitchen bedrm, bathrm. all work at grd flr. | $58,000 |
| Apr 4, 2018 | Completed final sign-off Dec 2018 | 1616 16th Av | kitchen and bath remodel @ 2nd flr. like for likeDetails
kitchen and bath remodel @ 2nd flr. like for like | $10,000 |
| Dec 29, 2017 | Completed final sign-off Feb 2019 | 1563 28th Av | remodel (e) kitchen, remodel bath & add one new bath at 2nd floor. no exterior work/no structural work.Details
remodel (e) kitchen, remodel bath & add one new bath at 2nd floor. no exterior work/no structural work. | $20,000 |
| Sep 20, 2017 | Completed final sign-off Nov 2017 | 226 Leland Av | remove an (e) non-bearing wall between kitchen & dining room at 2nd & 3rd floor. install new cabinets & countertop.Details
remove an (e) non-bearing wall between kitchen & dining room at 2nd & 3rd floor. install new cabinets & countertop. | $10,000 |
| Apr 13, 2017 | Completed final sign-off Jan 2019 | 1446 38th Av | infill 2 light wells at 2nd fl, reconfigure 2nd fl layout with new kitchen, 2 new bath, relocate interior stair, add 2 bedrooms, 1 family rm, 1 media room, 2 bath at ground floor.Details
infill 2 light wells at 2nd fl, reconfigure 2nd fl layout with new kitchen, 2 new bath, relocate interior stair, add 2 bedrooms, 1 family rm, 1 media room, 2 bath at ground floor. | $80,000 |
| Jan 9, 2017 | Completed final sign-off May 2017 | 3324 Broderick St | unit #3: kitchen and baths remodel, same to same.Details
unit #3: kitchen and baths remodel, same to same. | $25,000 |
| Oct 13, 2016 | Completed final sign-off Jun 2017 | 530 20th Av | kitchen cabinet, replace same to same, no plumbing & electrical change work.Details
kitchen cabinet, replace same to same, no plumbing & electrical change work. | $2,000 |
| Sep 14, 2016 | Completed final sign-off Oct 2016 | 205 07th Av | apt 3. bath & kitchen remodel, like to likeDetails
apt 3. bath & kitchen remodel, like to like | $18,000 |
| Mar 31, 2016 | Completed final sign-off Nov 2016 | 2349 27th Av | kitchen & bathroom remodel. k: new sink, cabinets, counter, floor tile, electrical & plumbing. b: new shower, tile, sink, toilet, sfloor tile, electrical & plumbing.Details
kitchen & bathroom remodel. k: new sink, cabinets, counter, floor tile, electrical & plumbing. b: new shower, tile, sink, toilet, sfloor tile, electrical & plumbing. | $12,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 415 Amherst St | remodel kitchen and one bath. same to sameDetails
remodel kitchen and one bath. same to same | $30,000 |
| Mar 24, 2015 | Completed final sign-off May 2015 | 1855 Stockton St | kitchen cabinet replacement with new counter top, same to same location, finishes and fixtures/no walls moved/no structural, fire rated assemblies to be maintained.Details
kitchen cabinet replacement with new counter top, same to same location, finishes and fixtures/no walls moved/no structural, fire rated assemblies to be maintained. | $3,000 |
| May 23, 2014 | Completed final sign-off Sep 2014 | 246 Burrows St | kitchen remodel & relocate per plan.Details
kitchen remodel & relocate per plan. | $25,000 |
| Aug 9, 2012 | Never finaled issued Aug 2012, no final | 1679 38th Av | replace kitchen counter and cabinet. same size same location. replace bathroom, plmb fixtures same size, same location. bath at 2nd floor.Details
replace kitchen counter and cabinet. same size same location. replace bathroom, plmb fixtures same size, same location. bath at 2nd floor. | $9,000 |
| Feb 24, 2012 | Completed final sign-off Feb 2013 | 141 Granada Av | comply with nov# 201282414 & 201283094-remove illegal kitchen at 1st floor (garage), legalize 2 non conforming bedrooms, 1 storage, 1 bathroom at 1st floor (garage). remodel 2nd floor kitchenDetails
comply with nov# 201282414 & 201283094-remove illegal kitchen at 1st floor (garage), legalize 2 non conforming bedrooms, 1 storage, 1 bathroom at 1st floor (garage). remodel 2nd floor kitchen | $40,000 |