Back to bathroom remodel contractors
Odysseus Builders
- Based in
- San Francisco
- On San Francisco permits
- Sep 2011 to Jun 2026
- Last 24 months
- 12 permits filed
87 permits since 2000: 68 completed, 4 in progress, 13 never finaled, 2 expired or cancelled.
Of the 13 never-finaled permits, 5 are 3 to 5 years old, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 34 completed, 6 never finaled. Typically 5 days from filing to permit and 237 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 21, 2025 | Completed final sign-off Jul 2026 | 109 Lowell St | comply w/ nov# 202417817: upper floor- add one full bath and relocate kitchen. ground floor-convert part of garage into one full bath and one media room w/ wetbar (235 sq ft). install new ac split unit and relocate water heater.Details
comply w/ nov# 202417817: upper floor- add one full bath and relocate kitchen. ground floor-convert part of garage into one full bath and one media room w/ wetbar (235 sq ft). install new ac split unit and relocate water heater. | $130,000 |
| Aug 19, 2025 | Completed final sign-off Dec 2025 | 1050 Huron Av | 1st/f: convert part of garage into living space (290 sf) included: 1 full bath, 1 media rm. with wet bar. no change present to 2nd & 3rd fl. relocate water heater & furnaceDetails
1st/f: convert part of garage into living space (290 sf) included: 1 full bath, 1 media rm. with wet bar. no change present to 2nd & 3rd fl. relocate water heater & furnace | $80,000 |
| Apr 15, 2025 | Completed final sign-off Dec 2025 | 392 Ewing Tr | 1/f: convert storage space into a living space (692 sq.ft.) included one family room with wet bar, one bedroom, one bathroom and a den.Details
1/f: convert storage space into a living space (692 sq.ft.) included one family room with wet bar, one bedroom, one bathroom and a den. | $38,000 |
| Jan 8, 2025 | Completed final sign-off Apr 2025 | 25 Corwin St | unit #4: replace all existing angle stop at bathroom, replace vanity with new faucetDetails
unit #4: replace all existing angle stop at bathroom, replace vanity with new faucet | $4,000 |
| May 20, 2024 | Completed final sign-off Jan 2025 | 2667 39th Av | revision to pa# 202307061619: 1/f - add wet bar per plan. 2/f - bath layout per plan.Details
revision to pa# 202307061619: 1/f - add wet bar per plan. 2/f - bath layout per plan. | $2,000 |
| Jul 6, 2023 | Completed final sign-off Jan 2025 | 2667 39th Av | add 1 full bath & remodel family rm @ ground fl. remodel bath @ 2nd fl. add 240 sfDetails
add 1 full bath & remodel family rm @ ground fl. remodel bath @ 2nd fl. add 240 sf | $40,888 |
| Jun 26, 2023 | Completed final sign-off Sep 2023 | 367 Teresita Bl | one bath remodel: plumbing fixture upgrade only- same to sameDetails
one bath remodel: plumbing fixture upgrade only- same to same | $5,000 |
| Dec 1, 2022 | Completed final sign-off May 2023 | 70 Forest Side Av | one bathroom remodel in kind - non-structural. rebuild all the tiles (floor/wall) as same layout, no plumbing and electrical changes. replace of bathtub, vanity, etc.Details
one bathroom remodel in kind - non-structural. rebuild all the tiles (floor/wall) as same layout, no plumbing and electrical changes. replace of bathtub, vanity, etc. | $5,000 |
| Nov 17, 2022 | Never finaled issued May 2023, no final | 386 30th Av | convert 478 sq ft of 1st fl garage level to habitable space. remodel kitchen and relocate powder rm main level. reconfigure e stair from 1st fl to 2nd fl. remodel e master bath.relocate laundry to hall closet.Details
convert 478 sq ft of 1st fl garage level to habitable space. remodel kitchen and relocate powder rm main level. reconfigure e stair from 1st fl to 2nd fl. remodel e master bath.relocate laundry to hall closet. | $110,000 |
| Jun 1, 2022 | Completed final sign-off Dec 2023 | 1887 48th Av | add 1 bedroom, 1 bath at ground floor. remodel kitchen & bath at 2nd fl. same to same.Details
add 1 bedroom, 1 bath at ground floor. remodel kitchen & bath at 2nd fl. same to same. | $35,000 |
| Jan 28, 2022 | Completed final sign-off Jan 2024 | 707 42nd Av | unit #707: remodel bedroom, relocate (e) kitchen, construct (n) full bath, install 2 (n) skylights on 2/f. unit #703: remodel 1/f, relocate (e) kitchen & (e)half bath. remodel g/f, relocate (e) bath, consruct (n) bedroom. relocate (e) furnace & convert 2 (e) tanked w.h. to (n) tankless w.h. no workDetails
unit #707: remodel bedroom, relocate (e) kitchen, construct (n) full bath, install 2 (n) skylights on 2/f. unit #703: remodel 1/f, relocate (e) kitchen & (e)half bath. remodel g/f, relocate (e) bath, consruct (n) bedroom. relocate (e) furnace & convert 2 (e) tanked w.h. to (n) tankless w.h. no work | $150,000 |
| Dec 7, 2021 | Completed final sign-off May 2022 | 1670 Geneva Av | remodel kitchen and bath like for like in same locationDetails
remodel kitchen and bath like for like in same location | $5,000 |
| Oct 5, 2021 | Completed final sign-off Mar 2024 | 126 Rae Av | 1st floor - add new bedroom and kitchenette, reconfigure bathroom layout, replace plumbing fixtures.Details
1st floor - add new bedroom and kitchenette, reconfigure bathroom layout, replace plumbing fixtures. | $36,000 |
| Sep 13, 2021 | Completed final sign-off Sep 2022 | 26 Belle Av | remodel kitchen and 3 bathrooms (like for like) in same location.Details
remodel kitchen and 3 bathrooms (like for like) in same location. | $5,000 |
| Feb 10, 2021 | Completed final sign-off Nov 2023 | 639 26th Av | add 2 baths at 2nd floor. room down add 2 bedrooms, 2 baths, 1 media room at ground floor.Details
add 2 baths at 2nd floor. room down add 2 bedrooms, 2 baths, 1 media room at ground floor. | $40,888 |
| Feb 3, 2021 | Completed final sign-off Sep 2021 | 1243 35th Av | construct 1 full bath on ground floor. no other work perform.Details
construct 1 full bath on ground floor. no other work perform. | $15,000 |
| Jan 11, 2021 | Completed final sign-off Mar 2022 | 1842 42nd Av | interior remodel add two bedrooms one family room and two bath rooms at ground floor.Details
interior remodel add two bedrooms one family room and two bath rooms at ground floor. | $58,000 |
| Oct 30, 2020 | Completed final sign-off Sep 2022 | 1790 34th Av | remodel kitchen & bathroom. add skylight. add/change rear window & doors. infill lightwell, change front entry, rooms downDetails
remodel kitchen & bathroom. add skylight. add/change rear window & doors. infill lightwell, change front entry, rooms down | $40,000 |
| Oct 27, 2020 | Completed final sign-off Mar 2022 | 1842 42nd Av | remodle kitchen and 2 bath at 2nd floor. same to sameDetails
remodle kitchen and 2 bath at 2nd floor. same to same | $30,000 |
| Sep 25, 2020 | Never finaled issued May 2021, no final | 2235 Ocean Av | add 1 full bath at ground floor. add half bath , remodel kitchen on 2nd floor. add 1 full bath & top floor remodel bath. add rear deck at back of house.Details
add 1 full bath at ground floor. add half bath , remodel kitchen on 2nd floor. add 1 full bath & top floor remodel bath. add rear deck at back of house. | $50,888 |
| Jul 1, 2020 | Never finaled issued Jul 2020, no final | 2638 39th Av | remodel one bath & kitchen like to like @ 2nd floor. rewire 2nd floor wind sub electrical panel.Details
remodel one bath & kitchen like to like @ 2nd floor. rewire 2nd floor wind sub electrical panel. | $20,000 |
| Jul 5, 2019 | Completed final sign-off Nov 2019 | 1099 Mississippi St | install new bathroom at ground fl. sprinkler under sep permit if req'd.Details
install new bathroom at ground fl. sprinkler under sep permit if req'd. | $12,000 |
| Oct 4, 2018 | Completed final sign-off Nov 2018 | 2110 Irving St | ti create hallway to ada bathDetails
ti create hallway to ada bath | $5,000 |
| May 15, 2018 | Completed final sign-off Apr 2019 | 1616 16th Av | add one bed room, one family room & one full bath at ground fl.Details
add one bed room, one family room & one full bath at ground fl. | $40,888 |
| Apr 4, 2018 | Completed final sign-off Dec 2018 | 1616 16th Av | kitchen and bath remodel @ 2nd flr. like for likeDetails
kitchen and bath remodel @ 2nd flr. like for like | $10,000 |
| Dec 29, 2017 | Completed final sign-off Feb 2019 | 1563 28th Av | remodel (e) kitchen, remodel bath & add one new bath at 2nd floor. no exterior work/no structural work.Details
remodel (e) kitchen, remodel bath & add one new bath at 2nd floor. no exterior work/no structural work. | $20,000 |
| Dec 15, 2017 | Completed final sign-off Jan 2018 | 2662 23rd Av | bath remodel. same to same with shower pan.Details
bath remodel. same to same with shower pan. | $10,000 |
| Apr 13, 2017 | Completed final sign-off Jan 2019 | 1446 38th Av | infill 2 light wells at 2nd fl, reconfigure 2nd fl layout with new kitchen, 2 new bath, relocate interior stair, add 2 bedrooms, 1 family rm, 1 media room, 2 bath at ground floor.Details
infill 2 light wells at 2nd fl, reconfigure 2nd fl layout with new kitchen, 2 new bath, relocate interior stair, add 2 bedrooms, 1 family rm, 1 media room, 2 bath at ground floor. | $80,000 |
| Jan 25, 2017 | Completed final sign-off Jun 2017 | 2223 38th Av | rooms down interior remodel. add 1 bedroom, 1 full bath, 1 family room & 1 laundry room @ ground floor. no structural workDetails
rooms down interior remodel. add 1 bedroom, 1 full bath, 1 family room & 1 laundry room @ ground floor. no structural work | $50,000 |
| Jan 9, 2017 | Completed final sign-off May 2017 | 3324 Broderick St | unit #3: kitchen and baths remodel, same to same.Details
unit #3: kitchen and baths remodel, same to same. | $25,000 |
| Oct 7, 2016 | Never finaled issued Sep 2017, no final | 42 Jules Av | addition bedroom and bathroom at garage level, addition stairs from (e) deck to yard; enclose below (e) to create 3rd room/bathroomDetails
addition bedroom and bathroom at garage level, addition stairs from (e) deck to yard; enclose below (e) to create 3rd room/bathroom | $45,000 |
| Sep 14, 2016 | Completed final sign-off Oct 2016 | 205 07th Av | apt 3. bath & kitchen remodel, like to likeDetails
apt 3. bath & kitchen remodel, like to like | $18,000 |
| Jul 27, 2016 | Completed final sign-off Nov 2016 | 2349 27th Av | interior remodel at unit 4 - remodel bathroom, add electrical face mount fire place per planDetails
interior remodel at unit 4 - remodel bathroom, add electrical face mount fire place per plan | $30,000 |
| Mar 31, 2016 | Completed final sign-off Nov 2016 | 2349 27th Av | kitchen & bathroom remodel. k: new sink, cabinets, counter, floor tile, electrical & plumbing. b: new shower, tile, sink, toilet, sfloor tile, electrical & plumbing.Details
kitchen & bathroom remodel. k: new sink, cabinets, counter, floor tile, electrical & plumbing. b: new shower, tile, sink, toilet, sfloor tile, electrical & plumbing. | $12,000 |
| Mar 7, 2016 | Completed final sign-off Apr 2016 | 415 Amherst St | remodel kitchen and one bath. same to sameDetails
remodel kitchen and one bath. same to same | $30,000 |
| Jul 24, 2015 | Completed final sign-off Jul 2018 | 90 Lapham Wy | bathroom fixtures upgrade only. no plumbing & electrical. change (same to same location). new vanity & tile. no walls to be moved.Details
bathroom fixtures upgrade only. no plumbing & electrical. change (same to same location). new vanity & tile. no walls to be moved. | $2,000 |
| Oct 1, 2014 | Never finaled issued Oct 2014, no final | 2073 Ocean Av | add one full bath at ground floor per plan.Details
add one full bath at ground floor per plan. | $9,000 |
| Aug 9, 2012 | Never finaled issued Aug 2012, no final | 1679 38th Av | replace kitchen counter and cabinet. same size same location. replace bathroom, plmb fixtures same size, same location. bath at 2nd floor.Details
replace kitchen counter and cabinet. same size same location. replace bathroom, plmb fixtures same size, same location. bath at 2nd floor. | $9,000 |
| Apr 23, 2012 | Completed final sign-off Nov 2012 | 1679 38th Av | interior remodel only-remodel rooms & bathroom at garage floor, add 1 storage room & 2 bedrooms. relocate bathroom per plan. no structural work under the permitDetails
interior remodel only-remodel rooms & bathroom at garage floor, add 1 storage room & 2 bedrooms. relocate bathroom per plan. no structural work under the permit | $50,000 |
| Feb 24, 2012 | Completed final sign-off Feb 2013 | 141 Granada Av | comply with nov# 201282414 & 201283094-remove illegal kitchen at 1st floor (garage), legalize 2 non conforming bedrooms, 1 storage, 1 bathroom at 1st floor (garage). remodel 2nd floor kitchenDetails
comply with nov# 201282414 & 201283094-remove illegal kitchen at 1st floor (garage), legalize 2 non conforming bedrooms, 1 storage, 1 bathroom at 1st floor (garage). remodel 2nd floor kitchen | $40,000 |