Back to kitchen remodel contractors
O'sullivan & Son Construction Inc
- Based in
- San Ramon
- On San Francisco permits
- Feb 2013 to Sep 2026
- Last 24 months
- 8 permits filed
26 permits since 2000: 20 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 7 completed, 2 in progress. Typically 0 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 1998 Broadway | unit 1505: demo wall, demo kitchen coutnertops and bathroom top. replace in-kind, new faucets in kitchen & bathroom.Details
unit 1505: demo wall, demo kitchen coutnertops and bathroom top. replace in-kind, new faucets in kitchen & bathroom. | $7,000 |
| Apr 10, 2026 | In progress issued Apr 2026 | 3633 Webster St | 1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replacedDetails
1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replaced | $195,000 |
| Sep 17, 2025 | Completed final sign-off Oct 2025 | 185 Upland Dr | remove existing countertop and replace with new countertop in kitchen.Details
remove existing countertop and replace with new countertop in kitchen. | $1,500 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors toDetails
renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors to | $87,000 |
| May 17, 2023 | Completed final sign-off Jul 2023 | 738 06th Av | unit #6: remodel kitchen in-kind - replace cabinets and counter topsDetails
unit #6: remodel kitchen in-kind - replace cabinets and counter tops | $15,000 |
| Feb 17, 2023 | Completed final sign-off Mar 2023 | 3525 Sacramento St | ref physical inspection report #8489, legalize existing kitchen sink & wet bar/ sink at the commercial unit/ retail space.Details
ref physical inspection report #8489, legalize existing kitchen sink & wet bar/ sink at the commercial unit/ retail space. | $5,000 |
| Feb 17, 2023 | Completed final sign-off May 2023 | 230 Allison St | remove (e) kitchen, supply and install new kitchen upgrade electrical and chanage location of existing gas lineDetails
remove (e) kitchen, supply and install new kitchen upgrade electrical and chanage location of existing gas line | $12,000 |
| Aug 29, 2017 | Completed final sign-off Aug 2019 | 3800 Clay St | no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes.Details
no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes. | $80,000 |
| May 23, 2017 | Completed final sign-off Jan 2018 | 140 South Van Ness Av | remodel (e) kitchen: cabinets, countertop, lighting. (e) 2 bathrooms: including vanites, sinks, toilets, tile flooring lighting & shower/bath. new wood floors and carpet. no structural changes.Details
remodel (e) kitchen: cabinets, countertop, lighting. (e) 2 bathrooms: including vanites, sinks, toilets, tile flooring lighting & shower/bath. new wood floors and carpet. no structural changes. | $25,000 |