Back to bathroom remodel contractors
O'sullivan & Son Construction Inc
- Based in
- San Ramon
- On San Francisco permits
- Feb 2013 to Sep 2026
- Last 24 months
- 8 permits filed
26 permits since 2000: 20 completed, 5 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 7 completed, 3 in progress. Typically 14 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 28, 2026 | In progress issued Jul 2026 | 1998 Broadway | unit 1505: demo wall, demo kitchen coutnertops and bathroom top. replace in-kind, new faucets in kitchen & bathroom.Details
unit 1505: demo wall, demo kitchen coutnertops and bathroom top. replace in-kind, new faucets in kitchen & bathroom. | $7,000 |
| Jun 18, 2026 | In progress issued Jul 2026 | 3633 Webster St | revision to pa# 202604109240: includes updates to windows at rear adn northern elevations, bathroom, water closets, stair guardrail, mechanical room location, rate wall adjustments, structural adjustments, condenser located on roof.Details
revision to pa# 202604109240: includes updates to windows at rear adn northern elevations, bathroom, water closets, stair guardrail, mechanical room location, rate wall adjustments, structural adjustments, condenser located on roof. | |
| Apr 10, 2026 | In progress issued Apr 2026 | 3633 Webster St | 1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replacedDetails
1st fl - int'r remodel w/stair. (n) windows in (n) openings; 2nd fl - interior remodel w/stair (n) windows in (e) openings. note 1st/2nd fl kitchen and baths under pa 202512222385. 3rd fl - remodel to kitchen & (e) 2 bathrooms; no work to front facade. all windows at rear facade to be replaced | $195,000 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors toDetails
renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors to | $87,000 |
| Sep 6, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | remove non-load bearing wall. new tub. double vanity toilet and bathroom remdodel.Details
remove non-load bearing wall. new tub. double vanity toilet and bathroom remdodel. | $30,000 |
| May 1, 2024 | Completed final sign-off Aug 2024 | 1370 Valencia St | #5: remodel bath room and make closet bigger. close up door between bathroom and closet. move bathroom entry door. new tub, vanity, and toilet.Details
#5: remodel bath room and make closet bigger. close up door between bathroom and closet. move bathroom entry door. new tub, vanity, and toilet. | $50,000 |
| May 26, 2023 | Completed final sign-off Nov 2023 | 753 Vermont St | 1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car chargerDetails
1/f: ugrade electrical in living room & bedroom 3, remove fireplace, patch floor/walls in-kind; 2/f: add new bathroom, remodel (e) bathroom; garage: install new car charger | $40,000 |
| Aug 31, 2018 | Completed final sign-off Dec 2019 | 3523 Sacramento St | to comply with nov #201875631 - replace sliding glass door w/window @ 2nd floor. replace 2 other windows - bedroom (1) bathroom (1) also @ 2nd floor.Details
to comply with nov #201875631 - replace sliding glass door w/window @ 2nd floor. replace 2 other windows - bedroom (1) bathroom (1) also @ 2nd floor. | $5,000 |
| Aug 29, 2017 | Completed final sign-off Aug 2019 | 3800 Clay St | no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes.Details
no expansion of existing building envelope. alterations to kitchen and bathrooms. structural work to accommodate layout changes. | $80,000 |
| May 23, 2017 | Completed final sign-off Jan 2018 | 140 South Van Ness Av | remodel (e) kitchen: cabinets, countertop, lighting. (e) 2 bathrooms: including vanites, sinks, toilets, tile flooring lighting & shower/bath. new wood floors and carpet. no structural changes.Details
remodel (e) kitchen: cabinets, countertop, lighting. (e) 2 bathrooms: including vanites, sinks, toilets, tile flooring lighting & shower/bath. new wood floors and carpet. no structural changes. | $25,000 |