O'shaughnessy Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Sep 2026
- Last 24 months
- 7 permits filed
70 permits since 2000: 46 completed, 8 in progress, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
10 stairs permits: 7 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 33 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 25, 2023 | Completed final sign-off Jul 2024 | 2700 43rd Av | replace/modify (e) interior stairs, add new stair to access roof via low profile roof, add new roof deck (approx 300 sq.ft.)Details
replace/modify (e) interior stairs, add new stair to access roof via low profile roof, add new roof deck (approx 300 sq.ft.) | $30,000 |
| Dec 19, 2022 | In progress issued Sep 2024 | 672 27th Av | proposed addition at back of house at 1st, 2nd, & 3rd fl levels. new deck at 2nd fl with stair down to rear yard. (e) front facade to remain with new windows as noted. proposed addition at back of house will not be visible from 27th ave.Details
proposed addition at back of house at 1st, 2nd, & 3rd fl levels. new deck at 2nd fl with stair down to rear yard. (e) front facade to remain with new windows as noted. proposed addition at back of house will not be visible from 27th ave. | $375,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 45 Deming St | remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level.Details
remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level. | $150,000 |
| May 1, 2017 | Completed final sign-off Feb 2018 | 628 Missouri St | revision to pa #201503050076 (renewal pa #201705015296) - relocate internal staircase.Details
revision to pa #201503050076 (renewal pa #201705015296) - relocate internal staircase. | |
| Apr 11, 2016 | Completed final sign-off May 2017 | 3972 Sacramento St | configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457Details
configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457 | |
| Oct 22, 2015 | Never finaled issued Jan 2017, no final | 2725 Filbert St | renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator.Details
renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator. | $350,000 |
| Jun 22, 2015 | Completed final sign-off May 2016 | 144 Danvers St | remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard.Details
remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard. | $240,000 |
| Mar 5, 2015 | Expired or cancelled expired Feb 2018 | 628 Missouri St | permanently remove(e) non-permitted @ basement & reintegrate to s.f.d. cap all unpermitted plbg, elect utilities to basement. relocate int.staircase. remodel 2nd flr & convert closet bath. remove/relocate kitchen from 2nd fl to basement. replace concrete deck to wood at grade & add patio door.Details
permanently remove(e) non-permitted @ basement & reintegrate to s.f.d. cap all unpermitted plbg, elect utilities to basement. relocate int.staircase. remodel 2nd flr & convert closet bath. remove/relocate kitchen from 2nd fl to basement. replace concrete deck to wood at grade & add patio door. | $100,000 |
| Sep 5, 2013 | Completed final sign-off Jan 2014 | 960 Lawton St | comply with complaint his nov #201040438 & ces nov #200562486. repair trim at bottom of roofs, repaint-repaint exterior, repair exterior side, stair & rear deck < 50%, provide 42" guardrail & hand rail at stairs. remove tall weeds from front & rear yards. all work in-kind.Details
comply with complaint his nov #201040438 & ces nov #200562486. repair trim at bottom of roofs, repaint-repaint exterior, repair exterior side, stair & rear deck < 50%, provide 42" guardrail & hand rail at stairs. remove tall weeds from front & rear yards. all work in-kind. | $30,000 |
| Feb 14, 2012 | Completed final sign-off Apr 2012 | 2525 34th Av | replace (e) brick to natural stone (slab) for front stairs. repair (e) stucco (500 sq ft). no structural workDetails
replace (e) brick to natural stone (slab) for front stairs. repair (e) stucco (500 sq ft). no structural work | $12,000 |