Back to bathroom remodel contractors
O'shaughnessy Construction
- Based in
- San Francisco
- On San Francisco permits
- Oct 2011 to Sep 2026
- Last 24 months
- 7 permits filed
70 permits since 2000: 46 completed, 8 in progress, 12 never finaled, 4 expired or cancelled.
Of the 12 never-finaled permits, 2 are 3 to 5 years old, 2 are 5 to 10 years old, 8 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 12 completed, 5 in progress, 1 never finaled, 2 expired or cancelled. Typically 19 days from filing to permit and 298 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 4, 2026 | In progress issued Sep 2026 | 2964 Jackson St | unit 2: remove lath and plaster, replace all knobs and tubes new electrical, remodel 1 bathroom, 1 laundry room, 1 kitchen in kind, replace harwood floors. unit 4: remove lath and plaster, remove and replace knobs and tubes with new electrical, remodel 1 bathroom and 1 kitchen in kindDetails
unit 2: remove lath and plaster, replace all knobs and tubes new electrical, remodel 1 bathroom, 1 laundry room, 1 kitchen in kind, replace harwood floors. unit 4: remove lath and plaster, remove and replace knobs and tubes with new electrical, remodel 1 bathroom and 1 kitchen in kind | $500,000 |
| Aug 25, 2026 | In progress issued Aug 2026 | 135 Saint Elmo Wy | remodel bathroom in-kind approx 50 sq ft. masterbed remodel, replace insulation and sheetrock in kind, replace knob & tubing. floor area of bedroom approx 180 sq ft. no alteration to framiing.Details
remodel bathroom in-kind approx 50 sq ft. masterbed remodel, replace insulation and sheetrock in kind, replace knob & tubing. floor area of bedroom approx 180 sq ft. no alteration to framiing. | $60,000 |
| Jul 17, 2026 | In progress issued Sep 2026 | 101 Dorantes Av | remodel bathroom in kind. foot print of room is unchanged. bathroom approx 88sf.Details
remodel bathroom in kind. foot print of room is unchanged. bathroom approx 88sf. | $30,000 |
| Mar 6, 2025 | In progress issued Mar 2025 | 201 Buchanan St | 1 remodel master bathroom in-kind. replace (e) cans in bedroom & closet. new insulation & sheetrock on ceiling in the bedroomDetails
1 remodel master bathroom in-kind. replace (e) cans in bedroom & closet. new insulation & sheetrock on ceiling in the bedroom | $58,000 |
| Dec 12, 2024 | In progress issued Jan 2025 | 1980 Vallejo St | reconfiguration of non structural walls, remodel of kitchen & bathrooms, removal and replacement of flooring in various rooms.Details
reconfiguration of non structural walls, remodel of kitchen & bathrooms, removal and replacement of flooring in various rooms. | $50,000 |
| Oct 27, 2022 | Completed final sign-off Jul 2024 | 2700 43rd Av | replace/replace fire damaged roof, roof framing, and finishes at 2nd floor. interior remodel of extg kitchen and bath. remodel/reconfigure extg bedroom, half bath and garage to create a den, primary suite, and one car garage.Details
replace/replace fire damaged roof, roof framing, and finishes at 2nd floor. interior remodel of extg kitchen and bath. remodel/reconfigure extg bedroom, half bath and garage to create a den, primary suite, and one car garage. | $110,000 |
| Oct 7, 2021 | Completed final sign-off Jan 2024 | 3970 Clay St | scope of work on 1st fl only - convert (e) storage space on 1st fl (ground floor) into habitable rooms including (n) bedroom, (n) bath, (n) wine room, (n) great room, (n) 1/2 bathroom and (n) laundry roomm. required excavation to be cu yds (822 sf x 1.5' deep)Details
scope of work on 1st fl only - convert (e) storage space on 1st fl (ground floor) into habitable rooms including (n) bedroom, (n) bath, (n) wine room, (n) great room, (n) 1/2 bathroom and (n) laundry roomm. required excavation to be cu yds (822 sf x 1.5' deep) | $190,200 |
| Jan 31, 2019 | Expired or cancelled expired Oct 2024 | 1100 Sacramento St | unit 102: remodel in-kind (e) kitchen & bathDetails
unit 102: remodel in-kind (e) kitchen & bath | $35,000 |
| May 30, 2018 | Completed final sign-off Apr 2019 | 45 Deming St | remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level.Details
remodeling to existing residence for kitchen & dining room on main level, reconfig of stairs to access mid level, reconfig existing bedroom, bathrooms and office on mid level. | $150,000 |
| Apr 6, 2017 | Completed final sign-off Dec 2019 | 419 31st Av | interior renovation, minor rear addition & lightwell infill, voluntary seismic upgrade & building systems. new rear deck, (1) bathroom & (1) bedroom.Details
interior renovation, minor rear addition & lightwell infill, voluntary seismic upgrade & building systems. new rear deck, (1) bathroom & (1) bedroom. | $350,000 |
| Apr 11, 2016 | Completed final sign-off May 2017 | 3972 Sacramento St | configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457Details
configuration of upper unit only: includes replacing (e) deck in kind, addition of new bath and laundry, replace (e) interior stairs. alteration to approved site permit 201204178457 | |
| Oct 22, 2015 | Never finaled issued Jan 2017, no final | 2725 Filbert St | renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator.Details
renovate 3rd floor & add 289 sf, add full bath at 3rd floor, add new staircase form 2nd to 3rd floor, add half bath at garage level, add residential elevator. | $350,000 |
| Jun 22, 2015 | Completed final sign-off May 2016 | 144 Danvers St | remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard.Details
remodel 1/f to include new office, media room, bathroom wine room & laundry room. new interior stair connect 1/f & 2/f. remodel 2/f to include kitchen, hall bathroom, hallway & outdoor center courtyard. add new below grade stairs from 1/f to rear yard. | $240,000 |
| May 29, 2015 | Completed final sign-off Sep 2015 | 242 Avila St | remodel bath in kindDetails
remodel bath in kind | $30,000 |
| Mar 5, 2015 | Expired or cancelled expired Feb 2018 | 628 Missouri St | permanently remove(e) non-permitted @ basement & reintegrate to s.f.d. cap all unpermitted plbg, elect utilities to basement. relocate int.staircase. remodel 2nd flr & convert closet bath. remove/relocate kitchen from 2nd fl to basement. replace concrete deck to wood at grade & add patio door.Details
permanently remove(e) non-permitted @ basement & reintegrate to s.f.d. cap all unpermitted plbg, elect utilities to basement. relocate int.staircase. remodel 2nd flr & convert closet bath. remove/relocate kitchen from 2nd fl to basement. replace concrete deck to wood at grade & add patio door. | $100,000 |
| Jan 2, 2015 | Completed final sign-off May 2017 | 3974 Sacramento St | configuration of lower unit & associated structural work. remodel of kitchen, bathroom, add playroom at garage floor. new garage door.Details
configuration of lower unit & associated structural work. remodel of kitchen, bathroom, add playroom at garage floor. new garage door. | $150,000 |
| Nov 12, 2013 | Completed final sign-off May 2014 | 859 Carolina St | enclose 33.5 sq ft of extg lightwell/deck. add new master bath and remodel bath bedroom and living room, dining room, kitchen, stairwell and ground floor closets.Details
enclose 33.5 sq ft of extg lightwell/deck. add new master bath and remodel bath bedroom and living room, dining room, kitchen, stairwell and ground floor closets. | $120,000 |
| Aug 20, 2013 | Completed final sign-off Oct 2013 | 369 Arkansas St | interior kitchen and bathroom remodel. no alteration of partition wall.Details
interior kitchen and bathroom remodel. no alteration of partition wall. | $30,000 |
| Dec 14, 2011 | Completed final sign-off Feb 2012 | 7 Divisadero St | replace bath tub and tile at bathroom located at 3rd floor, no wall relocation. no electrical and no plumbing work.Details
replace bath tub and tile at bathroom located at 3rd floor, no wall relocation. no electrical and no plumbing work. | $4,000 |
| Oct 26, 2011 | Completed final sign-off Apr 2012 | 1040 De Haro St | 1st floor basement remodel-adding new storage/yoga room & bathroom. foundation work approved under pa# 2011-1011-6499Details
1st floor basement remodel-adding new storage/yoga room & bathroom. foundation work approved under pa# 2011-1011-6499 | $18,000 |