Back to kitchen remodel contractors
O'neill Construction Inc
- Based in
- San Rafael
- On San Francisco permits
- Feb 2001 to Sep 2026
- Last 24 months
- 10 permits filed
169 permits since 2000: 82 completed, 8 in progress, 32 never finaled, 47 expired or cancelled.
Of the 32 never-finaled permits, 4 are 3 to 5 years old, 4 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 5 completed, 7 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 407 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2024 | Expired or cancelled suspend Dec 2025 | 224 Seacliff Av | to comply with nov 202312587 & 202293488 remodel existing kitchen. install (n) cabinets, countertop appliances & fixtures. 5 existing bath,two powder rooms, (n) tiles on floors & walls, cabinet countertops & fixtures. install (n) hardwood floors, drywall,doors, trim package & paint.Details
to comply with nov 202312587 & 202293488 remodel existing kitchen. install (n) cabinets, countertop appliances & fixtures. 5 existing bath,two powder rooms, (n) tiles on floors & walls, cabinet countertops & fixtures. install (n) hardwood floors, drywall,doors, trim package & paint. | $158,564 |
| Apr 18, 2022 | Never finaled issued Apr 2022, no final | 160 Seacliff Av | remodel existing kitchen, (n) cabinets, countertop, appliances & fixtures. six (e) bath. (n) tile fl & wall, cabinets, countertops & fixtures. install (n) hardwood fl, drywall, doors, trim package & paint etcDetails
remodel existing kitchen, (n) cabinets, countertop, appliances & fixtures. six (e) bath. (n) tile fl & wall, cabinets, countertops & fixtures. install (n) hardwood fl, drywall, doors, trim package & paint etc | $158,750 |
| Oct 25, 2021 | Completed final sign-off Apr 2023 | 3625 Jackson St | remodel extg kitchen, new cabinets, counter tops, appliances and fixtures. remodel six extg bathrooms. new tile floor and walls, nw cabinets, countertops & fixtures. install nw hardwood floors throughout, drywall, nw doors & trim package & paint etcDetails
remodel extg kitchen, new cabinets, counter tops, appliances and fixtures. remodel six extg bathrooms. new tile floor and walls, nw cabinets, countertops & fixtures. install nw hardwood floors throughout, drywall, nw doors & trim package & paint etc | $158,500 |
| Aug 24, 2021 | Never finaled issued Aug 2021, no final | 747 Rhode Island St | remodel existing kitchen, new cabinets, countertops, appliances and fixtures. remodel existing bathroom, new tile floor and walls, new cabinets countertops and fixtures. install new hardwood floor throughout drywall, new doors and trim package and paint etc.Details
remodel existing kitchen, new cabinets, countertops, appliances and fixtures. remodel existing bathroom, new tile floor and walls, new cabinets countertops and fixtures. install new hardwood floor throughout drywall, new doors and trim package and paint etc. | $42,550 |
| Jul 23, 2019 | Completed final sign-off Sep 2020 | 2102 Leavenworth St | remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, fixtures, bathroom counter tops, tile, shower & tub, new trim, finish hw floors & paintDetails
remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, fixtures, bathroom counter tops, tile, shower & tub, new trim, finish hw floors & paint | $22,910 |
| Feb 14, 2019 | Completed final sign-off Sep 2020 | 1080 Filbert St | remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, appliances, fixtures, bathroom counter tops, shower & tub. electrical & plumbing under seperate permit.Details
remodel kitchen & (2) bathrooms, kitchen cabinets, counter tops, appliances, fixtures, bathroom counter tops, shower & tub. electrical & plumbing under seperate permit. | $24,850 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #1: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/aDetails
unit #1: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #2: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/aDetails
unit #2: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing. electrical & plumbing under sep. permit. maher n/a | $24,850 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #4: remodel kitchen and (2) bathrooms: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & no change in (e) layout. maher n/aDetails
unit #4: remodel kitchen and (2) bathrooms: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & no change in (e) layout. maher n/a | $33,550 |
| Feb 20, 2018 | Expired or cancelled expired Jun 2026 | 740 Tennessee St | unit #3: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & change in (e) layout. maher n/aDetails
unit #3: remodel kitchen and bathroom: kitchen cabinets, counter tops, appliances, fixtures. bathroom counter top, shower, tiles, fixtures. new trim package, doors, floors, closet and paint, hw stairs. no rough framing & change in (e) layout. maher n/a | $24,850 |
| Aug 4, 2017 | Completed final sign-off Jan 2018 | 1100 Sacramento St | unit 802: remodel 3 bathroom's showers,tub, tile, cabinets, counter tops, trim & paint. install new master closet and retile kitchen floor.Details
unit 802: remodel 3 bathroom's showers,tub, tile, cabinets, counter tops, trim & paint. install new master closet and retile kitchen floor. | $48,830 |
| Dec 7, 2015 | Never finaled issued Dec 2015, no final | 2900 Vallejo St | remodel existing kitchen, new cabinets, new appliances, counter tops, fixtures, upgrade trim package with new hardwood floor on 1st floor. remodel 4 bathrooms, showers, tub, tile, cabinets, counter tops, fixtures. upgrade trim package with new hardwood floor on 2nd & 3rd floor & basement. mep unerDetails
remodel existing kitchen, new cabinets, new appliances, counter tops, fixtures, upgrade trim package with new hardwood floor on 1st floor. remodel 4 bathrooms, showers, tub, tile, cabinets, counter tops, fixtures. upgrade trim package with new hardwood floor on 2nd & 3rd floor & basement. mep uner | $53,870 |
| Nov 3, 2014 | Never finaled issued Nov 2014, no final | 3460 Scott St | #3460 remodel (e) kitchen, new cabinets, counter tops, appliances, fixts, update 2 (e) bathrms, new tile, fixts etc. one on lower flr & 1st fl & closets. install 1 level elevator, new finishes, trim & paint. 3462 update (e) kitchen, cabinets, doors inside garage not visible), counter tops, applianceDetails
#3460 remodel (e) kitchen, new cabinets, counter tops, appliances, fixts, update 2 (e) bathrms, new tile, fixts etc. one on lower flr & 1st fl & closets. install 1 level elevator, new finishes, trim & paint. 3462 update (e) kitchen, cabinets, doors inside garage not visible), counter tops, appliance | $24,950 |
| Oct 20, 2014 | Never finaled issued Oct 2014, no final | 3460 Baker St | upfate wine tasting room with new wine racks, stone walls aomt & finishes etc. install wine storage cubbie's & finishes; update kitchen cabinet face's, repaint walls, doors & surfaces etc, change out floor surfaces as neeeded, cosmetic repairs etc. n/a maher ordinanceDetails
upfate wine tasting room with new wine racks, stone walls aomt & finishes etc. install wine storage cubbie's & finishes; update kitchen cabinet face's, repaint walls, doors & surfaces etc, change out floor surfaces as neeeded, cosmetic repairs etc. n/a maher ordinance | $28,550 |
| Sep 11, 2013 | Completed final sign-off Sep 2014 | 130 Seacliff Av | install new master bathroom, fixtures, cabinets, toilet, shower, tub, tile, counter tops, update closets, trim hardwood floors, paint, etc., on 2nd fl. install new kitchen cabinets. appliances, countertops, trim, hardwood floor, paint, etc. - remodel bathroom & kitchen area.Details
install new master bathroom, fixtures, cabinets, toilet, shower, tub, tile, counter tops, update closets, trim hardwood floors, paint, etc., on 2nd fl. install new kitchen cabinets. appliances, countertops, trim, hardwood floor, paint, etc. - remodel bathroom & kitchen area. | $18,750 |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 1055 Green St | install new bathroom, fixtures, cabinets, shower , tub, tile and countertops update closets trim , paint etc on 2nd flr, install new kitchen cabinets, appliances, countertops, trims paint, and new fixtures, toilet, cabinets in power room 1st floor .Details
install new bathroom, fixtures, cabinets, shower , tub, tile and countertops update closets trim , paint etc on 2nd flr, install new kitchen cabinets, appliances, countertops, trims paint, and new fixtures, toilet, cabinets in power room 1st floor . | $18,880 |
| Mar 10, 2009 | Never finaled issued May 2009, no final | 2336 Broadway | 1st floor: partial demolition and kitchen remodel. 2nd floor :partial demolition and bath remodel. 3rd floor: partial demolition and new bath and new laundry. all work to be interior.Details
1st floor: partial demolition and kitchen remodel. 2nd floor :partial demolition and bath remodel. 3rd floor: partial demolition and new bath and new laundry. all work to be interior. | $85,000 |
| Sep 3, 2008 | Expired or cancelled expired Dec 2010 | 245 Mallorca Wy | remodel bathrooms on 1st floor & 3rd floor-3 total, plus wine cellar. one powder room on 2nd floor. new title, fixtures and cabinets. install new kitchen cabinets, appliances couter tops, trim etc. replace existing windows and doors with new as needed. new trim, paitnt & tile 1st floor throughout.Details
remodel bathrooms on 1st floor & 3rd floor-3 total, plus wine cellar. one powder room on 2nd floor. new title, fixtures and cabinets. install new kitchen cabinets, appliances couter tops, trim etc. replace existing windows and doors with new as needed. new trim, paitnt & tile 1st floor throughout. | $38,450 |
| Jun 14, 2001 | Expired or cancelled expired Dec 2001 | 630 27th Av | install new kitchen cabinets, counter tops, remodel bathrm. install trim mudding & paint 1st fl abovDetails
install new kitchen cabinets, counter tops, remodel bathrm. install trim mudding & paint 1st fl abov | $6,500 |