O'keeffe Mikumo Co
- Based in
- Brisbane
- On San Francisco permits
- Apr 2012 to Jun 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 never finaled. Typically 1 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2015 | Completed final sign-off Jan 2016 | 175 09th Av | revision under bpa# 2015-0528-7378. as-built & stair landing at basement. reconfigure toilet & bath location. add washer & dryer per plan.Details
revision under bpa# 2015-0528-7378. as-built & stair landing at basement. reconfigure toilet & bath location. add washer & dryer per plan. | |
| May 28, 2015 | Completed final sign-off Jan 2016 | 175 09th Av | as-built revision under bpa# 2015-0501-5221 per plan - provide connection stair.Details
as-built revision under bpa# 2015-0501-5221 per plan - provide connection stair. | $5,000 |
| May 12, 2014 | Never finaled issued May 2014, no final | 1717 Stockton St | to comply with complaint #200451896, 201326941, 201327851- dryrot repair at rear staircase, 50% and siding repairs.Details
to comply with complaint #200451896, 201326941, 201327851- dryrot repair at rear staircase, 50% and siding repairs. | $4,500 |
| Aug 6, 2013 | Completed final sign-off Aug 2013 | 3664 20th St | comply with violation # 201314992 exceeded scope for pa 201306250413, add plan to stairway replacement in kind.Details
comply with violation # 201314992 exceeded scope for pa 201306250413, add plan to stairway replacement in kind. | $2,000 |
| Jun 25, 2013 | Completed final sign-off Aug 2013 | 3662 20th St | replace rear stair and landing (same layout as present), dryrot repair (less than 50% being replaced)Details
replace rear stair and landing (same layout as present), dryrot repair (less than 50% being replaced) | $7,000 |