Back to bathroom remodel contractors
O'keeffe Mikumo Co
- Based in
- Brisbane
- On San Francisco permits
- Apr 2012 to Jun 2017
- Last 24 months
- 0 permits filed
15 permits since 2000: 11 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 27, 2017 | Never finaled issued Mar 2019, no final | 948 Naples St | basement add 1 unit @ ground floor per ordinance# 95-17. 2 bedrooms & 2 bathrooms. provide minimum celling height 7ft 6 inches.Details
basement add 1 unit @ ground floor per ordinance# 95-17. 2 bedrooms & 2 bathrooms. provide minimum celling height 7ft 6 inches. | $25,000 |
| May 30, 2017 | Expired or cancelled cancelled May 2019 | 216 Ramsell St | adu per ordinance# 162-16. 1 bedroom & 1 bath. this unit is adu only. legalization under pa# 2016/09/14/7667.Details
adu per ordinance# 162-16. 1 bedroom & 1 bath. this unit is adu only. legalization under pa# 2016/09/14/7667. | $20,000 |
| May 25, 2016 | Completed final sign-off Jul 2016 | 4333 Cabrillo St | remodeling kitchen and bathroom.Details
remodeling kitchen and bathroom. | $20,000 |
| Jun 30, 2015 | Completed final sign-off Jan 2016 | 175 09th Av | revision under bpa# 2015-0528-7378. as-built & stair landing at basement. reconfigure toilet & bath location. add washer & dryer per plan.Details
revision under bpa# 2015-0528-7378. as-built & stair landing at basement. reconfigure toilet & bath location. add washer & dryer per plan. | |
| May 1, 2015 | Completed final sign-off Jan 2016 | 175 09th Av | add rooms at g/f : partitions, electrical lighting, bathroom, kitchennett at the basement.Details
add rooms at g/f : partitions, electrical lighting, bathroom, kitchennett at the basement. | $35,000 |
| Jun 20, 2012 | Completed final sign-off Jun 2013 | 1954 Powell St | front bldg. - bathroom remodeling with sub panel to 1/f, dryrot repair around floor.Details
front bldg. - bathroom remodeling with sub panel to 1/f, dryrot repair around floor. | $6,000 |