Nuco Dba Premier Construction Services
- Based in
- Concord
- On San Francisco permits
- Jul 2011 to Jan 2017
- Last 24 months
- 0 permits filed
48 permits since 2000: 34 completed, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 67 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 25, 2013 | Completed final sign-off Jan 2014 | 138 Athens St | siding replacement, painting, drywall repairs, insulation, repair to interior stairs, trim work, metal lathe and stucco repairs. repalce portion of downspoutDetails
siding replacement, painting, drywall repairs, insulation, repair to interior stairs, trim work, metal lathe and stucco repairs. repalce portion of downspout | $32,464 |