Nuco Dba Premier Construction Services
- Based in
- Concord
- On San Francisco permits
- Jul 2011 to Jan 2017
- Last 24 months
- 0 permits filed
48 permits since 2000: 34 completed, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 never finaled. Typically 0 days from filing to permit and 160 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 120 Landers St | unit a: partial remodel of bathroom: remove shower pan, replace shower pan, surround rough-in valve, no change in wall layout & openings.Details
unit a: partial remodel of bathroom: remove shower pan, replace shower pan, surround rough-in valve, no change in wall layout & openings. | $11,000 |
| May 15, 2015 | Completed final sign-off Dec 2015 | 2671 15th Av | city attorney office build back due to flood (100 sf stucco) elec re-wire garage & laundry & bed/bath to pre flood conditions,replumb bath,laundry & main supply to pre flood conditions,re-set furnace, water heater sheetrock,paint & flooring in 1 st flr, tile shower pan.Details
city attorney office build back due to flood (100 sf stucco) elec re-wire garage & laundry & bed/bath to pre flood conditions,replumb bath,laundry & main supply to pre flood conditions,re-set furnace, water heater sheetrock,paint & flooring in 1 st flr, tile shower pan. | $40,000 |
| Apr 2, 2014 | Completed final sign-off Jul 2014 | 1666 Union St | tile shower/flooring/drywall replacement in bathroom & kitchen only. no changes to door or windows under this permit. work to be done in unit #1666Details
tile shower/flooring/drywall replacement in bathroom & kitchen only. no changes to door or windows under this permit. work to be done in unit #1666 | $8,000 |