Back to kitchen remodel contractors
Norwood Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Aug 2026
- Last 24 months
- 23 permits filed
99 permits since 2000: 70 completed, 19 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
35 kitchen remodel permits: 23 completed, 10 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 3, 2026 | In progress issued Aug 2026 | 3529 19th St | revision to 202607215335, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting postsDetails
revision to 202607215335, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting posts | $10,000 |
| Aug 3, 2026 | In progress issued Aug 2026 | 3531 19th St | revision to 202607215325, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting postsDetails
revision to 202607215325, expand the (e) wall opening between the kitchen & living room. install new header cover opening & suporting posts | $10,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3529 19th St | demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock at kitchen only, replace 5 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for likeDetails
demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock at kitchen only, replace 5 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for like | $120,000 |
| Jul 21, 2026 | In progress issued Jul 2026 | 3531 19th St | demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock @ kitchen only, replace 1 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for likeDetails
demo existing kitchen and remodel, new cabinets, new plumbing and electrical, tiles, replace plaster drywall with 5/8" type x sheetrock @ kitchen only, replace 1 windows, u=0.27 max, back of home, non street facing. same size and location. all work like for like | $120,000 |
| May 4, 2026 | In progress issued May 2026 | 1328 Greenwich St | replace cabnetry doors in kitchen, new countertop, new electrical in kitchen and living room, & new drywall and painting.Details
replace cabnetry doors in kitchen, new countertop, new electrical in kitchen and living room, & new drywall and painting. | $20,000 |
| Apr 1, 2026 | In progress issued Jun 2026 | 535 Oak Park Dr | (n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.Details
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain. | $140,000 |
| Jan 26, 2026 | In progress issued Mar 2026 | 306 Arlington St | 2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114.Details
2/f: remove (2) kitchen structral beams and reinforce (e) ceiling framing. reconfigure kitchen plumbing fixtures. infill rear swing door and replace rear sliding window with french door to access rear deck/yard. ref bpa 202512051114. | $36,000 |
| Jan 5, 2026 | In progress issued Jan 2026 | 58 San Benito Wy | revision to pa# 202504043761: adding new 3/4" plywood sub-floor to kitchen and new 2 x 10 joists to kitchen ceiling - in kind replacement.Details
revision to pa# 202504043761: adding new 3/4" plywood sub-floor to kitchen and new 2 x 10 joists to kitchen ceiling - in kind replacement. | $1,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 306 Arlington St | remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets.Details
remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets. | $100,000 |
| Apr 4, 2025 | Completed final sign-off Sep 2026 | 58 San Benito Wy | renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage.Details
renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage. | $155,000 |
| Nov 13, 2024 | In progress issued May 2025 | 1735 47th Av | new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen.Details
new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen. | $600,000 |
| Jul 22, 2024 | Completed final sign-off Aug 2025 | 2218 15th St | kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kindDetails
kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kind | $100,000 |
| Jun 25, 2024 | Completed final sign-off Jul 2025 | 1746 48th Av | on 1st floor: convert closet to tv room, add closets to primary bedroom, enclose laundry. on 2nd floor: kitchen and dining room remodel. remove unpermitted convienience stair and low roof deck per eg-03Details
on 1st floor: convert closet to tv room, add closets to primary bedroom, enclose laundry. on 2nd floor: kitchen and dining room remodel. remove unpermitted convienience stair and low roof deck per eg-03 | $55,000 |
| May 2, 2024 | Completed final sign-off Aug 2024 | 201 Laguna St | replace kitchen cabinetry, add new kitchen lighting, new waterline for fridge. drywall, painting, countertop.Details
replace kitchen cabinetry, add new kitchen lighting, new waterline for fridge. drywall, painting, countertop. | $20,000 |
| Jan 24, 2024 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen-Details
revision to pa# 202110049737, exterior: replace front facade (e) windows in-kind in existing frame. demo (e) shack & stairs between decks, (n) bigger doors to deck @ rear of house. interior: add sink in laundry, move family room wall @ south side 3'-4" from property line. minor revisions to kitchen- | $65,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5916 California St | kitchen and 1 bathroom remodel. no structural work.Details
kitchen and 1 bathroom remodel. no structural work. | $80,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5914 California St | kitchen and one bathroom remodel. no structural work.Details
kitchen and one bathroom remodel. no structural work. | $80,000 |
| Sep 8, 2023 | Completed final sign-off Aug 2025 | 944 Rivera St | convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patioDetails
convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patio | $285,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2025 | 462 Kansas St | interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen.Details
interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen. | $75,000 |
| Apr 12, 2023 | Completed final sign-off Aug 2024 | 364 Crescent Av | addition of a roof cable at the 3rd fl. rear of bld see variance approval 2022-001532 var. new roof cable will allow an (e) storage room to be converted to a bedroom with eero window to rear yard. addition = 45sf area. 2 windows and revised exterior kitchen door at rear.Details
addition of a roof cable at the 3rd fl. rear of bld see variance approval 2022-001532 var. new roof cable will allow an (e) storage room to be converted to a bedroom with eero window to rear yard. addition = 45sf area. 2 windows and revised exterior kitchen door at rear. | $45,000 |
| Sep 23, 2022 | Completed final sign-off Feb 2023 | 95 Judah St | demo (e) kitchen cabinetry, install new cabintry and countertop. no structural work, no wall demoDetails
demo (e) kitchen cabinetry, install new cabintry and countertop. no structural work, no wall demo | $6,000 |
| Apr 5, 2022 | Completed final sign-off Aug 2022 | 25 Baywood Ct | revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled.Details
revision to pa# 202009265149. update kitchen & laundry layout. (n) door to living area at 1st fl. updated windows & doors schedule. reduce scope of voluntary structural work at 2nd fl. eliminate addition of voluntary structural elements in areas which are not remodeled. | $1,000 |
| Feb 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 Randall St | revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors.Details
revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors. | $10,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2527 14th Av | 2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @Details
2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @ | $285,100 |
| Oct 12, 2021 | Completed final sign-off Oct 2022 | 101 Randall St | remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodelDetails
remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodel | $150,000 |
| Oct 6, 2021 | Completed final sign-off Feb 2025 | 1738 48th Av | vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room.Details
vertical addtion for new kitchen, living & dining room. horizontal expansion for existing bedroom & guest room. | $450,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom.Details
horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom. | $425,000 |
| Apr 16, 2021 | Completed final sign-off Sep 2022 | 1028 Church St | remodel kitchen, 2 bath in kind, no wall alteration, no structural workDetails
remodel kitchen, 2 bath in kind, no wall alteration, no structural work | $30,000 |
| Dec 22, 2020 | Never finaled issued Dec 2020, no final | 5827 Diamond Heights Bl | kitchen remodel, new flooring throughout, new front & back doorsDetails
kitchen remodel, new flooring throughout, new front & back doors | $80,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 25 Baywood Ct | 1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall.Details
1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall. | |
| May 20, 2019 | Completed final sign-off Dec 2019 | 1177 Stanyan St | demo of existing kitchen . new electrical, plumbing and drywall. install new cabinetry and countertop. no structural work. no framing modificationDetails
demo of existing kitchen . new electrical, plumbing and drywall. install new cabinetry and countertop. no structural work. no framing modification | $80,000 |
| Jan 18, 2019 | Completed final sign-off Aug 2019 | 511 Missouri St | new rear deck off 2nd floor. add slider from kitchen to (n) deck. close window @ rear wall of utility room. add (n) shearwallsDetails
new rear deck off 2nd floor. add slider from kitchen to (n) deck. close window @ rear wall of utility room. add (n) shearwalls | $100,000 |
| Nov 13, 2018 | Completed final sign-off Aug 2019 | 511 Missouri St | kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywallDetails
kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywall | $120,000 |
| Jul 9, 2018 | Completed final sign-off Dec 2018 | 769 Dolores St | kitchen remodel. one full bath and one half bath remodelDetails
kitchen remodel. one full bath and one half bath remodel | $70,000 |
| May 12, 2016 | Completed final sign-off Jul 2016 | 1726 47th Av | remove load bearing wall between kitchen and living. replace kitchen cabinets with new.Details
remove load bearing wall between kitchen and living. replace kitchen cabinets with new. | $25,000 |