Back to bathroom remodel contractors
Norwood Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2015 to Aug 2026
- Last 24 months
- 23 permits filed
99 permits since 2000: 70 completed, 19 in progress, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 4 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
30 bathroom remodel permits: 25 completed, 4 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 319 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2026 | In progress issued Jun 2026 | 535 Oak Park Dr | (n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain.Details
(n) 9 sq ft front facade bay window. replace stucco at front and side facade w/ (n) siding. interior renovation at 2/f. kitchen, bedrooms, and bathrooms. (n) finishes on (e) ext stair structure. (n) 2/f windows and skylights. (n) lighting and mech supply ducting at 2/f. (e) gas furnace to remain. | $140,000 |
| Mar 3, 2026 | In progress issued Mar 2026 | 462 Kansas St | interior remodel of the lower unit in existing 2 unit residential building (r-3). work includes replacement of cabinets, finishes, plumbing, lighting, ventilation, new electrical subpanel, enlargement of existing mechanical room, installation of stacked washer/dryer in bathroom. no structural work.Details
interior remodel of the lower unit in existing 2 unit residential building (r-3). work includes replacement of cabinets, finishes, plumbing, lighting, ventilation, new electrical subpanel, enlargement of existing mechanical room, installation of stacked washer/dryer in bathroom. no structural work. | $20,000 |
| Dec 5, 2025 | In progress issued Dec 2025 | 306 Arlington St | remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets.Details
remodel kitchen and bathroom like for like. new electrical and plumbing and drywall for both. new cabinets. | $100,000 |
| Apr 4, 2025 | Completed final sign-off Sep 2026 | 58 San Benito Wy | renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage.Details
renovation of existing bathrooms(3) and a kitchen. no exterior works or increase in square footage. | $155,000 |
| Nov 13, 2024 | In progress issued May 2025 | 1735 47th Av | new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen.Details
new horizontal addition @ rear yard. new vertical 3rd floor addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of interior walls. new interior stairs, relocate interior bathrooms & kitchen. | $600,000 |
| Jul 22, 2024 | Completed final sign-off Aug 2025 | 2218 15th St | kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kindDetails
kitchen, primary bathroom and guest bath remodel. upgrade the electrical, plumbing, drywall, painting and refinish flooring. kitchen and bath's renovations in like kind | $100,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5916 California St | kitchen and 1 bathroom remodel. no structural work.Details
kitchen and 1 bathroom remodel. no structural work. | $80,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2025 | 5914 California St | kitchen and one bathroom remodel. no structural work.Details
kitchen and one bathroom remodel. no structural work. | $80,000 |
| Sep 26, 2023 | Completed final sign-off Dec 2023 | 201 Laguna St | demo existing bathroom. remove bathtub. install new drywall. install new tile. bath remodel.Details
demo existing bathroom. remove bathtub. install new drywall. install new tile. bath remodel. | $20,000 |
| Sep 8, 2023 | Completed final sign-off Aug 2025 | 944 Rivera St | convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patioDetails
convert (e) 1st fl garage/storage into 2 rooms down, 1 bathrm, engry and 1 car garage; 2nd fl remodel e) bathroom and add 1/2 bath; remodel kitchen and relocated w/d; 2 front windows to be replaced. tunnel entrance to be enclosed. new rear patio | $285,000 |
| Jul 5, 2023 | Completed final sign-off Dec 2023 | 487 Belvedere St | amend to pa202303304685 for additional work: remodel of 1 additional bathroom (#3). new plumbing & electrical fixtures, new sheetrock, tile. no structural work. all work in-kind. no floor layout change. no wall layout change.Details
amend to pa202303304685 for additional work: remodel of 1 additional bathroom (#3). new plumbing & electrical fixtures, new sheetrock, tile. no structural work. all work in-kind. no floor layout change. no wall layout change. | $25,000 |
| Apr 28, 2023 | Completed final sign-off Feb 2025 | 462 Kansas St | interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen.Details
interior re model 2nd fl remodel kitchen and bath, add new bath and laundry, fill in lightwell in kitchen. | $75,000 |
| Mar 30, 2023 | Completed final sign-off Dec 2023 | 487 Belvedere St | two bathroom remodel. new plumbing, electric, drywall, tile. no structral work.Details
two bathroom remodel. new plumbing, electric, drywall, tile. no structral work. | $50,000 |
| Feb 23, 2022 | Expired or cancelled cancelled Jan 2026 | 101 Randall St | revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors.Details
revision to no-plan pa# 202110120202. replace siding in 2 lightwells. replace 3 windows in lightwells. blocking up doors per plan. widen kitchen & parlot doors. widen master bathroom & master closet doors. | $10,000 |
| Dec 17, 2021 | Completed final sign-off Nov 2023 | 2527 14th Av | 2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @Details
2nd fl - remodel & expand kitchen into (e) lightwell, including (n) pl firewall from (n) foundation to above roof; remodel & expand hall bathroom into 2nd (e) lightwell & relocate washer/dryer; create (n) master en-suite bathroom; replace (e) rear window w/(n) door; refinishes floors, (n) elec @ | $285,100 |
| Nov 30, 2021 | Completed final sign-off May 2022 | 3529 19th St | remodel two bathrooms. new plumbing, electrical, drywall. replace three non-street facing windows.Details
remodel two bathrooms. new plumbing, electrical, drywall. replace three non-street facing windows. | $100,000 |
| Oct 12, 2021 | Completed final sign-off Oct 2022 | 101 Randall St | remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodelDetails
remodel of 2 baths and 1 kitchen. no walls to be removed. new dry wall, new plumbing and electrical @ area of remodel | $150,000 |
| Oct 4, 2021 | Completed final sign-off Oct 2025 | 315 Holly Park Cr | horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom.Details
horizontal rear addition. 1/f: develop habitable area. add new bathroom, laundry, guest bedroom, and family room. new interior stairs from 1st to 2nd flr. 2/f: add new powder room, remodel kitchen, new windows at rear. 3/f: remodel (e) bath, add new bath and new bedroom. | $425,000 |
| Jun 14, 2021 | Completed final sign-off Oct 2024 | 306 Arlington St | revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroomDetails
revision to pa# 2019-0814-8780; new dormer, interior alterations to (e) bathrooms and bedroom | $28,685 |
| Apr 16, 2021 | Completed final sign-off Sep 2022 | 1028 Church St | remodel kitchen, 2 bath in kind, no wall alteration, no structural workDetails
remodel kitchen, 2 bath in kind, no wall alteration, no structural work | $30,000 |
| Feb 26, 2021 | Completed final sign-off Apr 2021 | 1951 Golden Gate Av | demo existing tile and drywall. install new tile and shower valve. install new door. bathroom remodelDetails
demo existing tile and drywall. install new tile and shower valve. install new door. bathroom remodel | $18,000 |
| Jan 19, 2021 | Completed final sign-off Oct 2021 | 234 Ritch St | two bathroom remodel, new drywall, new electrical and plumbing. no change to wall & opening layout.no fire sprinkler alarm modifications.Details
two bathroom remodel, new drywall, new electrical and plumbing. no change to wall & opening layout.no fire sprinkler alarm modifications. | $60,000 |
| Sep 26, 2020 | Completed final sign-off Aug 2022 | 25 Baywood Ct | 1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall.Details
1/f habitable space: add (n) bathroom, bedroom, family room & laundry. relocate interior stairs. 2/f: remodel (e) kitchen, replace (e) rear yard retainting wall. | |
| Mar 9, 2020 | Completed final sign-off Jan 2021 | 3531 19th St | replace tile in 1 bathroom (shower wall tile and bathroom floor tile). replace shower pan.Details
replace tile in 1 bathroom (shower wall tile and bathroom floor tile). replace shower pan. | $5,000 |
| Jan 22, 2019 | Completed final sign-off Dec 2019 | 1177 Stanyan St | remodle 2 bathroom. upgrade electricl, plumbing. new drywall. nw shower fixtrues, 60sq ft and 40sq ft.Details
remodle 2 bathroom. upgrade electricl, plumbing. new drywall. nw shower fixtrues, 60sq ft and 40sq ft. | $60,000 |
| Nov 13, 2018 | Completed final sign-off Aug 2019 | 511 Missouri St | kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywallDetails
kitchen & 2 bath remodels, opening kitchen wall and inistalling heads, new plumbing, electric, floors, drywall | $120,000 |
| Jul 9, 2018 | Completed final sign-off Dec 2018 | 769 Dolores St | kitchen remodel. one full bath and one half bath remodelDetails
kitchen remodel. one full bath and one half bath remodel | $70,000 |
| Jun 9, 2016 | Completed final sign-off Sep 2016 | 64 Linda St | two bathroom remodel, new fixtures, tiles, drywall, one bath remodel in ea ch unit 2 baths totalDetails
two bathroom remodel, new fixtures, tiles, drywall, one bath remodel in ea ch unit 2 baths total | $40,000 |
| Jun 1, 2016 | Completed final sign-off Jul 2016 | 1726 47th Av | bathroom remodel, new drywall,tiles, and fixtures.Details
bathroom remodel, new drywall,tiles, and fixtures. | $12,000 |
| Sep 25, 2015 | Completed final sign-off Oct 2017 | 4096 17th St | addition of washer and dryer(electric) in extg hallway closet adjacent to bathroom.Details
addition of washer and dryer(electric) in extg hallway closet adjacent to bathroom. | $16,000 |