Back to kitchen remodel contractors
Northbay Home Construction Solutions Inc
- Based in
- Novato
- On San Francisco permits
- Jul 2019 to Aug 2026
- Last 24 months
- 15 permits filed
48 permits since 2000: 25 completed, 9 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 7 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 6 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 1519 Ofarrell St | revision 202512222412- reconfigure kitchen layoutDetails
revision 202512222412- reconfigure kitchen layout | |
| Dec 22, 2025 | In progress issued Dec 2025 | 1519 Ofarrell St | switch location of (e) dining room and (e) bedroom. remodel (e) kitchen.Details
switch location of (e) dining room and (e) bedroom. remodel (e) kitchen. | $67,500 |
| Oct 27, 2025 | Completed final sign-off Aug 2026 | 447 Noe St | in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway.Details
in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway. | $57,500 |
| Jun 20, 2025 | In progress issued Jul 2025 | 3665 Clay St | 1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath.Details
1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath. | |
| Oct 5, 2023 | Completed final sign-off Dec 2025 | 3957 26th St | (n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath.Details
(n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath. | $95,300 |
| Jun 26, 2023 | Completed final sign-off Nov 2023 | 1527 32nd Av | remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public wayDetails
remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public way | $75,000 |
| Apr 18, 2022 | Completed final sign-off Mar 2026 | 11 Mars St | remodel in kind bathroom (7x10) and kitchen (13x16) in kindDetails
remodel in kind bathroom (7x10) and kitchen (13x16) in kind | $42,732 |
| Oct 21, 2021 | Completed final sign-off Apr 2022 | 2030 Green St | update scope of work to cover nov 202182298. non structural change to closets attached drawings. kitchen cabinets now being replaced not refaced.Details
update scope of work to cover nov 202182298. non structural change to closets attached drawings. kitchen cabinets now being replaced not refaced. | $7,500 |
| Sep 3, 2021 | Completed final sign-off Mar 2022 | 2030 Green St | reface kitchen cabinets, retile bathroom, paint sand and refinish floorsDetails
reface kitchen cabinets, retile bathroom, paint sand and refinish floors | $35,000 |
| Mar 17, 2021 | Expired or cancelled expired Feb 2025 | 223 Monterey Bl | remodel 1 kitchen. remodel 2 bathrooms. hallway remodel.Details
remodel 1 kitchen. remodel 2 bathrooms. hallway remodel. | $40,000 |
| Jul 5, 2019 | Never finaled issued Jul 2019, no final | 830 41st Av | kitchen remodel: (1) replace cabinets, (2) floor and countertop backsplash tiling, associated work: new countertops, electrical work for new countertop outlets, cabinet lighting, and dishwasher/garbage disposal connections: plumbing for dishwasher, move stove gas pipe and hood vent.Details
kitchen remodel: (1) replace cabinets, (2) floor and countertop backsplash tiling, associated work: new countertops, electrical work for new countertop outlets, cabinet lighting, and dishwasher/garbage disposal connections: plumbing for dishwasher, move stove gas pipe and hood vent. | $35,000 |