Back to bathroom remodel contractors
Northbay Home Construction Solutions Inc
- Based in
- Novato
- On San Francisco permits
- Jul 2019 to Aug 2026
- Last 24 months
- 15 permits filed
48 permits since 2000: 25 completed, 9 in progress, 9 never finaled, 5 expired or cancelled.
Of the 9 never-finaled permits, 7 are 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 12 completed, 3 in progress, 3 never finaled, 3 expired or cancelled. Typically 1 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 10, 2026 | In progress issued Jul 2026 | 128 Morris St | unit 6: bathroom remodel, with new bathrub, new shower, tub valves, new toilet, vanity. remodel is like for like no conversions.Details
unit 6: bathroom remodel, with new bathrub, new shower, tub valves, new toilet, vanity. remodel is like for like no conversions. | $30,000 |
| Oct 27, 2025 | Completed final sign-off Aug 2026 | 447 Noe St | in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway.Details
in-kind remodel kitchen: new cabinets, countertops, faucet, fixtures and outlets. in-kind remodel of 2 bathrooms: new tile, vanity, toilet, update outlets and install dehumidifier fans, relocate subpanel from bedroom closet to hallway. | $57,500 |
| Jun 20, 2025 | In progress issued Jul 2025 | 3665 Clay St | 1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath.Details
1st fl/: revision permit: lightwell per approved pa#2024-0520-2480 was incorrectly measured at 6'3". verified in field at 4'-11". 2nd fl/: revised powder layout, kitchen layout, 3rd floor: revised bathroom layout. shower glass door in master bath. | |
| May 31, 2024 | In progress filed May 2024, not yet issued | 3665 Clay St | revision to 202009103826, fill in lightwell 1 at 3rd fl bath, partial lightwell infill at 2nd 3rd fl bath, reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet.Details
revision to 202009103826, fill in lightwell 1 at 3rd fl bath, partial lightwell infill at 2nd 3rd fl bath, reduce skylight, remove fireplace, reconfigure powder room plumbing, reconfigure bathroom and closet. | $30,000 |
| Feb 21, 2024 | Completed final sign-off Jun 2024 | 509 Scott St | remodel in kind (6x7) master bathroomDetails
remodel in kind (6x7) master bathroom | $27,000 |
| Oct 5, 2023 | Completed final sign-off Dec 2025 | 3957 26th St | (n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath.Details
(n) 132 sq ft deck. first fl: (n) 512 sq ft habitable space with (3) (n) bedrooms. second fl: kitchen remodel and bath. | $95,300 |
| Jun 26, 2023 | Completed final sign-off Nov 2023 | 1527 32nd Av | remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public wayDetails
remodel (2) existing baths and kitchen; add powder room; replace 11 windows. all work on 2nd floor. no change to elevations that faces public way | $75,000 |
| Dec 23, 2022 | Completed final sign-off Dec 2025 | 1068 De Haro St | renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair.Details
renovation and completion of work begun by previous owner, ref bpa#201609077011 (no-plans). new foundation at rear of building. finish electrical to comply with nov 201405531. new bedroom, bath, and interior stair. | $205,000 |
| Nov 29, 2022 | Completed final sign-off Mar 2023 | 1527 32nd Av | remodel (e) bath at first fl. reconfigure walls at rear of 1st fl. and add french doors no new fl area or change to elevation visible from public way proposedDetails
remodel (e) bath at first fl. reconfigure walls at rear of 1st fl. and add french doors no new fl area or change to elevation visible from public way proposed | $60,000 |
| Sep 19, 2022 | Expired or cancelled withdrawn Mar 2023 | 11 Mars St | revision to bpa#202204182382. convert (e) half bath to a (n) full bath -add new shower to (e) half bath remodel permit. new electrical receptacles, high efficacey lighting in garage/bathroom, gfi outlets in bathroomDetails
revision to bpa#202204182382. convert (e) half bath to a (n) full bath -add new shower to (e) half bath remodel permit. new electrical receptacles, high efficacey lighting in garage/bathroom, gfi outlets in bathroom | $4,000 |
| Aug 9, 2022 | Never finaled issued Aug 2022, no final | 4726 Anza St | remodel 7'x 6' bathroom in-kind. update plumbing in wahsroom and bath. update elec fixtures. replace bathroom and washroom window in-kindDetails
remodel 7'x 6' bathroom in-kind. update plumbing in wahsroom and bath. update elec fixtures. replace bathroom and washroom window in-kind | $31,028 |
| Jun 7, 2022 | Never finaled issued Jun 2022, no final | 2900 Pierce St | unit #6: convert bathroom to new bedroom and construct new smaller bathroom.Details
unit #6: convert bathroom to new bedroom and construct new smaller bathroom. | $25,000 |
| Apr 27, 2022 | Expired or cancelled cancelled Jun 2022 | 579 07th Av | one bathroom remodel in kind, no walls to be removed.Details
one bathroom remodel in kind, no walls to be removed. | $5,500 |
| Apr 27, 2022 | Completed final sign-off Nov 2023 | 1901 California St | 2 bathrooms remodel in kind, no walls to be removed.Details
2 bathrooms remodel in kind, no walls to be removed. | $13,725 |
| Apr 18, 2022 | Completed final sign-off Mar 2026 | 11 Mars St | remodel in kind bathroom (7x10) and kitchen (13x16) in kindDetails
remodel in kind bathroom (7x10) and kitchen (13x16) in kind | $42,732 |
| Oct 20, 2021 | Completed final sign-off Nov 2022 | 830 41st Av | remodel (e) second fl bathroom.Details
remodel (e) second fl bathroom. | $18,000 |
| Sep 3, 2021 | Completed final sign-off Mar 2022 | 2030 Green St | reface kitchen cabinets, retile bathroom, paint sand and refinish floorsDetails
reface kitchen cabinets, retile bathroom, paint sand and refinish floors | $35,000 |
| Mar 17, 2021 | Expired or cancelled expired Feb 2025 | 223 Monterey Bl | remodel 1 kitchen. remodel 2 bathrooms. hallway remodel.Details
remodel 1 kitchen. remodel 2 bathrooms. hallway remodel. | $40,000 |
| Mar 12, 2021 | Completed final sign-off Dec 2021 | 1450 Green St | #5: bathroom remodel. replacing like for ike, retile, paint.Details
#5: bathroom remodel. replacing like for ike, retile, paint. | $12,000 |
| Feb 16, 2021 | Never finaled issued Feb 2021, no final | 1033 Noe St | bathroom remodel only, no moving walls.Details
bathroom remodel only, no moving walls. | $6,000 |
| Feb 16, 2021 | Completed final sign-off Feb 2021 | 4 Valletta Ct | bathroom remodel, no moving walls.Details
bathroom remodel, no moving walls. | $5,000 |