Back to bathroom remodel contractors
Noa Construction Llc
- Based in
- Berkeley
- On San Francisco permits
- Mar 2015 to Sep 2026
- Last 24 months
- 12 permits filed
99 permits since 2000: 67 completed, 13 in progress, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 11 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 12 completed, 3 in progress, 5 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 17, 2026 | In progress issued Feb 2026 | 2516 Union St | remodle of single family home (e) upgrade and enlarge window/patio door sytem on all levels reconfigure first level new bedroom and bathroom, gym, reconfigure primary suite on thrird level. modify first fl. entry dining/kitchen layout enlarge openings. relocate (e) laundry and add new laundry in 2ndDetails
remodle of single family home (e) upgrade and enlarge window/patio door sytem on all levels reconfigure first level new bedroom and bathroom, gym, reconfigure primary suite on thrird level. modify first fl. entry dining/kitchen layout enlarge openings. relocate (e) laundry and add new laundry in 2nd | $450,000 |
| Nov 14, 2025 | Completed final sign-off Sep 2026 | 1940 Vallejo St | apt 3: kitchen & (4) bathroom. replace cabinitry, countertops, finishes, plumbing fixtures & lighting. no changes to layout. all work like for like, no structural work.Details
apt 3: kitchen & (4) bathroom. replace cabinitry, countertops, finishes, plumbing fixtures & lighting. no changes to layout. all work like for like, no structural work. | $90,000 |
| Jul 29, 2025 | In progress issued Jul 2025 | 45 Normandie Tr | revision to permit 2025-0131-9447. windows to be replaced in kind, 2 doors replaced in kind. new concrete slab, new sink in garage. change to domestic hot water (dhw) system. reconfiguration of lower stairs and upper floor bathrooms.Details
revision to permit 2025-0131-9447. windows to be replaced in kind, 2 doors replaced in kind. new concrete slab, new sink in garage. change to domestic hot water (dhw) system. reconfiguration of lower stairs and upper floor bathrooms. | $30,000 |
| Jan 31, 2025 | In progress issued Feb 2025 | 45 Normandie Tr | significant structural remodel on all stories of a sfr. creation of a new bedroom and 2 new bathrooms. new electrical and lighting throughout. removal and replacement of windows and add 10 (n) skylights (not visible from street). minor foundation work and minor framing work on all floors inc. roof.Details
significant structural remodel on all stories of a sfr. creation of a new bedroom and 2 new bathrooms. new electrical and lighting throughout. removal and replacement of windows and add 10 (n) skylights (not visible from street). minor foundation work and minor framing work on all floors inc. roof. | $200,000 |
| Nov 14, 2024 | Completed final sign-off May 2025 | 999 Green St | 1 kitchen and 2 bathrooms remodel. in kind. new cabinets, new countertops, appliances, plumbing and lights fixturesDetails
1 kitchen and 2 bathrooms remodel. in kind. new cabinets, new countertops, appliances, plumbing and lights fixtures | $15,000 |
| Oct 12, 2023 | Completed final sign-off Mar 2024 | 2324 Vallejo St | replacement of light and plumbing fixtures at guest bathroom, sink locations. replacement of extg cabiets at family room same locations. sanding of floors throughout one unitDetails
replacement of light and plumbing fixtures at guest bathroom, sink locations. replacement of extg cabiets at family room same locations. sanding of floors throughout one unit | $100,000 |
| Jun 20, 2023 | Never finaled issued Jun 2023, no final | 1523 Franklin St | unit 201: revision to bpa#202301170267, remodel one bathroom cosmetic changes, no structural no plumbing, coffee corner in kitchen, framing around pillar, no structural, tv cabinet between dining room/living rom, framing around pillar, no structural.Details
unit 201: revision to bpa#202301170267, remodel one bathroom cosmetic changes, no structural no plumbing, coffee corner in kitchen, framing around pillar, no structural, tv cabinet between dining room/living rom, framing around pillar, no structural. | $20,000 |
| May 17, 2023 | Expired or cancelled expired Apr 2026 | 930 Chestnut St | demolish existing bathroom to create one large media room, demolish laundry room countertop, relocate existing washer/dryer and laundry sinkDetails
demolish existing bathroom to create one large media room, demolish laundry room countertop, relocate existing washer/dryer and laundry sink | $25,000 |
| Jan 17, 2023 | Completed final sign-off Jan 2024 | 1523 Franklin St | unit 201: one bathroom remodel, one kitchen remodel, no structural work, alll work in kindDetails
unit 201: one bathroom remodel, one kitchen remodel, no structural work, alll work in kind | $20,000 |
| Jan 26, 2022 | Completed final sign-off Apr 2023 | 368 Diamond St | one kitchen & one bath remodel. no structural work.Details
one kitchen & one bath remodel. no structural work. | $25,000 |
| Jul 8, 2019 | Completed final sign-off Jan 2020 | 930 Chestnut St | remove and replace interior finishes in basement, remodel downstairs bathroom in exact location, remove and replace radiant heating system and reroute plumbing/electrical as needed for repairs, coat (e) slab with new membrane, repair perimeter drainage and water proofingDetails
remove and replace interior finishes in basement, remodel downstairs bathroom in exact location, remove and replace radiant heating system and reroute plumbing/electrical as needed for repairs, coat (e) slab with new membrane, repair perimeter drainage and water proofing | $75,000 |
| Jun 27, 2019 | Completed final sign-off Mar 2022 | 944 Chestnut St | revision to approved pa #201807124449. scope of work for this revision includes reconfigureation of the proposed first floor kitchen & great room & new gas fireplace insert in the library. reconfiguration of 3 bathrooms on the 2nd fl & a new skylight above 2nd fl.Details
revision to approved pa #201807124449. scope of work for this revision includes reconfigureation of the proposed first floor kitchen & great room & new gas fireplace insert in the library. reconfiguration of 3 bathrooms on the 2nd fl & a new skylight above 2nd fl. | |
| Jun 12, 2018 | Completed final sign-off Jul 2019 | 2535 Lyon St | revision to 201801168636. interior layout adjustments to bedroom/bathroom on the 2nd fl and the bathroom at 4th fl. exterior work to include new window at rear and replacement of (e) window with a new at side.Details
revision to 201801168636. interior layout adjustments to bedroom/bathroom on the 2nd fl and the bathroom at 4th fl. exterior work to include new window at rear and replacement of (e) window with a new at side. | |
| Mar 5, 2018 | Completed final sign-off Sep 2018 | 1612 Church St | kitchen and 1 bath remodel. replace in kind, same location. no moving of walls or doors.Details
kitchen and 1 bath remodel. replace in kind, same location. no moving of walls or doors. | $48,000 |
| Jan 3, 2018 | Never finaled issued Jan 2018, no final | 431 Webster St | kitchen and bath remodel. no walls or windows moving.Details
kitchen and bath remodel. no walls or windows moving. | $50,000 |
| Sep 12, 2017 | Completed final sign-off Nov 2018 | 460 Noe St | revision to pa #201503272091 - work includes minor changes to the int layout & int doors on each floor. add one bath @ top flr. ext cahnges to windows & doors at rear of bldg only. work does not include any work at front facade. bldg to be equiped with fully auto matic sprinkler system per nfpa 13.Details
revision to pa #201503272091 - work includes minor changes to the int layout & int doors on each floor. add one bath @ top flr. ext cahnges to windows & doors at rear of bldg only. work does not include any work at front facade. bldg to be equiped with fully auto matic sprinkler system per nfpa 13. | $12,193 |
| May 16, 2017 | Completed final sign-off Dec 2020 | 3639 20th St | interior: remove (e) bdrm on 1st flr. relocate (e) bdrm to (n) master bed & bath, lundry/storage @basement @rear.reconfig closets on 2nd flr. structural upgrades. reconfig bath & lvng rm @attic for (n)roof deck. exterior: replace (e)windows @front/side. (e) front doors to remain w/(e) glazingDetails
interior: remove (e) bdrm on 1st flr. relocate (e) bdrm to (n) master bed & bath, lundry/storage @basement @rear.reconfig closets on 2nd flr. structural upgrades. reconfig bath & lvng rm @attic for (n)roof deck. exterior: replace (e)windows @front/side. (e) front doors to remain w/(e) glazing | $150,000 |
| May 10, 2017 | Never finaled issued May 2017, no final | 363 Marina Bl | kitchen remodel. 2 bathroom remodel, master bathroom remodel. all work in-kind. no change to layout.Details
kitchen remodel. 2 bathroom remodel, master bathroom remodel. all work in-kind. no change to layout. | $65,000 |
| May 3, 2017 | Never finaled issued Jul 2017, no final | 3965 Washington St | remodel of e 3 story bldg: demo (e) elevator/related materials, select walls, doors finishes, fixtures. (n) walls, doors, windows, finishes, fixtures. (e) rear deck expansion within setback. infill lightwell. gr fl to include lounge, office, gym an full bath.Details
remodel of e 3 story bldg: demo (e) elevator/related materials, select walls, doors finishes, fixtures. (n) walls, doors, windows, finishes, fixtures. (e) rear deck expansion within setback. infill lightwell. gr fl to include lounge, office, gym an full bath. | $650,000 |
| Mar 14, 2017 | Never finaled issued Aug 2017, no final | 363 Marina Bl | interior renovation, 3rd floor bathroom remodel. voluntary strengthening, non-shared lightwell infill, 2nd floor kitchen & bath remodel. ground floor has new family room, office, bathroom, exterior window replacement. ** maher: n/a **Details
interior renovation, 3rd floor bathroom remodel. voluntary strengthening, non-shared lightwell infill, 2nd floor kitchen & bath remodel. ground floor has new family room, office, bathroom, exterior window replacement. ** maher: n/a ** | $250,000 |
| Dec 15, 2016 | Completed final sign-off Oct 2018 | 460 Noe St | kitchen and bathroom remodel - abatementDetails
kitchen and bathroom remodel - abatement | $50,000 |