Noa Construction Llc
- Based in
- Berkeley
- On San Francisco permits
- Mar 2015 to Sep 2026
- Last 24 months
- 12 permits filed
99 permits since 2000: 67 completed, 13 in progress, 13 never finaled, 6 expired or cancelled.
Of the 13 never-finaled permits, 2 are 3 to 5 years old, 11 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 82 days from filing to permit and 769 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 18, 2018 | Expired or cancelled cancelled Jan 2026 | 2370 Washington St | remove (e) rear window and replace with a new door to match witch and header height. add glass guardrail above (e) deck parapet.Details
remove (e) rear window and replace with a new door to match witch and header height. add glass guardrail above (e) deck parapet. | $20,000 |
| Feb 15, 2018 | Completed final sign-off Jun 2019 | 2010 Jackson St | scope of work includes revision to 201707313347, new hot tub at 2nd fl deck exclude windows at garage and change door type at rear of baseement level. scope does not include any work at front facadeDetails
scope of work includes revision to 201707313347, new hot tub at 2nd fl deck exclude windows at garage and change door type at rear of baseement level. scope does not include any work at front facade | |
| Sep 20, 2017 | Completed final sign-off Oct 2019 | 560 Spruce St | replace 3 front windows in kind, same size and glass division as (e). replace 2 side windows in kind -all windows al. clad wood frames. rear facing 2 side windows in-kind. rep facade sliding door, replace in kind. rear deck -repair to fix wood rot. new garage doors same size and shape.Details
replace 3 front windows in kind, same size and glass division as (e). replace 2 side windows in kind -all windows al. clad wood frames. rear facing 2 side windows in-kind. rep facade sliding door, replace in kind. rear deck -repair to fix wood rot. new garage doors same size and shape. | $100,000 |
| Jun 13, 2017 | Completed final sign-off Aug 2017 | 1400 Montgomery St | revision to 201507292771: modifications to the proposed window systemon the south side of the new deck infill and removal of the casement window on the west face of infill and to replace (e) window s in kind at 2nd flrDetails
revision to 201507292771: modifications to the proposed window systemon the south side of the new deck infill and removal of the casement window on the west face of infill and to replace (e) window s in kind at 2nd flr | |
| May 3, 2017 | Never finaled issued Jul 2017, no final | 3965 Washington St | remodel of e 3 story bldg: demo (e) elevator/related materials, select walls, doors finishes, fixtures. (n) walls, doors, windows, finishes, fixtures. (e) rear deck expansion within setback. infill lightwell. gr fl to include lounge, office, gym an full bath.Details
remodel of e 3 story bldg: demo (e) elevator/related materials, select walls, doors finishes, fixtures. (n) walls, doors, windows, finishes, fixtures. (e) rear deck expansion within setback. infill lightwell. gr fl to include lounge, office, gym an full bath. | $650,000 |
| Oct 18, 2016 | Completed final sign-off Aug 2019 | 2516 Union St | removal of (e) int. walls, windows, finishes and fixtures. new interior walls & finishes. new rear deck and balconies at all levels.new infill below (e) side pop-out at enry level. exterior work includes new doors and windows. new nfpa 13r sprinkler system under separate permit.Details
removal of (e) int. walls, windows, finishes and fixtures. new interior walls & finishes. new rear deck and balconies at all levels.new infill below (e) side pop-out at enry level. exterior work includes new doors and windows. new nfpa 13r sprinkler system under separate permit. | $520,000 |
| Nov 13, 2015 | Completed final sign-off Mar 2024 | 870 Union St | (front) demolish (e)wall, windows, doors, finishes & fixtures. lower top 2 floors of(e)structure to accomodate(n)work on roof. build(n) walls, doors, finishes & fixtures. build(e)bldg w/ addition 4th fl & decks. build rear addition @ all 3 levels. build (n)rear yard structure facing aladdin terrace.Details
(front) demolish (e)wall, windows, doors, finishes & fixtures. lower top 2 floors of(e)structure to accomodate(n)work on roof. build(n) walls, doors, finishes & fixtures. build(e)bldg w/ addition 4th fl & decks. build rear addition @ all 3 levels. build (n)rear yard structure facing aladdin terrace. | $547,000 |