Nima Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2015 to Aug 2026
- Last 24 months
- 10 permits filed
31 permits since 2000: 20 completed, 6 in progress, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 in progress. Typically 28 days from filing to permit and 312 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 30, 2025 | In progress issued Jun 2025 | 585 Connecticut St | revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.iiDetails
revision to pa 202103166680 extension of existing rear deck; extend rear deck @ level 1 an additional 3'-6". deck is less than 10'-0" above existing grade and is an allowed obstruction per sf planning code sec 136.c,25.b.ii | $5,000 |
| Dec 30, 2024 | Completed final sign-off Oct 2025 | 155 Connecticut St | prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exteriorDetails
prop h:change of occupancy from b to e. remove non structural patitions, add ext door, replace windows inkind new toilets, sinks, kitchenette, partitions, deck & ramp (outdoor) new luxury vynil throughout, paint, interior & exterior | $250,000 |
| Dec 8, 2021 | Completed final sign-off Sep 2026 | 600 Wisconsin St | renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f additionDetails
renov per plans, add 1,021 sq. ft. 3/f, unconditioned decks, office/ bedrm w/closet, bathrm, (n) stucco finish parapet/roof @ 3/f add, raise ceiling height l2, replace/reconfig ext envelope/stucco/wd siding, modification to (e) bay window to accommodate (n) 3/f addition | $500,000 |
| Sep 18, 2018 | Completed final sign-off Sep 2019 | 709 York St | revision to 201807124393 repair stair surface & replace door/windows where required demo rear deck maher naDetails
revision to 201807124393 repair stair surface & replace door/windows where required demo rear deck maher na | $50,000 |
| Jun 27, 2017 | Completed final sign-off Mar 2018 | 600 Wisconsin St | remodel (e) courtyard to include new deck,hottub, fire pit, remodel (e) family room 1st fl to include new gas fireplace. remodel (e) living room on 2/f to include (n) gas fireplace and built-in furniture. (n) deck not to exceed 30in from (e) grade at any point.Details
remodel (e) courtyard to include new deck,hottub, fire pit, remodel (e) family room 1st fl to include new gas fireplace. remodel (e) living room on 2/f to include (n) gas fireplace and built-in furniture. (n) deck not to exceed 30in from (e) grade at any point. | $30,000 |