Back to bathroom remodel contractors
Nima Construction
- Based in
- San Rafael
- On San Francisco permits
- Jun 2015 to Oct 2026
- Last 24 months
- 11 permits filed
32 permits since 2000: 20 completed, 7 in progress, 5 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
6 bathroom remodel permits: 4 completed, 1 in progress, 1 expired or cancelled. Typically 9 days from filing to permit and 175 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2026 | In progress issued Mar 2026 | 35 Moulton St | upper unit (3rd & 4th fl)- replace & repair (2) aluminum windows and (5) skylights in-kind; remodel/update (2) bathrooms & (1) kitchen in-kind; replace furnace and water heater and replace lighting in-kind; no structural work.Details
upper unit (3rd & 4th fl)- replace & repair (2) aluminum windows and (5) skylights in-kind; remodel/update (2) bathrooms & (1) kitchen in-kind; replace furnace and water heater and replace lighting in-kind; no structural work. | $492,079 |
| Nov 19, 2021 | Expired or cancelled expired Sep 2026 | 600 Wisconsin St | revision to 202103196927: replace and reconfigure 1st and 2nd fl interior to include: (n) elevator shaft (n)interior stais, replace & reconfigure kitchen and replace (e) bathrooms and laundry. no exterior workDetails
revision to 202103196927: replace and reconfigure 1st and 2nd fl interior to include: (n) elevator shaft (n)interior stais, replace & reconfigure kitchen and replace (e) bathrooms and laundry. no exterior work | $300,000 |
| Jun 22, 2018 | Completed final sign-off Sep 2018 | 104 Molimo Dr | 2nd floor bathroom remodel in kind, replace fanDetails
2nd floor bathroom remodel in kind, replace fan | $5,000 |
| Jan 12, 2018 | Completed final sign-off May 2018 | 3470 19th St | add one full bath and a closet at third floor (within (e) sf). new door at third floor (with sf)Details
add one full bath and a closet at third floor (within (e) sf). new door at third floor (with sf) | $20,000 |
| May 5, 2017 | Completed final sign-off Jan 2018 | 310 Santa Ana Av | interior renovation & finish upgrade. maintain (e) area with new wall layout for lower floor including family room, media room, office, wine room, game room & full bath. adjust walls for master bedroom, bathroom, guest bathroom to make spaces functional. enlarge connecting stair to meet codeDetails
interior renovation & finish upgrade. maintain (e) area with new wall layout for lower floor including family room, media room, office, wine room, game room & full bath. adjust walls for master bedroom, bathroom, guest bathroom to make spaces functional. enlarge connecting stair to meet code | $80,000 |
| Jun 24, 2015 | Completed final sign-off Jul 2016 | 1819 20th St | remodel (e) kitchen, (e) bathroom, and (e) living room, new skylight, and new gas burning stoveDetails
remodel (e) kitchen, (e) bathroom, and (e) living room, new skylight, and new gas burning stove | $40,000 |