Nick Valaris
- Based in
- San Francisco
- On San Francisco permits
- Jul 2013 to Apr 2022
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 3 completed, 1 never finaled. Typically 12 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2021 | Completed final sign-off Dec 2022 | 1570 Waller St | 401: remodel kitchen move location of sink and stove upgrade electrical, add lights, install new cabinet, remove wall from dining room to kitchen in-kind.Details
401: remodel kitchen move location of sink and stove upgrade electrical, add lights, install new cabinet, remove wall from dining room to kitchen in-kind. | $25,000 |
| Aug 17, 2017 | Completed final sign-off Mar 2018 | 357 Kearny St | minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain.Details
minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain. | $50,000 |
| May 15, 2017 | Never finaled issued May 2017, no final | 3332 Washington St | water damage repair, patch/re-finish floors in kitchen area, replace kitchen backsplash & countertops. first floor office install new insulation & sheetrock from flr to ceiling. replace 3 hidden valves with copper pipe to bring up to code. install extension boxes or access panel to two junction boxeDetails
water damage repair, patch/re-finish floors in kitchen area, replace kitchen backsplash & countertops. first floor office install new insulation & sheetrock from flr to ceiling. replace 3 hidden valves with copper pipe to bring up to code. install extension boxes or access panel to two junction boxe | $60,000 |
| Jul 30, 2013 | Completed final sign-off Jun 2016 | 720 York St | unit 102. change of use. change from commercial to residential condo unit. install new ship ladder and platform to comply with rescue window requirements. remove glass door at kitchen.Details
unit 102. change of use. change from commercial to residential condo unit. install new ship ladder and platform to comply with rescue window requirements. remove glass door at kitchen. | $1,500 |