Back to kitchen remodel contractors
Nicholas Spencer Firth Gen Contr
- Based in
- Brisbane
- On San Francisco permits
- Jul 2006 to Mar 2025
- Last 24 months
- 1 permit filed
74 permits since 2000: 46 completed, 1 in progress, 17 never finaled, 10 expired or cancelled.
Of the 17 never-finaled permits, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
29 kitchen remodel permits: 20 completed, 4 never finaled, 5 expired or cancelled. Typically 3 days from filing to permit and 302 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2023 | Completed final sign-off Dec 2024 | 338 Spear St | #38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes.Details
#38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes. | $95,000 |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 338 Spear St | unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of wallsDetails
unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of walls | $85,000 |
| Feb 2, 2023 | Completed final sign-off Jun 2024 | 301 Main St | replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kindDetails
replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kind | $85,000 |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 301 Main St | unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind.Details
unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind. | $150,000 |
| Dec 15, 2020 | Never finaled issued Dec 2020, no final | 338 Spear St | unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work requiredDetails
unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work required | $100,000 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 338 Spear St | replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed.Details
replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed. | $80,000 |
| May 28, 2020 | Completed final sign-off Nov 2020 | 301 Main St | unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes.Details
unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes. | $80,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 301 Main St | remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqftDetails
remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqft | $125,000 |
| Feb 6, 2019 | Completed final sign-off Aug 2019 | 301 Main St | unit 16h: remodel (e) kitchen cabinet andinstall (n) kitchen cabinets.Details
unit 16h: remodel (e) kitchen cabinet andinstall (n) kitchen cabinets. | $25,000 |
| Sep 26, 2017 | Completed final sign-off Sep 2019 | 409 Pacheco St | minor kitchen renovation with structural improvements. replacement of all cabinets.Details
minor kitchen renovation with structural improvements. replacement of all cabinets. | $39,000 |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 301 Main St | replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led.Details
replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led. | $40,000 |
| Dec 30, 2016 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | rev to 201511132592 changes to patio, retaining walls, stairs, plant material, drainage and ltg, low feature site wall added, nminor change to retaining wall ht., location to accomodate addl steps & better drainage minor plant rev to lower level laundry/utility room and rep/ltg & main level kitchenDetails
rev to 201511132592 changes to patio, retaining walls, stairs, plant material, drainage and ltg, low feature site wall added, nminor change to retaining wall ht., location to accomodate addl steps & better drainage minor plant rev to lower level laundry/utility room and rep/ltg & main level kitchen | |
| May 4, 2016 | Completed final sign-off Oct 2017 | 266 27th Av | interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking.Details
interior remodel of an (e) single family residence including (n) kitchen remodel, replace two (e) windows with one (n) window and one (n) folding door, at kitchen/interior deck. no work on primary facade. replace (e) decking. | $60,000 |
| Nov 13, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio.Details
interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio. | $150,000 |
| Apr 16, 2015 | Completed final sign-off Feb 2017 | 4721 17th St | renovate single family residence. laundry rm expansion @ rear of bldg, basement level. kitchen & dining rm expansion @ rear. (n) powder rm @ front of bldg, 1st fl reconfigure of 2nd fl planDetails
renovate single family residence. laundry rm expansion @ rear of bldg, basement level. kitchen & dining rm expansion @ rear. (n) powder rm @ front of bldg, 1st fl reconfigure of 2nd fl plan | $165,000 |
| Nov 25, 2014 | Completed final sign-off Aug 2015 | 1835 Leavenworth St | unit # 1:replace kitchen cabinets. cosmetic.Details
unit # 1:replace kitchen cabinets. cosmetic. | $20,000 |
| Sep 29, 2014 | Completed final sign-off Feb 2017 | 4721 17th St | renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovationDetails
renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovation | $200,000 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 394 Guerrero St | 3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain.Details
3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain. | $90,000 |
| Mar 21, 2014 | Completed final sign-off Feb 2015 | 1 Sunview Dr | remove interior partition non-load wall, move entry. kitchen (non load). renovate kitchen, replace kitchen window not facing street in kind. remove and install kitchen cabinets, counter top. all plmg & elec. under seperate permit. lighing install high efficacy. window u-factor 0.40 max.Details
remove interior partition non-load wall, move entry. kitchen (non load). renovate kitchen, replace kitchen window not facing street in kind. remove and install kitchen cabinets, counter top. all plmg & elec. under seperate permit. lighing install high efficacy. window u-factor 0.40 max. | $30,000 |
| Oct 26, 2012 | Never finaled issued Oct 2012, no final | 1654 Beach St | remodel kitchen, replace cabinets and countertops, lighting shall comply with t-24Details
remodel kitchen, replace cabinets and countertops, lighting shall comply with t-24 | $25,000 |
| Jun 29, 2011 | Completed final sign-off Mar 2012 | 711 46th Av | interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replacedDetails
interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replaced | $22,000 |
| May 20, 2011 | Expired or cancelled expired Jul 2014 | 2489 16th Av | remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level.Details
remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level. | $50,000 |
| Oct 14, 2010 | Completed final sign-off May 2011 | 210 Francisco St | unit #210 - renovation kitchen, install 2 new prop line windows on 3rd floor and one new prop line window on 4th floor of unit 210. enclose extg 3rd fl00r exterior deck.Details
unit #210 - renovation kitchen, install 2 new prop line windows on 3rd floor and one new prop line window on 4th floor of unit 210. enclose extg 3rd fl00r exterior deck. | $24,750 |
| Sep 9, 2010 | Completed final sign-off Apr 2011 | 2768 Harrison St | interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry.Details
interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry. | $45,000 |
| Apr 5, 2010 | Completed final sign-off May 2011 | 208 Francisco St | install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace.Details
install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace. | $85,000 |
| Mar 18, 2010 | Completed final sign-off Jul 2010 | 1916 Vallejo St | replace kitchen cabinets one unit, repair replace dry rot in windows in kind ; counter tops in 2 unitsDetails
replace kitchen cabinets one unit, repair replace dry rot in windows in kind ; counter tops in 2 units | $20,000 |
| Dec 8, 2009 | Completed final sign-off Jun 2010 | 1776 Sacramento St | demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen.Details
demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen. | $15,000 |
| Oct 31, 2008 | Expired or cancelled expired Jul 2010 | 1030 Clayton St | currently there are no cabinets in kitchen. we are adding cabinets.Details
currently there are no cabinets in kitchen. we are adding cabinets. | $18,200 |
| Mar 26, 2008 | Expired or cancelled expired Sep 2009 | 50 Palo Alto Av | interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail.Details
interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail. | $250,000 |