Nicholas Spencer Firth Gen Contr
- Based in
- Brisbane
- On San Francisco permits
- Jul 2006 to Mar 2025
- Last 24 months
- 1 permit filed
74 permits since 2000: 46 completed, 1 in progress, 17 never finaled, 10 expired or cancelled.
Of the 17 never-finaled permits, 6 are 5 to 10 years old, 11 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 18 completed, 1 in progress, 6 never finaled, 4 expired or cancelled. Typically 4 days from filing to permit and 362 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2025 | In progress issued Mar 2025 | 300 Spear St | remodel existing bathroom kind; aka 301 main street; unit b27e (building b, 27th floor)Details
remodel existing bathroom kind; aka 301 main street; unit b27e (building b, 27th floor) | $45,000 |
| Oct 30, 2023 | Completed final sign-off Dec 2024 | 338 Spear St | #38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes.Details
#38f: remodel (2) bathrooms and (1) kitchen in kind. enlarge (1) closet. no structural changes. | $95,000 |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 338 Spear St | unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of wallsDetails
unit 39b: replace fixtures and fitting in kind in (1) bathroom and (1) kitchen, no structural work required. no removal of walls | $85,000 |
| Feb 2, 2023 | Completed final sign-off Jun 2024 | 301 Main St | replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kindDetails
replace fixtures and fittings in two bathrooms and one kitchen. no framing or structural work required. in kind | $85,000 |
| Mar 2, 2022 | Completed final sign-off Feb 2023 | 338 Spear St | update master bathroom - replace existing toilet, sink, medicine cabinet, mirror, shower, tub, plumbing fixtures. no wall or layout changesDetails
update master bathroom - replace existing toilet, sink, medicine cabinet, mirror, shower, tub, plumbing fixtures. no wall or layout changes | $45,000 |
| Jun 14, 2021 | Never finaled issued Jun 2021, no final | 301 Main St | unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind.Details
unit 35a: replace (e) fixtures and fittings in two bathrooms and one kitchen. no structural work required. no plans in kind. | $150,000 |
| Dec 15, 2020 | Never finaled issued Dec 2020, no final | 338 Spear St | unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work requiredDetails
unit 28d: replace fixtures and fittings in two bathrooms and one kitchen no framing or structural work required | $100,000 |
| Jun 25, 2020 | Completed final sign-off Sep 2021 | 301 Main St | remodel master bathroom (8 ft x 16 ft). no structural alterations.Details
remodel master bathroom (8 ft x 16 ft). no structural alterations. | $70,000 |
| Jun 23, 2020 | Completed final sign-off Mar 2021 | 338 Spear St | replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed.Details
replace kitchen (12 x 6 ft) cabinets and counter tops, replace master bathroom (6 x 16 ft) fixtures and finishes. replacing existing fixtures, cabinets, and finishes. as is, no framing/structure work to be performed. | $80,000 |
| May 28, 2020 | Completed final sign-off Nov 2020 | 301 Main St | unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes.Details
unit 23e: remodel two bathrooms and one kitchen in-kind. replace existing fixtures and fittings with updated finishes. | $80,000 |
| Jun 7, 2019 | Completed final sign-off Oct 2020 | 301 Main St | remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqftDetails
remove and replace interior fixtures and finishes in 2.5 bathroom and 1 kitchen. no exterior or structural work required. bathrooms total 200 sqft kitchen total 120sqft | $125,000 |
| Nov 3, 2017 | Completed final sign-off Oct 2018 | 338 Spear St | remove and replace finishes in 3 bathrooms and 1 powder room; n/a maherDetails
remove and replace finishes in 3 bathrooms and 1 powder room; n/a maher | $100,000 |
| Jul 20, 2017 | Completed final sign-off Mar 2018 | 301 Main St | replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led.Details
replace (e) cabinets in kitchen and two bathrooms, like for like in unit 17b only. all ew lites are led. | $40,000 |
| Jun 26, 2017 | Never finaled issued Jul 2017, no final | 338 Spear St | replace e toilet and lav and add new shower enclosure at bath #3Details
replace e toilet and lav and add new shower enclosure at bath #3 | $15,000 |
| Apr 19, 2017 | Never finaled issued Apr 2019, no final | 50 Palo Alto Av | vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition.Details
vertical addition. add a 3rd story with a roof deck above to an existing 2 story single family residence. 3rd story will include a bedroom, bathroom, closet and gym. project is a vertical addition. | $190,500 |
| Jan 5, 2016 | Completed final sign-off Jan 2017 | 301 Main St | bathroom remodelDetails
bathroom remodel | $12,000 |
| Jan 5, 2016 | Completed final sign-off Jan 2017 | 301 Main St | bathroom remodelDetails
bathroom remodel | $12,000 |
| Nov 13, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio.Details
interior remodel consisting of kitchen remodel on main level and guest room, bathroom, and laundry on the lower level. work includes foundation replacement and at grade exterior patio. | $150,000 |
| Oct 7, 2015 | Expired or cancelled expired Oct 2024 | 34 Madrone Av | interior remodel of 2 upper floor bathrooms.Details
interior remodel of 2 upper floor bathrooms. | $40,000 |
| Jul 30, 2015 | Completed final sign-off Oct 2015 | 643 33rd Av | interior alterations to an (e) s.f.d. including new master bathroom. no exterior work. all work at thrid floor.Details
interior alterations to an (e) s.f.d. including new master bathroom. no exterior work. all work at thrid floor. | $8,000 |
| Sep 29, 2014 | Completed final sign-off Feb 2017 | 4721 17th St | renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovationDetails
renovatin of single family residence. convert portion of basement to conditioned space. remodel 1st fl entry, living rm, dining rom, kitchen. complete stair replacement and new exterior terrace at rear of building. reconfiguration of 2nd fl layout to accommodate new bath and master bath. renovation | $200,000 |
| Aug 20, 2014 | Never finaled issued Sep 2014, no final | 394 Guerrero St | 3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain.Details
3rd floor unit:interior alterations to an existing dwelling unit including kitchen and a new master bathroom, no addition. all existing fire resistive assemblies to remain. | $90,000 |
| Sep 15, 2011 | Never finaled issued Oct 2011, no final | 338 Spear St | unit #35d-bathroom remodel (2), 1 bathroom to become ada complaint, floor remodel for new showerDetails
unit #35d-bathroom remodel (2), 1 bathroom to become ada complaint, floor remodel for new shower | $6,000 |
| Jun 29, 2011 | Completed final sign-off Mar 2012 | 711 46th Av | interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replacedDetails
interior remodel of kitchen and bath. also included are posts and beams to support where walls are removed and 3 existing windows replaced | $22,000 |
| May 20, 2011 | Expired or cancelled expired Jul 2014 | 2489 16th Av | remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level.Details
remodel of exiting kitchen and creation of new master bath and closet. dry rot repair and waterproofing as req. replace existing windows in kind. install plywood panels & anchor bolts on lowest level. | $50,000 |
| Sep 9, 2010 | Completed final sign-off Apr 2011 | 2768 Harrison St | interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry.Details
interior remodel of extg 2nd story flat to include a remodel of the kitchen and bathroom in their extg locations.new work to include expansion of interior wall openings, replacement and relocation of some plmg fixtures, appliances, lighting, finishes, and cabinetry. | $45,000 |
| Apr 5, 2010 | Completed final sign-off May 2011 | 208 Francisco St | install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace.Details
install new entry dr at grade and enclose common stair hall. 2nd fl: renovate (e) bath & add bathrm#2. relocate kitchen and enclose (e)deck. upper fl: renovate (e) bathrm. remove (e)n stair to roof and replace w/ new one. enclose portion of (e) ext. deck, replace (e) gas fireplace. | $85,000 |
| Dec 8, 2009 | Completed final sign-off Jun 2010 | 1776 Sacramento St | demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen.Details
demo & install new kitchen cabinets. demo & install (n) tile in 2-bathrooms. 4-recessed lights in living room. 3-pendant lights in kitchen. | $15,000 |
| Mar 26, 2008 | Expired or cancelled expired Sep 2009 | 50 Palo Alto Av | interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail.Details
interior work remodel 1st & 2nd flr incl relocate kitchen,remodel living room,1 new bedroom,1 new bathroom and relocated stair. exterior work-new windows & exterior doors. 1 new lightwell and 1 reduced size lightwell. rebuild dilipadated deck in kind w/new guardrail. | $250,000 |