New West Construction Co**See Note**
- Based in
- San Mateo
- On San Francisco permits
- Jan 2003 to Dec 2014
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 30 days from filing to permit and 715 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 16, 2014 | Completed final sign-off Dec 2016 | 141 Marview Wy | 1st floor: add a new bedroom, a den, a full bathroom, a new sink and relocate washer and dryer per plan. . 2nd floor: relocate (e) bathroom and add a new bathroom, relocate closet at bedroom 1 to bedroom 2 per plan. reconfigure (e) interior stairway per plan. 1 new window & relocate 1 side window.Details
1st floor: add a new bedroom, a den, a full bathroom, a new sink and relocate washer and dryer per plan. . 2nd floor: relocate (e) bathroom and add a new bathroom, relocate closet at bedroom 1 to bedroom 2 per plan. reconfigure (e) interior stairway per plan. 1 new window & relocate 1 side window. | $42,000 |