Back to kitchen remodel contractors
New West Construction Co**See Note**
- Based in
- San Mateo
- On San Francisco permits
- Jan 2003 to Dec 2014
- Last 24 months
- 0 permits filed
8 permits since 2000: 5 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 88 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2007 | Completed final sign-off Aug 2007 | 615 Alvarado St | kitchen remodel within existing envelope.lighting added to existing living room,dining room. kitchen-recess cans, new water heater. new gyp at ceiling to be 5/8 type "x" gyp.wrap cans with 5/8 type "x" gyp.remove non bearing wall between kitchen&dining room.Details
kitchen remodel within existing envelope.lighting added to existing living room,dining room. kitchen-recess cans, new water heater. new gyp at ceiling to be 5/8 type "x" gyp.wrap cans with 5/8 type "x" gyp.remove non bearing wall between kitchen&dining room. | $25,000 |