Back to kitchen remodel contractors
New Coast
- Based in
- Sam Francisco
- On San Francisco permits
- Aug 2004 to Mar 2006
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
1 kitchen remodel permit: 1 completed. Typically 0 days from filing to permit and 89 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2005 | Completed final sign-off Dec 2005 | 351 Precita Av | wrk to be done at unit 353 precita (interior remodeling of (e) kitchen and laundry area (n) finish@ finish @ walls, ceiling, floors (n) cabinets/countertops, removal of partition wall & reinforcement of (e) ceiling joists; electrical, plumbing and mechanical upgrades; replacement of two (2) windows;Details
wrk to be done at unit 353 precita (interior remodeling of (e) kitchen and laundry area (n) finish@ finish @ walls, ceiling, floors (n) cabinets/countertops, removal of partition wall & reinforcement of (e) ceiling joists; electrical, plumbing and mechanical upgrades; replacement of two (2) windows; | $35,000 |