Back to bathroom remodel contractors
New Coast
- Based in
- Sam Francisco
- On San Francisco permits
- Aug 2004 to Mar 2006
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 0 days from filing to permit and 78 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 20, 2006 | Completed final sign-off Apr 2006 | 25 Dearborn St | replace (e) vinyl flooring with new tile, (n) wainscot, new paint. bathroom improvementDetails
replace (e) vinyl flooring with new tile, (n) wainscot, new paint. bathroom improvement | $2,000 |
| Feb 6, 2006 | Completed final sign-off May 2006 | 168 Precita Av | interior improvements (all non-structural) upper unit only: new tile shower in bathroom, replace (e) window; remove shelving, replace mantle facing in living room; enclose 2nd doorway in bedroom, add closet space; relocate primary doorway in bedroom.Details
interior improvements (all non-structural) upper unit only: new tile shower in bathroom, replace (e) window; remove shelving, replace mantle facing in living room; enclose 2nd doorway in bedroom, add closet space; relocate primary doorway in bedroom. | $12,000 |
| Jul 11, 2005 | Completed final sign-off Sep 2005 | 351 Precita Av | bathroom remodel. replace tub/sink/toilet/fixtures in e locations. replace light fixtures,add 1 gfciDetails
bathroom remodel. replace tub/sink/toilet/fixtures in e locations. replace light fixtures,add 1 gfci | $14,000 |