Nest Building
- Based in
- Pacifica
- On San Francisco permits
- Jul 2012 to May 2020
- Last 24 months
- 0 permits filed
30 permits since 2000: 30 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 30, 2016 | Completed final sign-off Feb 2017 | 233 14th St | replacing dryrotted sections of back stairs in-kind; (1) landing will be replaced with a roofing membrane over plywood; less than 50% replaced.Details
replacing dryrotted sections of back stairs in-kind; (1) landing will be replaced with a roofing membrane over plywood; less than 50% replaced. | $6,000 |
| Jun 17, 2013 | Completed final sign-off Nov 2013 | 1033 Lake St | repair and replace in kind dry rot at front stairs side wall, repair & replace w/kind dryrotted door & 5 windows at rear/side of house . windows not vivible from the street,Details
repair and replace in kind dry rot at front stairs side wall, repair & replace w/kind dryrotted door & 5 windows at rear/side of house . windows not vivible from the street, | $9,500 |