Back to kitchen remodel contractors
Nest Building
- Based in
- Pacifica
- On San Francisco permits
- Jul 2012 to May 2020
- Last 24 months
- 0 permits filed
30 permits since 2000: 30 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 97 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 15, 2019 | Completed final sign-off Sep 2019 | 166 Riverton Dr | one kitchen remodel including cabinetry and fixtures replacement. also replacing (2) windows in kind. not facing streetDetails
one kitchen remodel including cabinetry and fixtures replacement. also replacing (2) windows in kind. not facing street | $15,000 |
| Sep 8, 2017 | Completed final sign-off Dec 2017 | 35 Valdez Av | kitchen remodel - new cabinets, counter tops and opening/widening a doorway.Details
kitchen remodel - new cabinets, counter tops and opening/widening a doorway. | $15,000 |
| May 17, 2016 | Completed final sign-off Aug 2016 | 235 14th St | renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit.Details
renovation of 2nd floor unit kitchen: scope includes replacement cabinets, countertop & applicances; plumbing fixtures @ existing locations; new double door to adjacent living room; new lighting, new finises. electrical under separate permit. | $61,818 |
| Oct 2, 2013 | Completed final sign-off Dec 2013 | 3233 Noriega St | changing kitchen cabinets and countertops. lighting to comply with cec 150(k)Details
changing kitchen cabinets and countertops. lighting to comply with cec 150(k) | $25,000 |