Back to kitchen remodel contractors
Neng Construction, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2019 to Apr 2025
- Last 24 months
- 4 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 13, 2025 | Completed final sign-off Sep 2025 | 114 22nd Av | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $12,000 |
| Dec 12, 2024 | Completed final sign-off Oct 2025 | 2058 22nd Av | remodel kitchen and bathroom, same place in the house. it involves to remove the walls, turn the existing shower into storage room.Details
remodel kitchen and bathroom, same place in the house. it involves to remove the walls, turn the existing shower into storage room. | $12,000 |
| Dec 2, 2024 | Completed final sign-off Jan 2025 | 1533 Sanchez St | in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 1st fl installing gas line. | $10,561 |
| Dec 2, 2024 | Completed final sign-off Jan 2025 | 1531 Sanchez St | in-kind remodeling of 1 kitchen(s) in 2nd fl installing gas line.Details
in-kind remodeling of 1 kitchen(s) in 2nd fl installing gas line. | $10,561 |
| Aug 6, 2024 | Completed final sign-off Oct 2024 | 2170 09th Av | kitchen remodeling. replace kitchen window rear back of the house.Details
kitchen remodeling. replace kitchen window rear back of the house. | $18,000 |
| Aug 7, 2023 | Completed final sign-off Dec 2023 | 367 Prague St | g/f: voluntary install anchor bolts @ footings. 2nd/f: relocate/remodel (e) bath. provide (n) bath. remodel (e) kitchen. remodule (e) closet @ bedroom. switch locations of front (e) living w/ rear (e) bedroom. rewire all lighting & receptacles. remove all (e) wall/ceiling finishes & install 5/8" tyDetails
g/f: voluntary install anchor bolts @ footings. 2nd/f: relocate/remodel (e) bath. provide (n) bath. remodel (e) kitchen. remodule (e) closet @ bedroom. switch locations of front (e) living w/ rear (e) bedroom. rewire all lighting & receptacles. remove all (e) wall/ceiling finishes & install 5/8" ty | $35,000 |
| Mar 30, 2021 | Completed final sign-off Aug 2021 | 519 21st Av | remodel kitchen, remodel master bathroom. no change to wall & opening layout.Details
remodel kitchen, remodel master bathroom. no change to wall & opening layout. | $25,000 |