Back to bathroom remodel contractors
Neng Construction, Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2019 to Apr 2025
- Last 24 months
- 4 permits filed
13 permits since 2000: 13 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2024 | Completed final sign-off Oct 2025 | 2058 22nd Av | remodel kitchen and bathroom, same place in the house. it involves to remove the walls, turn the existing shower into storage room.Details
remodel kitchen and bathroom, same place in the house. it involves to remove the walls, turn the existing shower into storage room. | $12,000 |
| Sep 19, 2024 | Completed final sign-off Feb 2025 | 367 Prague St | 1st floor: 1)add media room and add wetbar, and one full bathroom. convert storage room into office. 2)relocated washer and dryer. 3)ac split unit for the new living space at 1st floor.Details
1st floor: 1)add media room and add wetbar, and one full bathroom. convert storage room into office. 2)relocated washer and dryer. 3)ac split unit for the new living space at 1st floor. | $23,000 |
| Sep 15, 2024 | Completed final sign-off Nov 2024 | 2058 22nd Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $10,600 |
| Aug 7, 2023 | Completed final sign-off Dec 2023 | 367 Prague St | g/f: voluntary install anchor bolts @ footings. 2nd/f: relocate/remodel (e) bath. provide (n) bath. remodel (e) kitchen. remodule (e) closet @ bedroom. switch locations of front (e) living w/ rear (e) bedroom. rewire all lighting & receptacles. remove all (e) wall/ceiling finishes & install 5/8" tyDetails
g/f: voluntary install anchor bolts @ footings. 2nd/f: relocate/remodel (e) bath. provide (n) bath. remodel (e) kitchen. remodule (e) closet @ bedroom. switch locations of front (e) living w/ rear (e) bedroom. rewire all lighting & receptacles. remove all (e) wall/ceiling finishes & install 5/8" ty | $35,000 |
| Jun 1, 2022 | Completed final sign-off Nov 2023 | 141 Loehr St | remodel ground fl w/ 1 bedroom, 1 family rm, & 1 full bath.Details
remodel ground fl w/ 1 bedroom, 1 family rm, & 1 full bath. | $40,888 |
| Mar 30, 2021 | Completed final sign-off Aug 2021 | 519 21st Av | remodel kitchen, remodel master bathroom. no change to wall & opening layout.Details
remodel kitchen, remodel master bathroom. no change to wall & opening layout. | $25,000 |
| Jan 29, 2020 | Completed final sign-off Dec 2021 | 1415 Cole St | living room to bedroom conversion. enlarge existing bath. create new full bath.Details
living room to bedroom conversion. enlarge existing bath. create new full bath. | $70,000 |