Back to kitchen remodel contractors
Nelson T Lewis Const Co Inc.
- Based in
- Hayward
- On San Francisco permits
- Jan 2010 to Sep 2026
- Last 24 months
- 34 permits filed
143 permits since 2000: 133 completed, 3 in progress, 2 never finaled, 5 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
81 kitchen remodel permits: 75 completed, 3 in progress, 3 expired or cancelled. Typically 7 days from filing to permit and 87 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1045-remove and replace(e)kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $86,500 |
| Sep 10, 2026 | In progress issued Sep 2026 | 1661 Pine St | unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switchDetails
unit1019-remove and replace (e) kitchen and vanity cabs in kind replace(e)electrical panel w/125amp panel.install(n)cermic toilet plumbing fixtures in kind.no wall moving 2 bath remodel in kind.kitchen remodel in kind no tub to shower conversation.(n)hood w/ 400cfm &(n)bath fan w/humidistat switch | $72,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 1661 Pine St | unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions.Details
unit 618: remove and replace kitchen cabinets, vanity cabinets in kind, replace electrical sub panel 125 amps, install new ceramic tiles and plumbing fixtures in kind. no wall moving. 1 bathroom and 1 kitchen remodel. no tub conversions. | $75,000 |
| Jun 18, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kindDetails
unit 315 - remodel bath in-kind. new plumbing fixtures in-kind kitchen remodel in-kind. replace existing panel w/new 125 amp panel. new cabinets & tile in-kind | $72,000 |
| May 29, 2026 | Completed final sign-off Aug 2026 | 1661 Pine St | unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1014: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 1 bath remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $72,000 |
| May 29, 2026 | Completed final sign-off Sep 2026 | 1661 Pine St | unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area)Details
unit 1013: remove and replace (e) kitchen & vanity cabs. replace (e) electrical panel w/new 125amp panel. install new ceremic tile & plumbing fixtures. no wall moving. 2 baths remodel in kind. kitchen remodel in kind. (no work in sleeping area) | $92,000 |
| May 5, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving.Details
unit 512: 1 kitchen and 1 bathroom remodel, new kitchen cabinets, replace existing subpanel 125 amps. install new ceramic tiles, new shower valves in bathroom. no wall moving. | $72,000 |
| Apr 13, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind.Details
unit 316: remove and replace existing kitchen and vanity cabinets in kind. electric panel to be replaced w 125 amp panel. new ceramic tile and plumbing fixtures. no wall changes. 1 bath remodel in kind. kitchen remodel in kind. | $82,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind.Details
#1341: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 2.5 bath remodel in kind. kitchen remodel in kind. | $89,000 |
| Mar 3, 2026 | Completed final sign-off Jul 2026 | 1661 Pine St | #327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind.Details
#327: remove & replace existing kitchen and vanity cabinets, replace inkind. existing electrical panel to be replaced with 125 amp panel. install new ceramic tile & plumbing fixtures. no wall moving. 1.5 bath remodel in kind. kitchen remodel in kind. | $70,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count.Details
unit 933: remove and replace kitchen and vanity cabinets in kind, replace electrical panel with 125 amp panel, install new tiles and plumbing fixtures in bathrooms. 1 bathroom and 1 kitchen remodel. no change in plumbing fixture count. | $89,000 |
| Jan 23, 2026 | Completed final sign-off Apr 2026 | 1661 Pine St | unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel.Details
unit 1136: remove and replace kitchen and vanity cabinets, in kind, existing electrical panel to be replaced 125 amps. install new tiles and plumbing fixtures, bathroom, no wall moving, 2 bath remodels and 1 kitchen remodel. | $89,000 |
| Dec 8, 2025 | Completed final sign-off Feb 2026 | 1661 Pine St | unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain.Details
unit # 1034: remove (e) kitchen + vanity cabs, replace in kind. replace (e) elec panel w/ new 125 amp panel. install new ceramic tile + plumbing fixtures. no wall moving. replace (e) shower w/ new ceramic tile shower. one kitchen remodel in kind. all (e) accessiblity features to remain. | $84,900 |
| Nov 13, 2025 | Expired or cancelled withdrawn Dec 2025 | 1661 Pine St | unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp.Details
unit# 1034: kitchen remodel with cabinets replaced inkind & bathroom remodel- tub to shower, install ceramic tile & plumbing fixtures. changing electrical panel to 125amp. | $84,000 |
| Sep 23, 2025 | Expired or cancelled cancelled Jan 2026 | 1661 Pine St | unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #535: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | #531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintainedDetails
#531. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, one bath remodel in kind, kitchen remodel in kind. accessibility features to be maintained | $84,900 |
| Sep 23, 2025 | Completed final sign-off Jan 2026 | 1661 Pine St | #646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintainedDetails
#646. remove (e) kitchen and vanity cabinets, replace in kind. (e) electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no wall moving, 2.5 bath remodel in kind, kitchen remodel in kind. existing accessibilty features to be maintained | $89,000 |
| Sep 23, 2025 | Completed final sign-off Dec 2025 | 1661 Pine St | unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind.Details
unit #518: remove (e) kitchen + vanity cabinets replace in kind. (e) electrical panel to be replaced w/ new 125 amp panel. install new cermaic tile + plumbing fixtures no wall moving. one bath remodel in kind. remodel kitchen in kind. | $84,900 |
| Sep 4, 2025 | Completed final sign-off Nov 2025 | 1661 Pine St | apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved.Details
apt 428: kitchen and bath remodel in kind. existing electrical panel to be replaced with 125 amp panel. intsall new ceramic tiles, plumbing fixtures. no walls being moved. | $84,900 |
| Aug 19, 2025 | Completed final sign-off Oct 2025 | 1661 Pine St | unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving.Details
unit 524; remove(e) kitchen and vanity cabinets. replace in kind. (e) electrical panel to be replaced with new 125amp panel. install new ceramic tile and plumbing fixtures. no walls moving. | $79,800 |
| Jul 9, 2025 | Completed final sign-off Jan 2026 | 3400 Laguna St | 2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change.Details
2nd floor:/combine 238 and 240. combining of 2 studio units into a one bedroom unit. work includes casework, finishes, & fixtures. convert one extg bathroom into a kitchenette; remodel extg bathroom including replaceing extg lavatory sink; toilet & shower (combined sqft area of unit doesn't change. | $80,000 |
| Jun 20, 2025 | Completed final sign-off Sep 2025 | 3400 Laguna St | 3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work.Details
3rd floor:combine 2 studio units 328 & 329 into two bedroom unit, work includes case work, finishes and fixtures. remove one kitchenette, no working in remaining kitchenette or bathroom. no exterior work. | $107,160 |
| May 23, 2025 | Completed final sign-off Jul 2025 | 1661 Pine St | unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind.Details
unit 715. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom in kind. | $79,800 |
| May 23, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind.Details
unit 416. remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic tile and plumbing fixtures. no walls moving. kitchen and bathroom remodel in kind. | $78,900 |
| Apr 21, 2025 | Completed final sign-off Jun 2025 | 1661 Pine St | unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving.Details
unit 931 - remove kitchen and vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install new ceramic toilet plumbing fixtures. no walls moving. | $79,800 |
| Apr 4, 2025 | Completed final sign-off Aug 2025 | 1661 Pine St | unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls movingDetails
unit #1023: remove kitchen & vanity cabinets, replace in kind. existing electrical panel to be replaced with new 125 amp panel. install ceramic tile & plumbing fixtures. no walls moving | $89,000 |
| Mar 13, 2025 | Completed final sign-off May 2025 | 1661 Pine St | apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall movingDetails
apt #1018: remove kitchen and vanity cabinets replae in kind (e) electrical panel to be replaced with new 125 amp panel install new ceramic tile and plumbing fixtures no wall moving | $72,400 |
| Mar 5, 2025 | Completed final sign-off May 2025 | 1661 Pine St | unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout changeDetails
unit 528- remove kitchen and vanity cabinets, replace in kind (e) 125 amp subpanel. install (n) ceramic tile and plubming fixtures. no walls moving or layout change | $83,200 |
| Feb 10, 2025 | Completed final sign-off Apr 2025 | 1661 Pine St | unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls movedDetails
unit #1035: remove & replace kitchen cabinets in kind both vanities to be replaced in kind (e) elec panel to be replaced w/new 125 amp panel, install new plumbing fixutres and ceramic tile. no walls moved | $83,000 |
| Dec 26, 2024 | Completed final sign-off Mar 2025 | 1661 Pine St | unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving).Details
unit # 928 remove and replace in kind kitchen and vanity cabinets, (e) electrical panel to be replaced with new 125 amp panel install new plumbing fixtures and ceramic tile (no walls are moving). | $81,000 |
| Nov 15, 2024 | Completed final sign-off Apr 2025 | 1661 Pine St | 11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction.Details
11th floor unit 1143: remove and replace kitchen cabinets in kind. remove and replace both vanities in kind. (e) electrical panel to be replaced with (n) 125amp panel. install new tile and plumbing fixtures at bathrooms. no wall demolition or construction. | $88,000 |
| May 10, 2024 | Completed final sign-off Sep 2024 | 1661 Pine St | 6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layoutDetails
6th fl- unit 632- replace kitchen cabinets in kind. replace 1 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel. no change to orignal floor plan layout | $69,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
7th fl- unit 746- replace kitchen cabinets in kind. replace bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $89,000 |
| May 10, 2024 | Completed final sign-off Dec 2024 | 1661 Pine St | 8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layoutDetails
8th fl- unit 845- replace kitchen cabinets in kind. replace 2 bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel no change to original floor plan layout | $91,000 |
| May 10, 2024 | Completed final sign-off Jul 2024 | 1661 Pine St | 5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanelDetails
5th fl- unit 525- replace kitchen cabinets in kind. replace two bath vantiies in kind. replace ceramic tile. replace plumbing fixtures and add (n) 125amp subpanel | $76,000 |
| Mar 5, 2024 | Completed final sign-off May 2024 | 1661 Pine St | 4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain)Details
4th floor: apt #424: remove and replace in kind kitchen cabinets. extg electrical panel, replace with new 125 amp panel. install new tile and plumbing fixtures. no walls are moved. bathroom tile replacement (existing toilet and vanity to remain) | $73,000 |
| Feb 8, 2024 | Completed final sign-off Apr 2024 | 1661 Pine St | 10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1010: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $69,000 |
| Feb 8, 2024 | Completed final sign-off Jun 2024 | 1661 Pine St | 10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving)Details
10th fl. unit 1027: remove and replace in kind kitchen cabinets and vaniteies in kind (e) elecrical panel replace with (n) 125 amp panel, install new tile and plumbing fixtures at restroom (no walls are moving) | $84,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 1028: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $81,000 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 734: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $69,200 |
| Nov 28, 2023 | Completed final sign-off Mar 2024 | 1661 Pine St | unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving wallsDetails
unit 523: remove and replace in kind kitchen cabinets and vanities in kind, (e) electricl panel replaced with (n) 125 amp panel, install new tile and plumbing fixtures at bathroom, no moving walls | $68,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work.Details
unit 510: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixturs at bathroom. no wall moving or structural work. | $41,500 |
| Nov 7, 2023 | Completed final sign-off Feb 2024 | 1661 Pine St | unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work.Details
unit 331: remove and replace in-kind kitchen cabinets & vanites inkind. (e) electrical panel replaced with (n) 125a panel. install new tile, plumbing fixtures at bathroom. no wall moving or structural work. | $41,500 |
| Sep 12, 2023 | Completed final sign-off Nov 2023 | 3400 Laguna St | 3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures.Details
3/f unit# 303: remodel and expansion of existing bathroom, cosmetic renovation of living area kitchenette and bedroom. work will include new lights, casework, finishes and fixtures. | $78,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 725 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 438 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 436 (4th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $72,000 |
| Jun 30, 2023 | Completed final sign-off Dec 2023 | 1661 Pine St | unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 737 (7th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $88,000 |
| Jun 30, 2023 | Completed final sign-off Oct 2023 | 1661 Pine St | unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 1033 (10th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $69,000 |
| Jun 30, 2023 | Completed final sign-off Nov 2023 | 1661 Pine St | unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving.Details
unit # 538 (5th fl): remove + replace in-kind kitchen cabinets & vanities in-kind. (e) electrical panel, replace with (n) 125 amp panel. install new tile & plumbing fixtures at 2 bathrooms. no walls are moving. | $76,000 |
| Apr 21, 2022 | Completed final sign-off Aug 2022 | 3400 Laguna St | 4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures.Details
4th flr: combination of (3) studio units to one (2) bedroom (2) bathroom, unit renovations addition of new kitchenette, cosmetic renovations of (n) lighting, casework, finished and fixtures. | $140,000 |
| Dec 28, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures.Details
unit #412: cosmetic renovation of (e) living room, bedroom, & bath. addition of new kitchenette to living room (same sq ft). interior only. (n) lighting, casework, finishes & fixtures. | $38,000 |
| Dec 21, 2020 | Completed final sign-off Jun 2021 | 3400 Laguna St | (unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work.Details
(unit #311, 3rd fl): cosmetic renovation. existing bath & kitchenette. remodel of existing bedroom remodel & expand closet. work includes new lighting, casework, finishes & fixtures. no exterior work. | $60,000 |
| Jul 7, 2020 | Completed final sign-off Nov 2020 | 3400 Laguna St | 4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404.Details
4th floor: suites 403 & 404: extg occupancy class r-2.1 property (no change of use) combining units 403 & 404. cosmetic renovation of extg bathroom, and extg kitchenette at unit 403. remodel of extg bathroom at unit 403.remodel & expansion of extg bath, remodel expansion of closet at unit 404. | $174,000 |
| Jul 7, 2020 | Completed final sign-off Oct 2020 | 3400 Laguna St | 2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures.Details
2nd floor: suites 204,205,& 206: extg occupancy class r-2.1 property (no change of use) combining 3 studio units to one (1) 2 bedroom two bathroom unit. renovation includes addition of new kitchenette, cosmetic renovation of extg bath at unit 205, nw lighting, casework, finishes, and fixtures. | $160,000 |
| Feb 26, 2018 | Completed final sign-off May 2018 | 3400 Laguna St | unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures.Details
unit 320: remodel of extg kitchenette and bathroom, and cosmetic renovations of living area. work includes: new righting, casework, finishes, and fixtures. | $100,000 |
| Aug 31, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na.Details
unit merger, combine #244 (1) studio and #242 (1) bedroom units to create (1) two bedroom unit, to be called #244. remodel & expansion of (e) bath. remodel of (e) closet & cosmetic renovations of living area. addition of kitchenette. work includes new lighting,casework, finishes & fixtures maher na. | $120,000 |
| Aug 17, 2017 | Completed final sign-off Jan 2018 | 3400 Laguna St | #328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13Details
#328- remodel existing bath, kitchenette and closet, cosmetic renovations of living area, work includes new lighting, casework, finishes and fixtures. n/a ordinance #155-13 | $120,000 |
| May 17, 2017 | Completed final sign-off Oct 2017 | 3400 Laguna St | unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307Details
unit 307 - combination of two studio units to make one, one bedroom unit. new work to include electrical, plumbing, casework, lighting, kitchenette and finishes. remodel of existing bathroom. combine units #306 & #307 | $100,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 3400 Laguna St | unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer.Details
unit #314 - removal (e) bathroom & closet to create larger bathroom. work includes finishes, electrical, plumbing. refinish cabinets @ kitchenette, add drawer. | $50,000 |
| Mar 20, 2017 | Completed final sign-off Apr 2017 | 1400 Geary Bl | 7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a denDetails
7th flr: unit 7j - revision to 201612165232: cooktop and fan removed from project. mechanical removed. adding electrical. kitchenetter was moved creating a den | |
| Jan 12, 2017 | Completed final sign-off Jul 2017 | 3400 Laguna St | unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinanceDetails
unit renovation including bath & kitchenette finishes. replace exterior door/window with new windows steel sash in unit 332. n/a maher ordinance | $75,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2017 | 1400 Geary Bl | 7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette.Details
7th floor - unit 7j: interior remodel, replace plumbing fixtures. install shower grabbar backing. add local smoke alarm at sleeping room and living room/entry area. (n) cooktop and exhaust hood in kitchenette. | $30,000 |
| Oct 31, 2016 | Completed final sign-off Dec 2016 | 1400 Geary Bl | 25th fl/unit 2507 interior replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living rm/entry area. there is no exterior work,no cooktop in kitchenetteDetails
25th fl/unit 2507 interior replace plumbing fixtures, install shower grab bar backing. add local smoke alarm at sleeping room and living rm/entry area. there is no exterior work,no cooktop in kitchenette | $6,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette.Details
unit 508/5th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. adding light switch to extg closet light. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 4k/4th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $65,000 |
| Jun 24, 2016 | Completed final sign-off Sep 2016 | 1400 Geary Bl | unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette.Details
unit 1805/18th floor: interior remodel, replace plumbing fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cook top in kitchenette. | $85,000 |
| May 6, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher naDetails
unit 326: interior remodel 330 sq ft remodel (e) studio apt. bathroom, upgrade shower add grab bars w/backing. add new tile throughout. replace plumbing fixtures, replace (e) light fixtures add new kitchenette w/sink. no stove. maher na | $110,000 |
| Mar 30, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenetteDetails
11th fl, unit 1105: interior remodel, replace plumbing fixtures, install shower grab bar backing. add local smoke detector at sleeping room and living rm entry area. no exterior work, no cooktop in kitchenette | $12,000 |
| Mar 24, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | remodel 4 existing common room kitchens. new countertops, cabinets, flooring, new appliances. refrig,microwave. reduce light fixtures, add new fixtures, replace sinks and faucets. maher not reqDetails
remodel 4 existing common room kitchens. new countertops, cabinets, flooring, new appliances. refrig,microwave. reduce light fixtures, add new fixtures, replace sinks and faucets. maher not req | $190,000 |
| Mar 17, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette.Details
6/f unit #601- interior remodel to replace plumbing fixtures, install shower grab bar, backing, add local smoke detector at sleeping room and living room/entry area. there is no exterior work. there is no cooking top in kitchenette. | $1,000 |
| Mar 17, 2016 | Completed final sign-off May 2016 | 1400 Geary Bl | 6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work.Details
6/f unit #6p- interior remodel one bedroom and den. changing the kitchenette area to the entry way and adding closet space in the den. bathroom work. there is no exterior work. | $130,000 |
| Mar 14, 2016 | Completed final sign-off Dec 2016 | 3400 Laguna St | unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher naDetails
unit 325, interior remokdel (340 sq ft) remokdel (e) studio apt and bathroom. upgrade shower, add grab bars with backing, add tile throughout. replace plumbing fixtrues. replace (e) lights/add new. add new kitchenette with sink & appliances - no cook top. maher na | $110,000 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
17th floor, unit 1704: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 4th floor, unit 406: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
4th floor, unit 406: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jul 2016 | 1400 Geary Bl | 7th floor, unit 706: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
7th floor, unit 706: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Jun 2016 | 1400 Geary Bl | 11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
11th floor, uit 1103: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $42,735 |
| Jan 27, 2016 | Completed final sign-off Apr 2016 | 1400 Geary Bl | 4th floor, unit 402: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette.Details
4th floor, unit 402: interior remodel. replace plumbing, fixtures, install shower grab bar backing, add local smoke detector at sleeping room and living room/entry area. no exterior work. no cook-top in kitchenette. | $43,890 |
| Jan 19, 2016 | Completed final sign-off Apr 2016 | 1400 Geary Bl | 16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work.Details
16th flr: unit #1603: interior remodel, replace fixtures, add or replace certain light fixtures, add power outlets for convenience appliances at kitchenette, add local smoke detector install shower grab bars and backing.no exterior work. | $42,350 |
| May 28, 2010 | Expired or cancelled expired Aug 2013 | 1661 Pine St | unit# 444 on the 4th floor. interior remodel of (e) kitchen and two bathrooms. existing wall to remain.Details
unit# 444 on the 4th floor. interior remodel of (e) kitchen and two bathrooms. existing wall to remain. | $70,000 |
| Apr 20, 2010 | Completed final sign-off Jun 2010 | 1661 Pine St | unit #814 interior remodel of kitchen, delete some partitions, replace vanity.Details
unit #814 interior remodel of kitchen, delete some partitions, replace vanity. | $40,000 |