Back to kitchen remodel contractors
Nathan Cole Construction
- Based in
- San Bruno
- On San Francisco permits
- Feb 2012 to Jul 2026
- Last 24 months
- 7 permits filed
41 permits since 2000: 39 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 19 completed. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 1, 2026 | Completed final sign-off Jul 2026 | 2491 47th Av | main level kitchen wall removal w/ patched finishes.Details
main level kitchen wall removal w/ patched finishes. | $20,000 |
| Sep 20, 2024 | Completed final sign-off Feb 2025 | 409 14th Av | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $20,000 |
| Nov 21, 2023 | Completed final sign-off Feb 2024 | 1921 Grant Av | proposed enlarge opening to an existing wall demising a kitchen & dining room in the upper unit of a 2-story over garage duplex. no work to bldg exterior or lower unit.Details
proposed enlarge opening to an existing wall demising a kitchen & dining room in the upper unit of a 2-story over garage duplex. no work to bldg exterior or lower unit. | $9,000 |
| Sep 29, 2022 | Completed final sign-off Dec 2022 | 283 Staples Av | in-kind remodeling of 1 kitchen(s) in 1st flDetails
in-kind remodeling of 1 kitchen(s) in 1st fl | $10,561 |
| Nov 17, 2020 | Completed final sign-off May 2021 | 1950 Hayes St | remodel kitchen, bath, 1/2 bath unit 4 onlyDetails
remodel kitchen, bath, 1/2 bath unit 4 only | $40,000 |
| Oct 3, 2020 | Completed final sign-off Jan 2021 | 663 02nd Av | replace kitchen cabinet - kitchen remodel; replace bathroom tile - bathroom remodelDetails
replace kitchen cabinet - kitchen remodel; replace bathroom tile - bathroom remodel | $35,000 |
| Jan 29, 2020 | Completed final sign-off Jul 2020 | 65 Terrace Dr | kitchen remodel. replace cabinets, sink, and countertop.Details
kitchen remodel. replace cabinets, sink, and countertop. | $15,000 |
| May 31, 2019 | Completed final sign-off Jul 2019 | 2610 47th Av | single kitchen remodel, non structural in kindDetails
single kitchen remodel, non structural in kind | $12,000 |
| Oct 15, 2018 | Completed final sign-off Mar 2019 | 714 Waller St | demo existing kitchen and relocate to another room. new cabinets, appliances, countertops. install built in shelving, a bar sink, wine fridge, secondary dishwasher and wine fridgeDetails
demo existing kitchen and relocate to another room. new cabinets, appliances, countertops. install built in shelving, a bar sink, wine fridge, secondary dishwasher and wine fridge | $25,000 |
| May 4, 2018 | Completed final sign-off Jun 2018 | 27 Ardenwood Wy | to comply with complaint # 201488957 & 2017016471 enf remove (e) kitchen at ground floorDetails
to comply with complaint # 201488957 & 2017016471 enf remove (e) kitchen at ground floor | $1,000 |
| Mar 12, 2018 | Completed final sign-off May 2018 | 536 Roosevelt Wy | kitchen remodel. replace cabinets and countertops. under cabinet lighting.Details
kitchen remodel. replace cabinets and countertops. under cabinet lighting. | $20,000 |
| Jan 10, 2017 | Completed final sign-off Mar 2017 | 1007 Lombard St | replace kitchen cabinets and countertop. update countertop circuit. replace bathtub and shower valve. refinish floor. tile work.Details
replace kitchen cabinets and countertop. update countertop circuit. replace bathtub and shower valve. refinish floor. tile work. | $10,000 |
| Aug 1, 2016 | Completed final sign-off Sep 2016 | 3569 17th St | kitchen remodeling with opening changes per plan, replacement of case work relocation of sink and electrical outlets and modification of non-structural partitionsDetails
kitchen remodeling with opening changes per plan, replacement of case work relocation of sink and electrical outlets and modification of non-structural partitions | $20,000 |
| Jun 14, 2016 | Completed final sign-off Jun 2016 | 1329 Pierce St | add outlets to countertop circuits, replace sink, faucet, vanity in bathroom. replace sink, faucet, dishwasher, countertop in kitchen.Details
add outlets to countertop circuits, replace sink, faucet, vanity in bathroom. replace sink, faucet, dishwasher, countertop in kitchen. | $800 |
| Nov 25, 2015 | Completed final sign-off Dec 2015 | 32 Beideman St | kitchen remodel - new cabinets and counter tops. no change to existing layout.Details
kitchen remodel - new cabinets and counter tops. no change to existing layout. | $5,000 |
| Nov 25, 2015 | Completed final sign-off Feb 2016 | 12 Joy St | kitchen remodel - new cabinets and counter tops. no change to existing layout.Details
kitchen remodel - new cabinets and counter tops. no change to existing layout. | $10,000 |
| Nov 21, 2014 | Completed final sign-off Jan 2015 | 842 33rd Av | replace kitchen cabinets and countertop (2 kitchens) re-tle bathroom walls and floor (2 bathrooms) new sink in kitchen and bathroomDetails
replace kitchen cabinets and countertop (2 kitchens) re-tle bathroom walls and floor (2 bathrooms) new sink in kitchen and bathroom | $30,000 |
| Aug 28, 2014 | Completed final sign-off Nov 2014 | 22 Beideman St | replace kitchen cabinets & countertop, upgrade receptacles to gfi.Details
replace kitchen cabinets & countertop, upgrade receptacles to gfi. | $5,000 |
| Aug 28, 2014 | Completed final sign-off Nov 2014 | 1269 South Van Ness Av | unit a: replace kitchen cabinets & countertop, upgrade receptacles to gfi.Details
unit a: replace kitchen cabinets & countertop, upgrade receptacles to gfi. | $5,000 |