Back to bathroom remodel contractors
Nathan Cole Construction
- Based in
- San Bruno
- On San Francisco permits
- Feb 2012 to Jul 2026
- Last 24 months
- 7 permits filed
41 permits since 2000: 39 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 18 completed. Typically 0 days from filing to permit and 54 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | Completed final sign-off Sep 2026 | 1187 Munich St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $10,561 |
| Oct 7, 2025 | Completed final sign-off Nov 2025 | 56 Rockwood Ct | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $10,561 |
| Jun 11, 2025 | Completed final sign-off Sep 2025 | 258 Diamond St | in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 3rd fl with 1 shower pan(s). | $10,561 |
| Jun 24, 2024 | Completed final sign-off Jul 2025 | 1845 Leavenworth St | unit 101: water damage repair. replace sheetrock and insulation throughout. bathroom remodel. all interior. all in-kind.5/8 type x gb throughout.Details
unit 101: water damage repair. replace sheetrock and insulation throughout. bathroom remodel. all interior. all in-kind.5/8 type x gb throughout. | $40,000 |
| May 3, 2024 | Completed final sign-off Jun 2024 | 285 Douglass St | bathroom remodel in kind. new subpanel. max weight less than 150 lbsDetails
bathroom remodel in kind. new subpanel. max weight less than 150 lbs | $25,000 |
| Mar 29, 2022 | Completed final sign-off May 2022 | 2610 47th Av | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $10,562 |
| Nov 17, 2020 | Completed final sign-off May 2021 | 1950 Hayes St | remodel kitchen, bath, 1/2 bath unit 4 onlyDetails
remodel kitchen, bath, 1/2 bath unit 4 only | $40,000 |
| Oct 3, 2020 | Completed final sign-off Jan 2021 | 663 02nd Av | replace kitchen cabinet - kitchen remodel; replace bathroom tile - bathroom remodelDetails
replace kitchen cabinet - kitchen remodel; replace bathroom tile - bathroom remodel | $35,000 |
| Jul 26, 2019 | Completed final sign-off Jan 2020 | 65 Terrace Dr | remodel to (e) master bath w/new walk in closet added withing (e) master suite spaceDetails
remodel to (e) master bath w/new walk in closet added withing (e) master suite space | $30,000 |
| Apr 5, 2019 | Completed final sign-off May 2019 | 110 San Felipe Av | bathroom remodel. 70 sq ft. new shower valve, drain, lighting and tiles. replace in kindDetails
bathroom remodel. 70 sq ft. new shower valve, drain, lighting and tiles. replace in kind | $12,000 |
| Sep 7, 2018 | Completed final sign-off Oct 2018 | 5147 Diamond Heights Bl | bathroom remodel, replace bathtub, shower valve, install tile throughout, new gfci and light/fan.Details
bathroom remodel, replace bathtub, shower valve, install tile throughout, new gfci and light/fan. | $10,000 |
| Jul 24, 2018 | Completed final sign-off Sep 2018 | 65 Downey St | bathroom remodel. replace vanity and toilet. retile shower wall. tile ready pan.Details
bathroom remodel. replace vanity and toilet. retile shower wall. tile ready pan. | $10,000 |
| Jan 3, 2018 | Completed final sign-off Feb 2018 | 3301 Mission St | unit 402: replace two bathroom sink vanities. retile floors and walls. tub to remain. replace gfci and switches.Details
unit 402: replace two bathroom sink vanities. retile floors and walls. tub to remain. replace gfci and switches. | $10,000 |
| Oct 25, 2017 | Completed final sign-off Nov 2017 | 530 19th Av | retile two bathrooms, replace vanities, replace shower valve in one bathroomDetails
retile two bathrooms, replace vanities, replace shower valve in one bathroom | $12,000 |
| Oct 23, 2017 | Completed final sign-off Oct 2017 | 2250 24th St | remove existing linoleum and replace with tile - bathroom floor. re-use, replace all existing fixtures, etc. maher naDetails
remove existing linoleum and replace with tile - bathroom floor. re-use, replace all existing fixtures, etc. maher na | $3,000 |
| Jul 14, 2017 | Completed final sign-off Aug 2017 | 34 Beideman St | (1) bathroom remodel. new tub, shower valve, tile floor and tub surround. replace exhaust fan and vanity, toilet and wire for bidet.Details
(1) bathroom remodel. new tub, shower valve, tile floor and tub surround. replace exhaust fan and vanity, toilet and wire for bidet. | $7,500 |
| Jun 14, 2016 | Completed final sign-off Jun 2016 | 1329 Pierce St | add outlets to countertop circuits, replace sink, faucet, vanity in bathroom. replace sink, faucet, dishwasher, countertop in kitchen.Details
add outlets to countertop circuits, replace sink, faucet, vanity in bathroom. replace sink, faucet, dishwasher, countertop in kitchen. | $800 |
| Nov 21, 2014 | Completed final sign-off Jan 2015 | 842 33rd Av | replace kitchen cabinets and countertop (2 kitchens) re-tle bathroom walls and floor (2 bathrooms) new sink in kitchen and bathroomDetails
replace kitchen cabinets and countertop (2 kitchens) re-tle bathroom walls and floor (2 bathrooms) new sink in kitchen and bathroom | $30,000 |