Back to kitchen remodel contractors
Nassif A Ayyad
- Based in
- Milpitas
- On San Francisco permits
- Apr 2009 to Sep 2024
- Last 24 months
- 0 permits filed
49 permits since 2000: 34 completed, 1 in progress, 11 never finaled, 3 expired or cancelled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 3 never finaled. Typically 38 days from filing to permit and 232 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 6, 2023 | Completed final sign-off Jul 2024 | 1249 Masonic Av | replace kitchen fixtures in kind. remodel. no new wall. no extg wall relocation. new lighting. shall comply with cec 150.0 kDetails
replace kitchen fixtures in kind. remodel. no new wall. no extg wall relocation. new lighting. shall comply with cec 150.0 k | $15,000 |
| Jan 12, 2022 | Never finaled issued Mar 2022, no final | 1697 Oak St | unit 2: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. (n)bedroom & bathroomDetails
unit 2: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. (n)bedroom & bathroom | $30,000 |
| Jan 11, 2022 | Never finaled issued Mar 2022, no final | 1697 Oak St | unit 3: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen.Details
unit 3: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. | $30,000 |
| Jun 1, 2021 | Completed final sign-off Sep 2022 | 632 Geneva Av | remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f.Details
remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f. | $30,000 |
| Jan 19, 2017 | Completed final sign-off Sep 2017 | 4103 California St | reconfigure unit # 4103 california street at upper floor plan. new bathroom at unit 4103 california st. at upper floor. remodel kitchen. n/a for maherDetails
reconfigure unit # 4103 california street at upper floor plan. new bathroom at unit 4103 california st. at upper floor. remodel kitchen. n/a for maher | $50,000 |
| Oct 13, 2016 | Completed final sign-off Jul 2017 | 1515 15th St | g/f #205 -revision to 201611203287 new kitchen, new hood type 1 4'x12', new accessible counter. new 3 compartment sink, new 2 hand sinks, new quarrt tile floor w/quarry tile cove. new ansul fire suppression system/sprinklers under sep permit. reconnect to (e) fa under sep permit maher naDetails
g/f #205 -revision to 201611203287 new kitchen, new hood type 1 4'x12', new accessible counter. new 3 compartment sink, new 2 hand sinks, new quarrt tile floor w/quarry tile cove. new ansul fire suppression system/sprinklers under sep permit. reconnect to (e) fa under sep permit maher na | $30,000 |
| Feb 22, 2016 | Completed final sign-off Jun 2020 | 528 Kirkham St | vertical addition of 3/f which is set back 15' from the front bldg wall 2' deep deck on all 3 levels. 6' deep staircase to 2nd & 3rd floors. street tree. remove kitchen from 1/f to 3/f & new (2) bedrms & (1) office & 1 1/2 bath on 3rd floor.Details
vertical addition of 3/f which is set back 15' from the front bldg wall 2' deep deck on all 3 levels. 6' deep staircase to 2nd & 3rd floors. street tree. remove kitchen from 1/f to 3/f & new (2) bedrms & (1) office & 1 1/2 bath on 3rd floor. | $150,000 |
| Jan 27, 2012 | Never finaled issued Feb 2012, no final | 1535 Franklin St | install type 1 hood, upgrade entrance door to meet ada, new quarry tile floor with quarry tile cove (kitchen area). ansul fire suppression system under seperate permitDetails
install type 1 hood, upgrade entrance door to meet ada, new quarry tile floor with quarry tile cove (kitchen area). ansul fire suppression system under seperate permit | $20,000 |
| Oct 14, 2011 | Completed final sign-off Feb 2012 | 536 Golden Gate Av | upgrade entrance door to meet ada, new 3 compartment pot sink, new 2 hand sinks, new quarry tile floor with quarry tile cove in kitchen area only.Details
upgrade entrance door to meet ada, new 3 compartment pot sink, new 2 hand sinks, new quarry tile floor with quarry tile cove in kitchen area only. | $10,000 |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 69 Cambon Dr | ti/change of use from beauty salon to pizza restaurant. new electrical,plumbing, tile. add tbar ceiling. new storefront, new kitchen, accessible bathroom. new type i hood and exhaust- fire protection separate permit...Details
ti/change of use from beauty salon to pizza restaurant. new electrical,plumbing, tile. add tbar ceiling. new storefront, new kitchen, accessible bathroom. new type i hood and exhaust- fire protection separate permit... | $110,000 |