Back to bathroom remodel contractors
Nassif A Ayyad
- Based in
- Milpitas
- On San Francisco permits
- Apr 2009 to Sep 2024
- Last 24 months
- 0 permits filed
49 permits since 2000: 34 completed, 1 in progress, 11 never finaled, 3 expired or cancelled.
Of the 11 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 17 completed, 4 never finaled. Typically 16 days from filing to permit and 355 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2024 | Completed final sign-off Dec 2024 | 848 De Haro St | remodel bathroom in kind no wall removal. includes (n) electrical lighting to comply with cfc 150Details
remodel bathroom in kind no wall removal. includes (n) electrical lighting to comply with cfc 150 | $25,000 |
| Dec 14, 2023 | Completed final sign-off Jul 2024 | 1249 Masonic Av | 2/f: install new bathroom @ 1249 masonic. (2nd floor)Details
2/f: install new bathroom @ 1249 masonic. (2nd floor) | $20,000 |
| Mar 17, 2023 | Completed final sign-off Apr 2024 | 4076 18th St | revision to permit 202211186871. new type 1 hood changed to 4' x 8'. upgrade bathroom to ada compliant. new ansul fire suppression system under separate permit.Details
revision to permit 202211186871. new type 1 hood changed to 4' x 8'. upgrade bathroom to ada compliant. new ansul fire suppression system under separate permit. | |
| Mar 17, 2023 | Completed final sign-off Jul 2024 | 1697 Oak St | revision to 201804045547: to capture work between gridline e and f where there will be new perimeter footings (approx 35 foot total on 3 sides); work invovle new footings and plywood shearwalls noted on s1.0; replace interior gypboard throughout in rear bath between grid e and f, each levelDetails
revision to 201804045547: to capture work between gridline e and f where there will be new perimeter footings (approx 35 foot total on 3 sides); work invovle new footings and plywood shearwalls noted on s1.0; replace interior gypboard throughout in rear bath between grid e and f, each level | $5,000 |
| Nov 18, 2022 | Completed final sign-off Apr 2024 | 4076 18th St | reconfigure floor plan (n) type (1) hood 4'x10' upgrade ada entry door, upgrade bathroom, (n) ansul fire suppression system under sep permitDetails
reconfigure floor plan (n) type (1) hood 4'x10' upgrade ada entry door, upgrade bathroom, (n) ansul fire suppression system under sep permit | $10,000 |
| Apr 19, 2022 | Completed final sign-off Sep 2022 | 632 Geneva Av | revision to pa# 202106011398. 1 bathroom is been eliminated. retrofit windows, same size. new furnace. small storage been eliminated.Details
revision to pa# 202106011398. 1 bathroom is been eliminated. retrofit windows, same size. new furnace. small storage been eliminated. | $2,650 |
| Jan 12, 2022 | Never finaled issued Mar 2022, no final | 1697 Oak St | unit 2: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. (n)bedroom & bathroomDetails
unit 2: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. (n)bedroom & bathroom | $30,000 |
| Jan 11, 2022 | Never finaled issued Mar 2022, no final | 1697 Oak St | unit 3: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen.Details
unit 3: reconfigure floor plan for kitchen & bathroom. demo non-loading wall, remodel (e) bathroom & kitchen. | $30,000 |
| Oct 8, 2021 | Completed final sign-off Nov 2022 | 2359 Chestnut St | reconfigure floor plan; upgrade (e) type i hood to (n) type 1 hood. upgrade ada entry door. (n) ada bathroom & accessible counter. (n) ansul fire suppression system under sep permit.Details
reconfigure floor plan; upgrade (e) type i hood to (n) type 1 hood. upgrade ada entry door. (n) ada bathroom & accessible counter. (n) ansul fire suppression system under sep permit. | $40,000 |
| Sep 23, 2021 | Completed final sign-off Mar 2023 | 3000 Mission St | reconfigure floor plans @ unit 3403 26th st. add new bathroom. (coner bldg: 3000 mission st & 3407 26th st)Details
reconfigure floor plans @ unit 3403 26th st. add new bathroom. (coner bldg: 3000 mission st & 3407 26th st) | $40,000 |
| Aug 11, 2021 | Completed final sign-off Apr 2022 | 1406 21st Av | reconfigure upper level floor plan in unit 1406. add new bathroom.Details
reconfigure upper level floor plan in unit 1406. add new bathroom. | $15,000 |
| Jun 1, 2021 | Completed final sign-off Sep 2022 | 632 Geneva Av | remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f.Details
remodel interior portion of the (e) garage to include familyroom and studyroom and 2 new baths. the parking area of garage will not be affected by the remodel. remodel (e) kitchen, living and dinning area. add a second bathroom on 2/f. | $30,000 |
| Mar 20, 2019 | Completed final sign-off Aug 2019 | 1101 Taraval St | reconfigure floor plan. new ada bathroom, new quarytile with quaraytile cove used that areaDetails
reconfigure floor plan. new ada bathroom, new quarytile with quaraytile cove used that area | $40,000 |
| Aug 21, 2017 | Completed final sign-off Dec 2017 | 1408 21st Av | reconfigure floor plan to add bathroom at unit 1408 21st ave. new furance atticDetails
reconfigure floor plan to add bathroom at unit 1408 21st ave. new furance attic | $10,000 |
| Jan 19, 2017 | Completed final sign-off Sep 2017 | 4103 California St | reconfigure unit # 4103 california street at upper floor plan. new bathroom at unit 4103 california st. at upper floor. remodel kitchen. n/a for maherDetails
reconfigure unit # 4103 california street at upper floor plan. new bathroom at unit 4103 california st. at upper floor. remodel kitchen. n/a for maher | $50,000 |
| Dec 30, 2016 | Never finaled issued May 2021, no final | 20 Church St | vertical addition add a 3rd story. add 2 units @ basement & 3rd floor with 2 bathrooms & 1 bath.Details
vertical addition add a 3rd story. add 2 units @ basement & 3rd floor with 2 bathrooms & 1 bath. | $400,000 |
| Feb 22, 2016 | Completed final sign-off Jun 2020 | 528 Kirkham St | vertical addition of 3/f which is set back 15' from the front bldg wall 2' deep deck on all 3 levels. 6' deep staircase to 2nd & 3rd floors. street tree. remove kitchen from 1/f to 3/f & new (2) bedrms & (1) office & 1 1/2 bath on 3rd floor.Details
vertical addition of 3/f which is set back 15' from the front bldg wall 2' deep deck on all 3 levels. 6' deep staircase to 2nd & 3rd floors. street tree. remove kitchen from 1/f to 3/f & new (2) bedrms & (1) office & 1 1/2 bath on 3rd floor. | $150,000 |
| May 13, 2014 | Completed final sign-off Jul 2015 | 376 Ellis St | to comply w/complaint #201337973. replace shower enclosure, replace sinks, replace floor covering bathroom.Details
to comply w/complaint #201337973. replace shower enclosure, replace sinks, replace floor covering bathroom. | $1,500 |
| May 13, 2014 | Completed final sign-off Jul 2015 | 376 Ellis St | to comply w/complaint #201330631. repair damaged loose top surround in bathroom, apart 104Details
to comply w/complaint #201330631. repair damaged loose top surround in bathroom, apart 104 | $500 |
| May 9, 2014 | Never finaled issued Jun 2014, no final | 1278 Thomas Av | to comply with complaint # 201458041 & 201321642, repair bathroom floor, paint & clean moldDetails
to comply with complaint # 201458041 & 201321642, repair bathroom floor, paint & clean mold | $2,500 |
| Apr 22, 2009 | Completed final sign-off Sep 2009 | 69 Cambon Dr | ti/change of use from beauty salon to pizza restaurant. new electrical,plumbing, tile. add tbar ceiling. new storefront, new kitchen, accessible bathroom. new type i hood and exhaust- fire protection separate permit...Details
ti/change of use from beauty salon to pizza restaurant. new electrical,plumbing, tile. add tbar ceiling. new storefront, new kitchen, accessible bathroom. new type i hood and exhaust- fire protection separate permit... | $110,000 |