Mutual Seiko Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2023
- Last 24 months
- 0 permits filed
248 permits since 2000: 214 completed, 20 never finaled, 14 expired or cancelled.
Of the 20 never-finaled permits, 6 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
4 roof deck permits: 4 completed. Typically 10 days from filing to permit and 190 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 12, 2019 | Completed final sign-off Feb 2020 | 539 Ortega St | comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck.Details
comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck. | $89,000 |
| Jan 31, 2019 | Completed final sign-off Oct 2019 | 333 Diamond St | revision to approved bpa #201610271260. add roof deck with exterior stairs. reduction in envelope for exterior staircaseDetails
revision to approved bpa #201610271260. add roof deck with exterior stairs. reduction in envelope for exterior staircase | |
| Apr 29, 2016 | Completed final sign-off Nov 2016 | 3922 18th St | infill lightwell at 1st and 2nd floor. infill below 2nd floor rear extension. no change to front facade. no change to bldg height or depth. interior remodel.add roof deck with exterior staircase within bldg envelopeDetails
infill lightwell at 1st and 2nd floor. infill below 2nd floor rear extension. no change to front facade. no change to bldg height or depth. interior remodel.add roof deck with exterior staircase within bldg envelope | $80,000 |
| Jul 9, 2009 | Completed final sign-off Apr 2010 | 1771 38th Av | addendum revision to pa# 2008-0528-3051-s1, open living room into dining room & kitchen with removal of a atrium on 2nd floor. enlarge 3rd floor bedroom within setbacks. add deck access from 3rd floor hallway. remove living room roof deck, roof to remainDetails
addendum revision to pa# 2008-0528-3051-s1, open living room into dining room & kitchen with removal of a atrium on 2nd floor. enlarge 3rd floor bedroom within setbacks. add deck access from 3rd floor hallway. remove living room roof deck, roof to remain |