Back to kitchen remodel contractors
Mutual Seiko Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2000 to Aug 2023
- Last 24 months
- 0 permits filed
248 permits since 2000: 214 completed, 20 never finaled, 14 expired or cancelled.
Of the 20 never-finaled permits, 6 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
49 kitchen remodel permits: 44 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 139 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 27, 2022 | Completed final sign-off Apr 2023 | 551 Holyoke St | remove interior staircase & infill opening. re-arrange (e) bathroom. construct fire wall between garage & install (n) kitchenette. all work at ground floor.Details
remove interior staircase & infill opening. re-arrange (e) bathroom. construct fire wall between garage & install (n) kitchenette. all work at ground floor. | $15,000 |
| Mar 5, 2021 | Completed final sign-off Mar 2021 | 295 Monterey Bl | remodel kitchen and 1 bath in kind. walls and opening stay the same.Details
remodel kitchen and 1 bath in kind. walls and opening stay the same. | $20,000 |
| Oct 28, 2020 | Completed final sign-off Sep 2022 | 133 Lake St | remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows.Details
remodel existing garage and install new garage door. repair dry-rot in eisting stairs at rear. unit #135: remodel bathroom, kitchen, and repair dry rot. replace west & south windows. | $150,000 |
| Dec 27, 2019 | Completed final sign-off Sep 2020 | 3090 21st Av | remove & replace kitchen ceramic tilt floor, replace face kitchen cabinets, replace kitchen counter top.Details
remove & replace kitchen ceramic tilt floor, replace face kitchen cabinets, replace kitchen counter top. | $20,000 |
| Nov 12, 2019 | Completed final sign-off Feb 2020 | 539 Ortega St | comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck.Details
comply with complaint #20199732 & 201999741. interior rmeodel existing kitchen & two bathrooms. conert existing unoccupy space to new bedroom & full bath room at first floor. construct new roof deck. | $89,000 |
| Nov 12, 2019 | Completed final sign-off Dec 2020 | 1358 46th Av | reface kitchen cabinet, replace flooring. replace bath wall & floor tiles.Details
reface kitchen cabinet, replace flooring. replace bath wall & floor tiles. | $4,000 |
| Sep 13, 2019 | Completed final sign-off Feb 2020 | 539 Ortega St | removal kitchen & bathroom. remove fire place in living room.Details
removal kitchen & bathroom. remove fire place in living room. | $30,000 |
| Sep 4, 2019 | Never finaled issued Sep 2019, no final | 1217 05th Av | remove old terra-lotta vent from kitchen to roof. patch openings to roof.Details
remove old terra-lotta vent from kitchen to roof. patch openings to roof. | $2,000 |
| Nov 13, 2018 | Completed final sign-off Feb 2019 | 2621 Clement St | reface kitchen cabinets install tile around tub, (e) fixtures to remainDetails
reface kitchen cabinets install tile around tub, (e) fixtures to remain | $5,000 |
| Sep 7, 2018 | Completed final sign-off May 2019 | 2110 21st Av | remodel (e) kitchen, bathroom and add 1 new nath at 2nd flr. add skylights per plan.Details
remodel (e) kitchen, bathroom and add 1 new nath at 2nd flr. add skylights per plan. | $35,000 |
| Jan 4, 2018 | Completed final sign-off Jul 2019 | 842 48th Av | reface kitchen cabinet & replace bathroom floor tileDetails
reface kitchen cabinet & replace bathroom floor tile | $3,000 |
| Nov 16, 2017 | Completed final sign-off Aug 2018 | 1205 San Bruno Av | interior remodel on 2/f, relocate kitchen & bath. add new bath, relocate interior stairs to connect to 1/f, convert area behind garage to 2 bedrooms & 2 baths, built new deck 5'x19' at rear with stairs, replace brick foundation.Details
interior remodel on 2/f, relocate kitchen & bath. add new bath, relocate interior stairs to connect to 1/f, convert area behind garage to 2 bedrooms & 2 baths, built new deck 5'x19' at rear with stairs, replace brick foundation. | $80,000 |
| Mar 3, 2017 | Completed final sign-off Mar 2018 | 447 Sutter St | convert (e) conference room to kitchenDetails
convert (e) conference room to kitchen | $7,000 |
| Dec 9, 2016 | Completed final sign-off Oct 2017 | 1340 Washington St | #7- remodel kitchen & bath in kind, replace counter & fixtures. n/a for maher ordinance no.155-13.Details
#7- remodel kitchen & bath in kind, replace counter & fixtures. n/a for maher ordinance no.155-13. | $20,000 |
| Oct 13, 2016 | Completed final sign-off Feb 2019 | 1273 10th Av | adu per ord #162-16 including (1) bedrooms, (2) full baths, kitchen, living room, media room, office & laundry on ground floor. grd fl sprinklered to nfpa-13 on deferred submittal.Details
adu per ord #162-16 including (1) bedrooms, (2) full baths, kitchen, living room, media room, office & laundry on ground floor. grd fl sprinklered to nfpa-13 on deferred submittal. | $50,000 |
| Apr 18, 2016 | Completed final sign-off May 2016 | 1938 30th Av | to comply with complaint # 201609051, remodel bathroom repalce toilet in kind, remodel kitchen, replace cabinetsDetails
to comply with complaint # 201609051, remodel bathroom repalce toilet in kind, remodel kitchen, replace cabinets | $10,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2016 | 814 Detroit St | add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level.Details
add 2 bedrooms & bath & laundry on lower level & remodel bath on upper level, partial remodel kitchen, seismic upgrade lower level. | $150,000 |
| Nov 19, 2015 | Completed final sign-off Apr 2016 | 132 Encline Ct | remodel (e) 2nd floor kitchen and bath. add one bathroom. remove center patio walls. structural support at ceiling. new skylights.Details
remodel (e) 2nd floor kitchen and bath. add one bathroom. remove center patio walls. structural support at ceiling. new skylights. | $50,000 |
| May 12, 2015 | Completed final sign-off Sep 2015 | 2349 27th Av | unit #2 - remodel kitchen & bathroom.Details
unit #2 - remodel kitchen & bathroom. | $15,000 |
| Jun 24, 2014 | Completed final sign-off Aug 2014 | 1428 Cabrillo St | reface kitchen cabinet & replace counter top.Details
reface kitchen cabinet & replace counter top. | $5,000 |
| May 27, 2014 | Completed final sign-off Oct 2014 | 411 Bowdoin St | add one unit to extg envelope of single family building. new kitchen on 3rd floor. add one hour rated walls and one hour rated doors at stair enclosure. no exterior changes.Details
add one unit to extg envelope of single family building. new kitchen on 3rd floor. add one hour rated walls and one hour rated doors at stair enclosure. no exterior changes. | $8,000 |
| Nov 22, 2013 | Completed final sign-off Apr 2015 | 1894 Donner Av | interior remodel to add 2 bedrooms, 2 baths, and one family room on first floor. remodel (e) kitchen & bathroom on 2nd floor.Details
interior remodel to add 2 bedrooms, 2 baths, and one family room on first floor. remodel (e) kitchen & bathroom on 2nd floor. | $60,000 |
| Sep 16, 2013 | Completed final sign-off Nov 2015 | 177 19th Av | remodeling kitchens & bathrooms in two unitDetails
remodeling kitchens & bathrooms in two unit | $25,000 |
| Jul 23, 2013 | Completed final sign-off Oct 2013 | 1635 Bush St | replace kitchen cabinets and replace bathroom floor and wall tile unit #7Details
replace kitchen cabinets and replace bathroom floor and wall tile unit #7 | $8,000 |
| Jun 4, 2013 | Completed final sign-off Oct 2013 | 492 45th Av | replace kitchen cabinets. replace wall and floor tiles in bathroomDetails
replace kitchen cabinets. replace wall and floor tiles in bathroom | $5,000 |
| Apr 9, 2013 | Completed final sign-off Jul 2013 | 619 Greenwich St | remodel kitchen and bathroom in unit 619Details
remodel kitchen and bathroom in unit 619 | $25,000 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 15 Phoenix Tr | replace kitchen cabinet & countertop, remodel existing hallway bathroom.Details
replace kitchen cabinet & countertop, remodel existing hallway bathroom. | $20,000 |
| Nov 15, 2012 | Completed final sign-off May 2013 | 1435 Clement St | replace kitchen cabinets, countertops, remodel existing bathroom, replace rear window like for like window, not visible from streetDetails
replace kitchen cabinets, countertops, remodel existing bathroom, replace rear window like for like window, not visible from street | $20,000 |
| Nov 15, 2012 | Completed final sign-off Jan 2013 | 1635 Bush St | reface existing kitchen cabinetsDetails
reface existing kitchen cabinets | $3,000 |
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 1355 California St | remodel one kitchen and one bathroom in unit #5, no wall relocation. change four rear windows like for like same size openings. u-factor for windows not to exceed 0.40Details
remodel one kitchen and one bathroom in unit #5, no wall relocation. change four rear windows like for like same size openings. u-factor for windows not to exceed 0.40 | $20,000 |
| Jun 12, 2012 | Completed final sign-off Jul 2012 | 1037 Clay St | remodel one kitchen & one bathroom in unit #3, no wall relocation. a min. of 50% of total rated wattage of installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensors.Details
remodel one kitchen & one bathroom in unit #3, no wall relocation. a min. of 50% of total rated wattage of installed lighting in kitchen shall be high efficacy. permanently installed lights in bathroom shall be high efficacy unless controlled by manual on occupancy sensors. | $15,000 |
| Mar 26, 2012 | Completed final sign-off Apr 2012 | 3701 Geary Bl | reface kitchen cabinets & change counter top, replace kitchen sink & faucet.Details
reface kitchen cabinets & change counter top, replace kitchen sink & faucet. | $5,000 |
| Feb 27, 2012 | Completed final sign-off Apr 2012 | 617 Moscow St | remodel kitchen and bathroom on upper floor level, no structural work, new lighting comply with cec150(k)Details
remodel kitchen and bathroom on upper floor level, no structural work, new lighting comply with cec150(k) | $15,000 |
| Jul 28, 2011 | Completed final sign-off Jan 2012 | 1547 Powell St | repair all fire damaged wall and celing with 5/8 type x gb. replace all damaged bathrooms and kitchen. add 1/2 bath on 1st and 2nd fl. replace fireplace,furnaces and hot water heaters. replace portion of e foundation in basement. existing plaster wall and ceiling removal under apprv app 201107261095Details
repair all fire damaged wall and celing with 5/8 type x gb. replace all damaged bathrooms and kitchen. add 1/2 bath on 1st and 2nd fl. replace fireplace,furnaces and hot water heaters. replace portion of e foundation in basement. existing plaster wall and ceiling removal under apprv app 201107261095 | $50,000 |
| Feb 10, 2011 | Completed final sign-off May 2011 | 633 Huron Av | remodel existing kitchen and bathroomDetails
remodel existing kitchen and bathroom | $20,000 |
| Jan 20, 2011 | Completed final sign-off May 2011 | 326 Tara St | replace kitchen cabinet & retile walls & floor, no structural changes, u-factor=0.40, no visible from street.Details
replace kitchen cabinet & retile walls & floor, no structural changes, u-factor=0.40, no visible from street. | $8,000 |
| Jul 8, 2010 | Completed final sign-off Sep 2010 | 2200 Pacific Av | unit #8a: repair and replace kitchen cabinets. install ceramic tile floor on bathroom. no lighting work. no change in exhaust system.Details
unit #8a: repair and replace kitchen cabinets. install ceramic tile floor on bathroom. no lighting work. no change in exhaust system. | $10,000 |
| Sep 14, 2009 | Completed final sign-off Jan 2010 | 779 14th Av | convert existing ground floor room from exercise & storage to bedrooms, provide connection from 2nd floor to ground floor. remode 2nd floor kitchen & abthrooms.Details
convert existing ground floor room from exercise & storage to bedrooms, provide connection from 2nd floor to ground floor. remode 2nd floor kitchen & abthrooms. | $40,000 |
| Jul 9, 2009 | Completed final sign-off Apr 2010 | 1771 38th Av | addendum revision to pa# 2008-0528-3051-s1, open living room into dining room & kitchen with removal of a atrium on 2nd floor. enlarge 3rd floor bedroom within setbacks. add deck access from 3rd floor hallway. remove living room roof deck, roof to remainDetails
addendum revision to pa# 2008-0528-3051-s1, open living room into dining room & kitchen with removal of a atrium on 2nd floor. enlarge 3rd floor bedroom within setbacks. add deck access from 3rd floor hallway. remove living room roof deck, roof to remain | |
| Jun 26, 2009 | Completed final sign-off Jan 2010 | 1340 Washington St | work @ unit# 14 only. replace kitchen cabinets. upper cabinets & 2 lower cabinets. no counter replacement.Details
work @ unit# 14 only. replace kitchen cabinets. upper cabinets & 2 lower cabinets. no counter replacement. | $3,500 |
| Mar 13, 2009 | Completed final sign-off May 2009 | 1745 Page St | work @ unit# 3 only. remodel existing kitchen. replace counter top & sink & other minor. non structural work. interior only.Details
work @ unit# 3 only. remodel existing kitchen. replace counter top & sink & other minor. non structural work. interior only. | $5,100 |
| Dec 23, 2008 | Completed final sign-off Nov 2009 | 405 Saint Francis Bl | remove & replace kitchen cabinets & counter top. replace bathrooms cabinets & floor. no lighting change.Details
remove & replace kitchen cabinets & counter top. replace bathrooms cabinets & floor. no lighting change. | $18,000 |
| Nov 28, 2007 | Completed final sign-off Mar 2008 | 939 Jones St | replace bathroom floor tile and kitchen floor tile. comply with his nov#200798895, & #200701541.Details
replace bathroom floor tile and kitchen floor tile. comply with his nov#200798895, & #200701541. | $5,000 |
| Nov 27, 2007 | Completed final sign-off Apr 2008 | 779 14th Av | work on unit#2. remodel kitchen and bathroom.Details
work on unit#2. remodel kitchen and bathroom. | $30,000 |
| May 10, 2007 | Completed final sign-off Aug 2008 | 93 Monterey Bl | extend deck, remodel master bath (bath -1), replace kitchen cabinets and bath-3 cabinetsDetails
extend deck, remodel master bath (bath -1), replace kitchen cabinets and bath-3 cabinets | $43,000 |
| Dec 20, 2005 | Completed final sign-off May 2006 | 1834 35th Av | remodel kitchenDetails
remodel kitchen | $5,000 |
| Jan 28, 2005 | Never finaled issued Jan 2005, no final | 75 Liberty St | remodel kitchen and bath per plan. replace lath and plaster w/ sheetrock in the area.......Details
remodel kitchen and bath per plan. replace lath and plaster w/ sheetrock in the area....... | $15,000 |
| Oct 30, 2003 | Expired or cancelled cancelled Jul 2007 | 1060 Jackson St | replace 20 dry rot windows,d.h.windows, repair cracked stucco, remodel kitchen/bathDetails
replace 20 dry rot windows,d.h.windows, repair cracked stucco, remodel kitchen/bath | $48,000 |
| May 14, 2003 | Expired or cancelled expired Jun 2006 | 1759 14th Av | replace kitchen cabinets & tileDetails
replace kitchen cabinets & tile | $3,000 |